ABSTRACT
Isolated casings, half brick thick, faced all round m2 2.30 32.20 23.41 8.34 63.95
Isolated piers, one brick thick, faced all round m2 2.30 32.20 62.38 14.19 108.77
Arches
215mm high, 102mm wide m2 1.30 18.20 4.36 3.38 25.94
215mm high, 215mm wide m2 2.00 28.00 7.34 5.30 40.64
215mm high, 102mm wide, segmental m2 2.70 37.80 8.30 6.92 53.02
215mm high, 315mm wide, segmental m2 3.80 53.20 12.00 9.78 74.98
Facing bricks (basic price £350 per thousand) in
cement mortar (1:3), English garden wall bond
walls, facework one side
half brick thick m2 1.80 25.20 28.63 8.07 61.90
half brick thick curved m2 2.40 33.60 28.63 9.33 71.56
one brick thick m2 2.90 40.60 57.26 14.68 112.54
one brick thick curved m2 3.50 49.00 57.26 15.94 122.20
one and a half brick thick m2 3.60 50.40 85.89 20.44 156.73
two brick thick m2 4.30 60.20 114.57 26.22 200.99
two brick thick battered m2 4.90 68.60 114.57 27.48 210.65
walls, facework both sides
half brick thick m2 1.90 32.11 28.63 9.11 69.85
half brick thick curved m2 2.50 40.56 28.63 10.38 79.57
one brick thick m2 3.00 50.70 57.26 16.19 124.15
Unit Labour Hours
£
Mat’ls
£
O & P
£
Total
£
one brick thick curved m2 3.60 60.84 57.26 17.72 135.82
one and a half brick thick m2 3.70 62.53 85.89 22.26 170.68
two brick thick m2 4.40 74.36 114.57 28.34 217.27
two brick thick battered m2 5.00 70.00 114.57 27.69 212.26
Isolated casings, half brick thick, faced all round m2 2.30 32.20 28.63 9.12 69.95
Isolated piers, one brick thick, faced all round m2 2.30 32.20 57.26 13.42 102.88
Arches
215mm high, 102mm wide m2 1.30 18.20 6.30 3.68 28.18
215mm high, 215mm wide m2 2.00 28.00 6.64 5.20 39.84
215mm high, 102mm wide, segmental m2 2.70 37.80 7.52 6.80 52.12
215mm high, 315mm wide, segmental m2 3.80 53.20 10.80 9.60 73.60
Facing bricks (basic price £500 per thousand) in
cement mortar (1:3), English garden wall bond
walls, facework one side
half brick thick m2 1.80 25.20 34.85 9.01 69.06
half brick thick curved m2 2.40 33.60 34.85 10.27 78.72
one brick thick m2 2.90 40.60 69.70 16.55 126.85
one brick thick curved m2 3.50 49.00 69.70 17.81 136.51
one and a half brick thick m2 3.60 50.40 103.55 23.09 177.04
two brick thick m2 4.30 60.20 139.40 29.94 229.54
two brick thick battered m2 4.90 68.60 139.40 31.20 239.20
walls, facework both sides
half brick thick m2 1.90 32.11 34.85 10.04 77.00
half brick thick curved m2 2.50 40.56 34.85 11.31 86.72
one brick thick m2 3.00 50.70 69.70 18.06 138.46
one brick thick curved m2 3.60 60.84 69.70 19.58 150.12
one and a half brick thick m2 3.70 62.53 103.55 24.91 190.99
two brick thick m2 4.40 74.36 139.40 32.06 245.82
two brick thick battered m2 5.00 70.00 139.40 31.41 240.81
Unit Labour Hours
£
Mat’ls
£
O & P
£
Total
£
Isolated casings, half brick thick, faced all
round
m2 2.30 32.20 34.85 10.06 77.11
Isolated piers, one brick thick, faced all round m2 2.30 32.20 34.85 10.06 77.11
Arches
215mm high, 102mm wide m2 1.30 18.20 8.73 4.04 30.97
215mm high, 215mm wide m2 2.00 28.00 14.68 6.40 49.08
215mm high, 102mm wide, segmental m2 2.70 37.80 16.54 8.15 62.49
215mm high, 315mm wide, segmental m2 3.80 53.20 23.13 11.45 87.78
Facing bricks (basic price £250 per thousand) in
cement mortar (1:3), flemish bond
walls, facework one side
half brick thick m2 1.80 25.20 23.41 7.29 55.90
half brick thick curved m2 2.40 33.60 23.41 8.55 65.56
one brick thick m2 2.90 40.60 62.38 15.45 118.43
one brick thick curved m2 3.50 49.00 62.38 16.71 128.09
one and a half brick thick m2 3.60 50.40 76.68 19.06 146.14
two brick thick m2 4.30 60.20 102.38 24.39 186.97
two brick thick battered m2 4.90 68.60 102.38 25.65 196.63
walls, facework both sides
half brick thick m2 1.90 32.11 23.41 8.33 63.85
