ABSTRACT

NOTES General The prices in this section are to include for the removal of superficial obstructions down to existing ground level.

Demolition of individual or groups of buildings or structures

MMHW states that individual structures should be itemised. The following rates are given as £ per m3 to simpify the pricing of different sized structures. (Refer also to Part 4 of this book Section D)

RESOURCESLABOUR

Clearance gang 1 ganger/chargehand (skill rate 4)

10.66

1 skilled operative (skill rate 4)

10.16

2 unskilled operatives (general)

19.04

1 plant operator (skill rate 3)

12.38

Total Gang Rate/Hour

£ 52.24

RESOURCES-

0.8 m3 tractor loader-50% of time

8.33

8 t lorry with hiab-25% of time

4.39

4 t dumper-50% of time

3.06

20 t mobile crane-25% of time

7.68

compressor, 11.3 m3/min (450 cfm), 4 tool

5.31

compressor tools: two brick hammers/picks50% of time

0.28

compressor tools: chipping hammer

0.38

compressor tools: medium rock drill 30

0.07

compressor tools: road breaker

0.35

compressor tools: two 15 m lengths hose

0.23

Total Gang Rate/Hour

£ 30.08

SITE CLEARANCE

General site clearance

open field site 9.91 517.70 298.41 – ha 816.11 medium density wooded

20.61 1076.67 620.54 – ha 1697.20

heavy density wooded

32.09 1676.38 966.19 – ha 2642.57

urban areas (town centre)

30.60 1598.54 921.40 – ha 2519.94

live dual carriageway

30.60 1598.54 921.40 – ha 2519.94

Demolition of building or structure

timber floor and roof

rate £ building; brick construction with concrete floor and roof

– – – – m37.62

building; masonry construction with timber floor and roof

– – – – m35.96

building; reinforced concrete frame construction with brick infill

– – – – m37.93

building; steel frame construction with brick infill

– – – – m34.31

building; steel frame construction with cladding

– – – – m34.10

building; timber

– – – – m33.64

reinforced concrete bridge deck or superstructure

– – – – m36.86

reinforced concrete bridge abutment or bank seat

– – – – m326.98

reinforced concrete retaining wall

– – – – m3100.00

brick or masonry retaining wall

– – – – m355.00

brick or masonry boundary wall

– – – – m345.00

TAKE UP OR DOWN AND SET ASIDE FOR RE-USE OR REMOVE TO STORE OR TIP OFF SITE

Take up or down and set aside for re-use

precast concrete kerbs and channels

0.02 0.89 1.52 – m 2.40

precast concrete edgings

0.01 0.67 1.16 – m 1.83

precast concrete drainage and kerb blocks

0.02 1.11 1.87 – m 2.99

precast concrete drainage channel systems

0.02 1.11 1.87 – m 2.99

tensioned single sided corrugated beam safety fence

0.14 7.31 4.23 – m 11.54

timber post and 4 rail fence

0.08 4.18 2.41 – m 6.59

bench seat 0.13 6.79 4.66 – nr 11.45 cattle trough 0.16 8.15 5.57 – nr 13.72 permanent bollard

0.13 6.79 4.66 – nr 11.45

pedestrian crossing lights; pair

0.26 13.58 7.84 – nr 21.42

lighting column including bracket arm and lantern; 5 m high

0.58 30.30 17.47 – nr 47.77

lighting 0.61 31.87 18.34 – nr 50.21

bracket arm and lantern; 10 m high traffic sign 0.26 13.58 7.84 – nr 21.42 timber gate 0.13 6.79 4.66 – nr 11.45 timber gate 0.13 6.79 4.66 – nr 11.45 stile 0.13 6.79 4.66 – nr 11.45 road stud 0.03 1.36 0.92 – nr 2.27 chamber cover and frame

0.03 1.36 0.92 – nr 2.27

gully grating and frame

0.03 1.36 0.92 – nr 2.27

feeder pillars 0.03 1.36 0.92 – nr 2.27 Take up or down and remove to store off site

precast concrete kerbs and channels

0.02 0.89 3.36 – m 4.25

precast concrete edgings

0.01 0.67 2.54 – m 3.21

precast concrete drainage and kerb blocks

0.02 1.11 4.18 – m 5.29

precast concrete drainage channel systems

0.02 1.11 4.18 – m 5.29

tensioned single sided corrugated beam safety fence

0.14 7.31 5.75 – m 13.06

timber post and 4 rail fence

0.08 4.18 3.27 – m 7.45

bench seat 0.13 6.79 10.29 – nr 17.09 cattle trough 0.16 8.15 12.34 – nr 20.49

pedestrian crossing lights; pair

0.26 13.58 10.66 – nr 24.24

lighting column including bracket arm and lantern; 5 m high

0.58 30.30 23.76 – nr 54.05

lighting column including bracket arm and lantern; 10 m high

0.61 31.87 24.95 – nr 56.82

traffic sign 0.26 13.58 10.66 – nr 24.24 timber gate 0.13 6.79 10.29 – nr 17.09 timber gate 0.13 6.79 10.29 – nr 17.09 stile 0.13 6.79 10.29 – nr 17.09 road stud 0.03 1.36 2.04 – nr 3.40 chamber cover and frame

0.03 1.36 2.04 – nr 3.40

gully grating and frame

0.03 1.36 2.04 – nr 3.40

feeder pillars 0.03 1.36 2.04 – nr 3.40 Take up or down and remove to tip off site

tensioned single sided corrugated beam safety fence

0.17 8.88 5.22 – m 14.10

timber post and 4 rail fence

0.09 4.70 2.76 – m 7.46

low pressure gas mains up to 150 mm diameter

0.04 2.09 1.23 – m 3.32

low pressure water mains up to 75 mm diameter

0.03 1.57 0.93 – m 2.50

power cable laid singly

0.03 1.57 0.93 – m 2.50

lighting 0.82 42.84 25.25 – nr 68.08

bracket arm and lantern; 5 m high lighting column including bracket arm and lantern; 10 m high

0.85 44.40 26.14 – nr 70.55

traffic sign including posts

0.38 19.85 11.37 – nr 31.22

Removal of existing reflectorised thermoplastic road markings

100 mm wide line

– – – – m 1.00

150 mm wide line

– – – – m 1.50

200 mm wide line

– – – – m 2.00

arrow or letter ne 6.0 m long

– – – – nr 15.50

arrow or letter 6.0-16.0 m long

– – – – nr 65.00