ABSTRACT

Before ordering materials the Contractor shall if so required submit to the Engineer quotations for the same for his approval.·

CIVIL ENGINEERING CONTRACTORS ASSOCIATION Construction House 56-64 Leonard Street London EC2A4JX Tel: 02076085060 Fex: 0207 608 5061

These schedules identify a number of Items that are excluded from the rates and percentages quoted, but should be recovered by the Contractor when valuing his Daywork account. Under normal circumstances It is impractical to accurately value these Items for each Daywork event, although certain Items can be allowed for by means of a percentage addition. Suggested methods of calculating such additions are included in this section.