half brick thick curved m2 2.50 40.56 23.41 9.60 73.57
one brick thick m2 3.00 50.70 62.38 16.96 130.04
one brick thick curved m2 3.60 60.84 62.38 18.48 141.70
one and a half brick thick m2 3.70 62.53 76.68 20.88 160.09
two brick thick m2 4.40 74.36 102.38 26.51 203.25
two brick thick battered m2 5.00 70.00 102.38 25.86 198.24
Isolated casings, half brick thick, faced all
round
m2 2.30 32.20 23.41 8.34 63.95
Isolated piers, one brick thick, faced all round m2 2.30 32.20 62.38 14.19 108.77
Unit Labour Hours
£
Mat’ls
£
O & P
£
Total
£
215mm high, 102mm wide m2 1.30 18.20 4.36 3.38 25.94
215mm high, 215mm wide m2 2.00 28.00 7.34 5.30 40.64
215mm high, 102mm wide, segmental m2 2.70 37.80 8.30 6.92 53.02
215mm high, 315mm wide, segmental m2 3.80 53.20 12.00 9.78 74.98
Facing bricks (basic price £350 per thousand)
in cement mortar (1:3), flemish bond
walls, facework one side
half brick thick m2 1.80 25.20 28.63 8.07 61.90
half brick thick curved m2 2.40 33.60 28.63 9.33 71.56
one brick thick m2 2.90 40.60 57.26 14.68 112.54
one brick thick curved m2 3.50 49.00 57.26 15.94 122.20
one and a half brick thick m2 3.60 50.40 85.89 20.44 156.73
two brick thick m2 4.30 60.20 114.57 26.22 200.99
two brick thick battered m2 4.90 68.60 114.57 27.48 210.65
walls, facework both sides
half brick thick m2 1.90 32.11 28.63 9.11 69.85
half brick thick curved m2 2.50 40.56 28.63 10.38 79.57
one brick thick m2 3.00 50.70 57.26 16.19 124.15
one brick thick curved m2 3.60 60.84 57.26 17.72 135.82
one and a half brick thick m2 3.70 62.53 85.89 22.26 170.68
two brick thick m2 4.40 74.36 114.57 28.34 217.27
two brick thick battered m2 5.00 70.00 114.57 27.69 212.26
Isolated casings, half brick thick, faced all
round
m2 2.30 32.20 28.63 9.12 69.95
Isolated piers, one brick thick, faced all round m2 2.30 32.20 57.26 13.42 102.88
Arches
215mm high, 102mm wide m2 1.30 18.20 6.30 3.68 28.18
215mm high, 215mm wide m2 2.00 28.00 6.64 5.20 39.84
215mm high, 102mm wide, segmental m2 2.70 37.80 7.52 6.80 52.12
215mm high, 315mm wide, segmental m2 3.80 53.20 10.80 9.60 73.60
Arches
Unit Labour Hours
£
Mat’ls
£
O & P
£
Total
£
half brick thick m2 1.80 25.20 34.85 9.01 69.06
half brick thick curved m2 2.40 33.60 34.85 10.27 78.72
one brick thick m2 2.90 40.60 69.70 16.55 126.85
one brick thick curved m2 3.50 49.00 69.70 17.81 136.51
one and a half brick thick m2 3.60 50.40 103.55 23.09 177.04
two brick thick m2 4.30 60.20 139.40 29.94 229.54
two brick thick battered m2 4.90 68.60 139.40 31.20 239.20
walls, facework both sides
half brick thick m2 1.90 32.11 34.85 10.04 77.00
half brick thick curved m2 2.50 40.56 34.85 11.31 86.72
one brick thick m2 3.00 50.70 69.70 18.06 138.46
one brick thick curved m2 3.60 60.84 69.70 19.58 150.12
one and a half brick thick m2 3.70 62.53 103.55 24.91 190.99
two brick thick m2 4.40 74.36 139.40 32.06 245.82
two brick thick battered m2 5.00 70.00 139.40 31.41 240.81
Isolated casings, half brick thick, faced all
round
m2 2.30 32.20 34.85 10.06 77.11
Isolated piers, one brick thick, faced all round m2 2.30 32.20 34.85 10.06 77.11
Arches
215mm high, 102mm wide m2 1.30 18.20 8.73 4.04 30.97
215mm high, 215mm wide m2 2.00 28.00 14.68 6.40 49.08
215mm high, 102mm wide, segmental m2 2.70 37.80 16.54 8.15 62.49
215mm high, 315mm wide, segmental m2 3.80 53.20 23.13 11.45 87.78
MASONRY
Random rubble walling, laid dry, thickness
300mm m2 3.00 42.00 50.38 13.86 106.24
450mm m2 3.50 49.00 75.52 18.68 143.20
500mm m2 3.75 52.50 85.20 20.66 158.36
Facing bricks (basic price £500 per thousand) in
cement mortar (1:3), flemish bond
walls, facework one side
£
£
£
£
Random rubble walling, laid dry, battered one
side, thickness
300mm m2 3.25 45.50 50.38 14.38 110.26
450mm m2 3.75 52.50 75.52 19.20 147.22
