ABSTRACT

Heavy Duty Trakpanel; per panel (3.05×2.59 per week – – – – – m2 5.32 Outrigger Mats for use in conjunction with Heavy Duty Trakpanels; per set of 4mats per week – – – – – set 85.00 Medium Duty Trakpanel; per panel (2.44×3.00 per week – – – – – m2 5.74 LD20 Eveolution; Light Duty Trakway; roll out system minimum delivery 50m – – – – – m2 5.25 Terraplas Walkways; turf protection system; per section (1 × 1m); per week – – – – – m2 5.50