500mm m2 4.00 56.00 85.20 21.18 162.38
Random rubble walling, laid dry, battered both
sides, thickness
300mm m2 3.50 49.00 50.38 14.91 114.29
450mm m2 4.00 56.00 75.52 19.73 151.25
500mm m2 4.25 59.50 85.20 21.71 166.41
Random rubble walling, laid in gauged mortar
(1:1:6), thickness
300mm m2 3.20 44.80 54.15 14.84 113.79
450mm m2 3.70 51.80 81.18 19.95 152.93
500mm m2 3.90 54.60 91.20 21.87 167.67
Random rubble walling, laid in gauged mortar
(1:1:6), thickness, battered one side
300mm m2 3.45 48.30 54.15 15.37 117.82
450mm m2 4.00 56.00 81.18 20.58 157.76
500mm m2 4.15 58.10 91.20 22.40 171.70
Random rubble walling, laid in gauged mortar
(1:1:6), thickness, battered both sides
300mm m2 3.95 55.30 54.15 16.42 125.87
450mm m2 4.50 63.00 81.18 21.63 165.81
500mm m2 4.65 65.10 91.20 23.45 179.75
Irregular coursed rubble walling, laid in gauged
mortar (1:1:6), thickness
300mm m2 2.10 29.40 54.15 12.53 96.08
450mm m2 2.90 40.60 81.18 18.27 140.05
500mm m2 3.40 47.60 91.20 20.82 159.62
Coursed rubble walling, laid in gauged mortar
(1:1:6), thickness
300mm m2 2.40 33.60 54.15 13.16 100.91
450mm m2 3.20 44.80 81.18 18.90 144.88
500mm m2 3.70 51.80 91.20 21.45 164.45
Unit Labour Hours
£
Mat’ls
£
O & P
£
Total
£
Fair raking cutting on stone walling, thickness
300mm m 0.80 11.20 2.88 2.11 16.19
450mm m 1.20 16.80 4.66 3.22 24.68
500mm m 1.80 25.20 5.36 4.58 35.14
Form level bed on stone walling, thickness
300mm m 0.20 2.80 0.82 0.54 4.16
450mm m 0.35 4.90 1.32 0.93 7.15
500mm m 0.50 7.00 1.44 1.27 9.71
Sundries
Form holes for pipes up to 50mm diameter through
stone walling, thickness
300mm m 1.20 16.80 0.00 2.52 19.32
450mm m 1.80 25.20 0.00 3.78 28.98
500mm m 2.65 37.10 0.00 5.57 42.67
Form holes for pipes 50-100mm diameter through
stone walling, thickness
300mm m 1.40 19.60 0.00 2.94 22.54
450mm m 2.00 28.00 0.00 4.20 32.20
500mm m 2.85 39.90 0.00 5.99 45.89
Form holes for pipes over 100mm diameter through
stone walling, thickness
300mm m 2.40 33.60 0.00 5.04 38.64
450mm m 3.00 42.00 0.00 6.30 48.30
500mm m 3.85 53.90 0.00 8.09 61.99
Build in ends of steel sections in stone walling, size
not exceeding 250mm deep m 0.70 9.80 0.00 1.47 11.27
250-500mm deep m 0.90 12.60 0.00 1.89 14.49
over 500mm deep m 1.10 15.40 0.00 2.31 17.71
Unit Labour Hours
£
Mat’ls
£
O & P
£
Total
£
50!50!100mm nr 0.60 8.40 0.00 1.26 9.66
50!50!150mm nr 0.65 9.10 0.00 1.37 10.47
75!75!100mm nr 0.70 9.80 0.00 1.47 11.27
75!75!150mm nr 0.75 10.50 0.00 1.58 12.08
Grout up mortices in cement mortar (1:3)
50!50!100mm nr 0.10 1.40 0.01 0.21 1.62
50!50!150mm nr 0.15 2.10 0.18 0.34 2.62
75!75!100mm nr 0.15 2.10 0.30 0.36 2.76
75!75!150mm nr 0.20 2.80 0.35 0.47 3.62
Damp proof courses
Hessian based bitumen damp-proof course bedded in
gauged mortar(1:1:6)
horizontal, width over 225mm m2 0.35 4.90 4.22 1.37 10.49
112mm m 0.05 0.70 0.56 0.19 1.45
vertical, width over 225mm m2 0.40 5.60 4.22 1.47 11.29
112mm m 0.07 0.98 0.56 0.23 1.77
Fibre-based bitumen damp-proof course bedded in
gauged mortar(1:1:6)
horizontal, width over 225mm m2 0.40 5.60 5.56 1.67 12.83
112mm m 0.05 0.70 0.76 0.22 1.68
vertical, width over 225mm m2 0.45 6.30 5.56 1.78 13.64
112mm m 0.07 0.98 0.75 0.26 1.99
Pitch polymer damp proof course in gauged mortar
(1:1:6)
horizontal, width over 225mm m2 0.40 5.60 7.62 1.98 15.20
112mm m 0.05 0.70 0.90 0.24 1.84
vertical, width over 225mm m2 0.45 6.30 7.62 2.09 16.01
112mm m 0.07 0.98 0.90 0.28 2.16
Bitumen damp proof course with lead core in mortar
(1:1:6)
horizontal, width over 225mm m2 0.50 7.00 16.25 3.49 26.74
112mm m 0.06 0.84 2.37 0.48 3.69
Mortices in stone walling, size
£
£
£
Total
£
vertical, width over 225mm m2 0.55 7.70 16.25 3.59 27.54
112mm m 0.08 1.12 2.37 0.52 4.01
Two courses of slates bedded in cement mortar (1:3)
horizontal, width over 225mm m2 0.87 12.18 15.86 4.21 32.25
112mm m 0.33 4.62 2.11 1.01 7.74
vertical, width over 225mm m2 0.95 13.30 15.86 4.37 33.53
112mm m 0.35 4.90 2.11 1.05 8.06
PRECAST CONCRETE
Precast concrete copings twice weatherted and twice
throated, size
75!150!900mm nr 0.30 4.20 6.84 1.66 12.70
75!300!900mm nr 0.40 5.60 6.84 1.87 14.31
Precast concrete pier caps, four times weathered, size
300!300!75mm nr 1.00 14.00 6.58 3.09 23.67
450!450!75mm nr 1.20 16.80 9.79 3.99 30.58
KERBS AND EDGINGS
Excavate trench by hand for kerb foundation
200!75mm m 0.10 1.40 0.00 0.21 1.61
250!100mm m 0.12 1.68 0.00 0.25 1.93
300!100mm m 0.14 1.96 0.00 0.29 2.25
450!150mm m 0.20 2.80 0.00 0.42 3.22
600!200mm m 0.40 5.60 0.00 0.84 6.44
Excavate curved trench by hand for kerb foundation
250!100mm m 0.12 1.68 0.00 0.25 1.93
250!100mm m 0.14 1.96 0.00 0.29 2.25
300!100mm m 0.16 2.24 0.00 0.34 2.58
600!200mm m 0.24 3.36 0.00 0.50 3.86
600!200mm m 0.44 6.16 0.00 0.92 7.08
Site-mixed concrete in foundation for kerb size
200!75mm m 0.03 0.42 1.10 0.23 1.75
250!100mm m 0.04 0.56 1.80 0.35 2.71
£
£
P
£
Total
£
300!100mm m 0.05 0.70 2.16 0.43 3.29
450!150mm m 0.18 2.52 4.70 1.08 8.30
600!200mm m 0.30 4.20 8.68 1.93 14.81
Precast concrete kerbs, channels and edgings, jointed
and pointed in cement mortar
m 0.40 5.60 6.12 1.76 13.48
152!305mm m 0.45 6.30 7.68 2.10 16.08
kerbs, curved
127!254mm m 0.50 7.00 7.38 2.16 16.54 152!305mm m 0.55 7.70 11.58 2.89 22.17
channels, straight
127!254mm m 0.40 5.60 7.23 1.92 14.75
channels, curved
127!254mm m 0.50 7.00 8.31 2.30 17.61
edgings, straight
51!152mm m 0.30 4.20 3.15 1.10 8.45
51!203mm m 0.30 4.20 3.68 1.18 9.06
SUB-BASES
Beds and bases compacting in layers and grading
average thickness, 100mm
granular fill m2 0.10 1.40 3.02 0.66 5.08
sand m2 0.12 1.68 2.80 0.67 5.15
hardcore m2 0.13 1.82 2.68 0.68 5.18
average thickness, 150mm
granular fill m2 0.12 1.68 3.77 0.82 6.27
sand m2 0.14 1.96 3.51 0.82 6.29
hardcore m2 0.16 2.24 3.43 0.85 6.52
average thickness, 200mm
granular fill m2 0.14 1.96 4.90 1.03 7.89
sand m2 0.16 2.24 4.43 1.00 7.67
hardcore m2 0.18 2.52 4.25 1.02 7.79
kerbs, straight
127!254mm
£
£
£
£
Preparatory work
Excavate by hand to form path, depth
100mm m2 0.25 3.50 0.00 0.53 4.03
150mm m2 0.35 4.90 0.00 0.74 5.64
200mm m2 0.45 6.30 0.00 0.95 7.25
250mm m2 0.60 8.40 0.00 1.26 9.66
300mm m2 0.75 10.50 0.00 1.58 12.08
Hardcore bed compacted in layers and blinded
with sand
100mm m2 0.08 1.12 2.80 0.59 4.51
150mm m2 0.10 1.40 4.40 0.87 6.67
200mm m2 0.12 1.68 5.58 1.09 8.35
Concrete beds
Site-mixed concrete in beds
not exceeding 150mm thick m3 2.80 39.20 80.96 18.02 138.18
150 to 450mm thick m3 2.20 30.80 80.96 16.76 128.52
Formwork to sides of concrete bases
not exceeding 250mm wide m 0.65 9.10 1.87 1.65 12.62
250 to 500mm wide m 0.90 12.60 3.07 2.35 18.02
Steel fabric reinforcement laid in concrete beds
ref A142, 2.22kg/m2 m2 0.15 2.10 1.44 0.53 4.07
ref A193, 3.02kg/m2 m2 0.18 2.52 1.73 0.64 4.89
Expansion joint, impregnated fibre-base joint
filler, formed joint
12.5mm thick
not exceeding 150mm \ m 0.18 2.52 2.34 0.73 5.59
150 to 300mm wide m 0.24 3.36 3.75 1.07 8.18
300 to 450mm wide m 0.30 4.20 5.67 1.48 11.35
25mm thick
not exceeding 150mm \ m 0.20 2.80 3.33 0.92 7.05
150 to 300mm wide m 0.26 3.64 4.96 1.29 9.89
£
£
£
£
300 to 450mm wide m 0.32 4.48 7.71 1.83 14.02
Treat surfaces of concrete before setting
tamping m2 0.06 0.84 0.00 0.13 0.97
floating m2 0.10 1.40 0.00 0.21 1.61
trowelling m2 0.15 2.10 0.00 0.32 2.42
Granular pavings
Washed pit gravel, 19mm, bed thickness
50mm m2 0.06 0.84 2.14 0.45 3.43
75mm m2 0.08 1.12 3.21 0.65 4.98
Washed pit gravel, 38mm, bed thickness
50mm m2 0.06 0.84 1.98 0.42 3.24
75mm m2 0.08 1.12 2.87 0.60 4.59
Hoggin bed laid on hardcore, bed thickness
100mm m2 0.14 1.96 2.34 0.65 4.95
150mm m2 0.18 2.52 3.48 0.90 6.90
200mm m2 0.22 3.08 4.31 1.11 8.50
Bark laid on prepared surfaces, bed thickness
100mm
m2 0.05 0.70 2.14 0.43 3.27
Impregnated softwood edging boards with 38!38 !225mm pegs at 1200mm centres
38!100mm m2 0.05 0.70 2.02 0.41 3.13
38!150mm m2 0.07 0.98 2.32 0.50 3.80
Brick/block pavings
Brick paving, £250 per 1000, 215!103!65mm, laid to falls and cross falls bedding in cement
mortar 15mm thick
straight joints both ways bricks laid flat m2 1.00 14.00 23.79 5.67 43.46
bricks laid on edge m2 1.25 17.50 36.25 8.06 61.81
herringbone pattern
bricks laid flat m2 1.25 17.50 23.79 6.19 47.48
bricks laid on edge m2 1.50 21.00 36.25 8.59 65.84
£
£
£
£
Brick paving, £350 per 1000, 215!103!65mm, laid to falls and cross falls bedding in cement
mortar 15mm thick
straight joints both ways
bricks laid flat m2 1.00 14.00 28.63 6.39 49.02
bricks laid on edge m2 1.25 17.50 41.23 8.81 67.54
herringbone pattern
bricks laid flat m2 1.25 17.50 28.63 6.92 53.05
bricks laid on edge m2 1.50 21.00 41.23 9.33 71.56
Brick paving, £500 per 1000, 215!103!65mm, laid to falls and cross falls bedding in cement
mortar 15mm thick
straight joints both ways
bricks laid flat m2 1.00 14.00 34.85 7.33 56.18
bricks laid on edge m2 1.25 17.50 47.55 9.76 74.81
herringbone pattern
bricks laid flat m2 1.25 17.50 34.85 7.85 60.20
bricks laid on edge m2 1.50 21.00 47.55 10.28 78.83
Precast concrete pavings
Precast concrete paving flags, spot bedded in
cement mortar, straight both ways, jointing in
cement mortar brushed in
natural colour
450!450!50mm m2 0.55 7.70 15.02 3.41 26.13
450!600!50mm m2 0.55 7.70 12.45 3.02 23.17
600!600!50mm m2 0.50 7.00 10.22 2.58 19.80
600!900!50mm m2 0.45 6.30 9.49 2.37 18.16
coloured
450!450!50mm m2 0.55 7.70 18.64 3.95 30.29
450!600!50mm m2 0.55 7.70 15.67 3.51 26.88
600!600!50mm m2 0.50 7.00 14.37 3.21 24.58
600!900!50mm m2 0.45 6.30 12.83 2.87 22.00
Unit Labour Hours
£
Mat’ls
£
O & P
£
Total
£
Reconstituted York stone paving flags, spot
bedded in cement mortar, straight both ways,
jointing in cement mortar brushed in, 45mm thick,
size
300x300mm m2 1.00 14.00 26.31 6.05 46.36
300x450mm m2 0.80 11.20 25.44 5.50 42.14
300x600mm m2 0.60 8.40 24.33 4.91 37.64
450x450mm m2 0.55 7.70 23.04 4.61 35.35
600x600mm m2 0.50 7.00 22.78 4.47 34.25
York stone paving flags spot bedded in cement
mortar, straight both ways, jointing in cement
mortar brushed in
50mm thick
cut to size m2 0.80 11.20 88.36 14.93 114.49
random sizes m2 0.90 12.60 73.87 12.97 99.44
63mm thick
cut to size m2 0.85 11.90 97.41 16.40 125.71
random sizes m2 0.95 13.30 82.49 14.37 110.16
75mm thick
cut to size m2 0.90 12.60 109.89 18.37 140.86
random sizes m2 1.00 14.00 92.44 15.97 122.41
Natural granite setts bedded in cement mortar,
size 100!100!150mm m2 2.75 38.50 32.55 10.66 81.71
Concrete setts bedded in cement mortar, size
150!150!80mm m2 2.75 38.50 31.22 10.46 80.18
200!150!80mm m2 2.50 35.00 31.22 9.93 76.15
Concrete paviors, bedded in sand, with sand
brushed in, size
200!100!60mm m2 1.00 14.00 10.55 3.68 28.23
200!100!80mm m2 1.00 14.00 11.65 3.85 29.50
Unit Labour Hours
£
Mat’ls
£
O & P
£
Total
£
Fencing posts
Galvanised steel posts, size 40!40!5mm, driven into ground
900mm high nr 0.05 0.70 1.66 0.35 2.71
1200mm high nr 0.05 0.70 1.98 0.40 3.08
1400mm high nr 0.10 1.40 2.25 0.55 4.20
1800mm high nr 0.15 2.10 2.78 0.73 5.61
2400mm high nr 0.15 2.10 3.14 0.79 6.03
Galvanised steel posts, size 40!40!5mm, with one strut, set in concrete
900mm high nr 0.20 2.80 19.34 3.32 25.46
1200mm high nr 0.20 2.80 22.56 3.80 29.16
1400mm high nr 0.25 3.50 25.61 4.37 33.48
1800mm high nr 0.30 4.20 29.01 4.98 38.19
2400mm high nr 0.30 4.20 33.96 5.72 43.88
Galvanised steel posts, size 40!40!5mm, with two struts, driven into ground
900mm high nr 0.30 4.20 36.53 6.11 46.84
1200mm high nr 0.30 4.20 39.83 6.60 50.63
1400mm high nr 0.35 4.90 42.37 7.09 54.36
1800mm high nr 0.40 5.60 45.19 7.62 58.41
2400mm high nr 0.40 5.60 51.64 8.59 65.83
Precast concrete posts size 100!100mm, set in concrete
900mm high nr 0.25 3.50 19.34 3.43 26.27
1200mm high nr 0.25 3.50 22.56 3.91 29.97
1400mm high nr 0.30 4.20 25.61 4.47 34.28
1800mm high nr 0.35 4.90 29.01 5.09 39.00
2400mm high nr 0.35 4.90 33.96 5.83 44.69
Precast concrete posts size 100!100mm, with one strut, set in concrete
900mm high nr 0.40 5.60 42.54 7.22 55.36
1200mm high nr 0.40 5.60 46.17 7.77 59.54
1400mm high nr 0.45 6.30 54.66 9.14 70.10
FENCING
£
£
£
Total
£
1800mm high nr 0.55 7.70 58.37 9.91 75.98
2400mm high nr 0.55 7.70 76.55 12.64 96.89
Precast concrete posts size 100!100mm, with two struts, set in concrete
900mm high nr 0.50 7.00 58.64 9.85 75.49
1200mm high nr 0.50 7.00 63.21 10.53 80.74
1400mm high nr 0.55 7.70 72.36 12.01 92.07
1800mm high nr 0.60 8.40 83.67 13.81 105.88
2400mm high nr 0.60 8.40 88.97 14.61 111.98
Chainlink fencing
Chainlink fencing, galvanised steel mesh on three
line, wires fixed to posts (not included)
900mm high m 0.15 2.10 1.55 0.55 4.20
1200mm high m 0.15 2.10 1.65 0.56 4.31
1400mm high m 0.20 2.80 2.88 0.85 6.53
1800mm high m 0.25 3.50 3.54 1.06 8.10
2400mm high m 0.25 3.50 4.67 1.23 9.40
Chainlink fencing, plastic coated steel mesh on
three line, wires fixed to posts (not included)
900mm high m 0.15 2.10 1.65 0.56 4.31
1200mm high m 0.15 2.10 1.75 0.58 4.43
1400mm high m 0.20 2.80 2.98 0.87 6.65
1800mm high m 0.25 3.50 3.64 1.07 8.21
2400mm high m 0.25 3.50 4.77 1.24 9.51
Chestnut fencing
Chestnut fencing with pales at 75mm centres,
fixed to 75 mm posts at 3 metre centres driven
into ground
two line wire
900mm high m 0.25 3.50 4.10 1.14 8.74
1100mm high m 0.30 4.20 4.25 1.27 9.72
1250mm high m 0.35 4.90 4.56 1.42 10.88
Unit Labour Hours
£
Mat’ls
£
O & P
£
Total
£
three line wire
900mm high m 0.25 3.50 4.30 1.17 8.97
1100mm high m 0.30 4.20 4.45 1.30 9.95
1250mm high m 0.35 4.90 4.76 1.45 11.11
Strained wire fencing
Strained wire fencing fixed to concrete posts
(not included)
1000mm high, 3 wires m 0.10 1.40 0.44 0.28 2.12
1200mm high, 3 wires m 0.11 1.54 0.44 0.30 2.28
1500mm high, 4 wires m 0.12 1.68 0.66 0.35 2.69
Barbed wire fencing
Barbed wire fencing fixed to concrete posts (not
included)
1000mm high, 3 wires m 0.14 1.96 0.54 0.38 2.88
1200mm high, 3 wires m 0.16 2.24 0.66 0.44 3.34
1500mm high, 4 wires m 0.18 2.52 0.78 0.50 3.80
DRAINAGE
Excavate drain trench by hand, support sides,
level and ram bottom of trench, backfill and
consolidate with excavated material and and
remove surplus to tip for pipes 100mm and
150mm diameter, average depth of trench
0.50m m 1.20 16.80 0.00 2.52 19.32
0.75m m 1.90 26.60 0.00 3.99 30.59
1.00m m 2.50 35.00 0.00 5.25 40.25
1.25m m 4.00 56.00 0.00 8.40 64.40
1.50m m 5.00 70.00 0.00 10.50 80.50
1.75m m 6.00 84.00 0.00 12.60 96.60
2.00m m 7.20 100.80 0.00 15.12 115.92
2.25m m 8.20 114.80 0.00 17.22 132.02
2.50m m 9.50 133.00 0.00 19.95 152.95
2.75m m 10.50 147.00 0.00 22.05 169.05
3.00m m 12.00 168.00 0.00 25.20 193.20
£
£
£
£
Excavate drain trench by hand, support sides,
level and ram bottom of trench, backfill and
consolidate with excavated material and and
remove surplus to tip for pipes 225mm diameter,
average depth of trench
0.50m m 1.30 18.20 0.00 2.73 20.93
0.75m m 2.10 29.40 0.00 4.41 33.81
1.00m m 2.70 37.80 0.00 5.67 43.47
1.25m m 4.30 60.20 0.00 9.03 69.23
1.50m m 5.40 75.60 0.00 11.34 86.94
1.75m m 6.60 92.40 0.00 13.86 106.26
2.00m m 7.10 99.40 0.00 14.91 114.31
2.25m m 9.00 126.00 0.00 18.90 144.90
2.50m m 10.20 142.80 0.00 21.42 164.22
2.75m m 11.30 158.20 0.00 23.73 181.93
3.00m m 12.80 179.20 0.00 26.88 206.08
Extra for breaking up by hand
plain concrete 100mm thi reinforced concrete
100mm
m2 0.90 12.60 0.00 1.89 14.49
thick m2 1.00 14.00 0.00 2.10 16.10
tarmacadam 75mm thick m2 0.55 7.70 0.00 1.16 8.86
hardcore 100mm thick m2 0.40 5.60 0.00 0.84 6.44
soft rock m3 8.00 112.00 0.00 16.80 128.80
hard rock m3 10.00 140.00 0.00 21.00 161.00
Sand bed in trench under pipe 100mm diameter,
thickness
100mm m 0.10 1.40 1.20 0.39 2.99
150mm m 0.12 1.68 1.80 0.52 4.00
Sand bed in trench under pipe 150mm diameter,
thickness
100mm m 0.11 1.54 1.80 0.50 3.84
150mm m 0.13 1.82 2.70 0.68 5.20
£
£
£
£
Sand bed in trench under pipe 225mm diameter,
thickness
100mm m 0.14 1.96 1.90 0.58 4.44
150mm m 0.16 2.24 2.85 0.76 5.85
Granular filling in bed in trench under pipe 100mm
diameter, thickness
100mm m 0.12 1.68 2.10 0.57 4.35
150mm m 0.14 1.96 3.15 0.77 5.88
Granular filling in bed in trench under pipe 150mm
diameter, thickness
100mm m 0.13 1.82 2.18 0.60 4.60
150mm m 0.15 2.10 3.27 0.81 6.18
Granular filling in bed in trench under pipe 225mm
diameter, thickness
100mm m 0.16 2.24 2.33 0.69 5.26
150mm m 0.18 2.52 3.41 0.89 6.82
Concrete filling in bed in trench under pipe 100mm
diameter, thickness
100mm m 0.24 3.36 4.05 1.11 8.52
150mm m 0.28 3.92 6.07 1.50 11.49
Concrete filling in bed in trench under pipe 150mm
diameter, thickness
100mm m 0.26 3.64 4.77 1.26 9.67
150mm m 0.30 4.20 7.15 1.70 13.05
Concrete filling in bed in trench under pipe 225mm
diameter, thickness
100mm m 0.32 4.48 5.40 1.48 11.36
150mm m 0.36 5.04 8.10 1.97 15.11
Concrete in bed and haunching to pipe, 100mm
diameter, bed thickness
100mm m 0.48 6.72 5.40 1.82 13.94
150mm m 0.56 7.84 8.10 2.39 18.33
£
£
£
£
Concrete in bed and haunching to pipe, 150mm
diameter, bed thickness
100mm m 0.52 7.28 6.93 2.13 16.34
150mm m 0.60 8.40 10.40 2.82 21.62
Concrete in bed and haunching to pipe, 225mm
diameter, bed thickness
100mm m 0.60 8.40 9.27 2.65 20.32
150mm m 0.66 9.24 13.90 3.47 26.61
Granular filling in bed and surround to pipe,
100mm diameter, thickness
100mm m 0.36 5.04 2.84 1.18 9.06
150mm m 0.42 5.88 4.26 1.52 11.66
Granular filling in bed and surround to pipe,
150mm diameter, thickness
100mm m 0.40 5.60 3.65 1.39 10.64
150mm m 0.46 6.44 5.48 1.79 13.71
Granular filling in bed and surround to pipe,
225mm diameter, thickness
100mm m 0.44 6.16 3.78 1.49 11.43
150mm m 0.50 7.00 5.67 1.90 14.57
Concrete filling in bed and surround to pipe,
100mm diameter, thickness
100mm m 0.72 10.08 14.22 3.65 27.95
150mm m 0.84 11.76 21.33 4.96 38.05
Concrete filling in bed and surround to pipe,
150mm diameter, thickness
100mm m 0.72 10.08 18.27 4.25 32.60
150mm m 0.84 11.76 27.41 5.88 45.05
Concrete filling in bed and surround to pipe,
225mm diameter, thickness
100mm m 0.72 10.08 18.90 4.35 33.33
150mm m 0.84 11.76 29.90 6.25 47.91
£
£
£
£
Hepworths’ Supersleve vitrified clay drain pipes,
spigot and socket joints with sealing rings,
100mm diameter
laid in trenches m 0.36 5.04 6.39 1.71 13.14
in lengths not exceeding 3m m 0.54 7.56 6.39 2.09 16.04
bend nr 0.30 4.20 8.70 1.94 14.84
rest bend nr 0.30 4.20 13.53 2.66 20.39
single junction nr 0.30 4.20 12.76 2.54 19.50
Hepworths’ Supersleve vitrified clay drain pipes,
spigot and socket joints with sealing rings,
150mm diameter
laid in trenches m 0.60 8.40 12.19 3.09 23.68
in lengths not exceeding 3m m 0.40 5.60 12.19 2.67 20.46
bend nr 0.30 4.20 12.16 2.45 18.81
rest bend nr 0.30 4.20 15.63 2.97 22.80
single junction nr 0.30 4.20 16.29 3.07 23.56
Vitrified clay inlet gulley complete with grid and
surrounded with concrete
nr 1.50 21.00 40.58 9.24 70.82
Vitrified clay back inlet gulley complete with
grid and surrounded with concrete
nr 1.50 21.00 57.99 11.85 90.84
Vitrified clay paved area gulley complete with
grid and surrounded with concrete
nr 1.50 21.00 47.17 10.23 78.40
Manholes
Excavate by hand for manhole not exceeding
1.0m deep m3 4.00 56.00 0.00 8.40 64.40
1.5m deep m3 4.50 63.00 0.00 9.45 72.45
2.0m deep m3 5.60 78.40 0.00 11.76 90.16
Load surplus excavated material into barrows
wheel 50m and deposit into skip
m3 2.20 30.80 0.00 4.62 35.42
Earthwork support not exceeding 2m between
opposing faces, depth not exceeding
1.0m deep m2 0.35 4.90 1.92 1.02 7.84
2.0m deep m2 0.40 5.60 2.22 1.17 8.99
4.0m deep m2 0.45 6.30 2.51 1.32 10.13
£
£
£
£
Site-mixed concrete in base of manhole,
thickness
100-150mm m3 2.00 28.00 94.88 18.43 141.31
150-300mm m3 1.80 25.20 94.88 18.01 138.09
Site-mixed concrete in benching to manhole,
average thickness 225mm
m3 6.00 84.00 94.88 26.83 205.71
Engineering bricks Class ‘B’ in cement mortar
in walls of manhole
m2 4.80 67.20 57.86 18.76 143.82
Extra for fair face and flush pointing m2 0.25 3.50 0.00 0.53 4.03
Build in ends of pipes to one brick wall and
make good, pipe diameter
100mm nr 0.15 2.10 0.00 0.32 2.42
150mm nr 0.19 2.65 0.00 0.40 3.04
Galvanised step iron built into brickwork nr 0.20 2.80 5.42 1.23 9.45
Cast iron manhole cover, frame, bedded in
cement mortar
Grade A, light duty, size 600!450mm nr 1.90 26.60 71.64 14.74 112.98
Grade B, medium duty, size 600!450mm nr 2.00 28.00 114.69 21.40 164.09
Best quality vitrified clay channels, bedded in
cement mortar
half-section straight main channel
100mm diameter! 300mm nr 0.75 10.50 2.94 2.02 15.46
100mm diameter! 600mm nr 0.85 11.90 5.33 2.58 19.81
100mm diameter! 1000mm nr 0.95 13.30 6.84 3.02 23.16
150mm diameter! 300mm nr 0.75 10.50 4.55 2.26 17.31
150mm diameter! 600mm nr 0.85 11.90 6.79 2.80 21.49
150mm diameter! 1000mm nr 0.95 13.30 9.44 3.41 26.15
Half-section 90 degrees channel bend
100mm nr 0.30 4.20 5.67 1.48 11.35
150mm nr 0.40 5.60 8.61 2.13 16.34
£
£
£
£
100mm nr 1.20 16.80 12.04 4.33 33.17
150mm nr 1.30 18.20 21.49 5.95 45.64
Land drainage
Excavate trench 225mm wide by hand, remove
excavated material, average depth
500mm m 0.35 4.90 0.00 0.74 5.64
750mm m 0.50 7.00 0.00 1.05 8.05
1000mm m 0.75 10.50 0.00 1.58 12.08
Excavate trench 300mm wide by hand, remove
excavated material, average depth
500mm m 0.45 6.30 0.00 0.95 7.25
750mm m 0.70 9.80 0.00 1.47 11.27
1000mm m 0.90 12.60 0.00 1.89 14.49
Agricultural clay field drain pipe, 300mm long,
laid butt jointed in trench, diameter
75mm m 0.11 1.54 2.68 0.63 4.85
100mm m 0.12 1.68 4.57 0.94 7.19
150mm m 0.14 1.96 9.04 1.65 12.65
Single junction
75mm nr 0.06 0.84 9.98 1.62 12.44
100mm nr 0.07 0.98 12.61 2.04 15.63
150mm nr 0.08 1.12 15.56 2.50 19.18
Flexible plastic perforated field drain pipe,
diameter
60mm m 0.02 0.28 0.28 0.08 0.64
80mm m 0.02 0.28 0.42 0.11 0.81
100mm m 0.03 0.42 0.68 0.17 1.27
Single junction
60!60mm nr 0.06 0.84 1.47 0.35 2.66
60!80mm nr 0.06 0.84 1.59 0.36 2.79
Three-quarter section 90° channel bend
£
£
£
£
60!100mm nr 0.06 0.84 1.63 0.37 2.84
80!80mm nr 0.06 0.84 1.58 0.36 2.78
80!100mm nr 0.06 0.84 1.70 0.38 2.92
Backfilling field trench with gravel, blinded with
sand and replace with turf laid aside
trench width 225mm
depth 500mm m 0.03 0.42 2.02 0.37 2.81
depth 750mm m 0.03 0.42 3.00 0.51 3.93
depth 1000mm m 0.03 0.42 3.98 0.66 5.06
trench width 300mm
depth 500mm m 0.03 0.42 2.70 0.47 3.59
depth 750mm m 0.03 0.42 3.95 0.66 5.03
depth 1000mm m 0.03 0.42 5.21 0.84 6.47
£
£
£
£