This part enables the user to include within the estimate for Ancillary Building Worlcs which may be associated with a eMI/ Engineering project but, because of the diversity which can occur on the Specification for these Worlcs, cannot be priced as accurately as Unit Cost /tems. Additionally, as such worIcs form only a minor percentage of an overa/I eMI Engineering Budget, then the need for such accuracy in the budget is not as critical. Therefore, the rates given within this Part are based upon an average range for each item to allow the user discretionary use based upon more detailed knowledge of the specific project. Should however more detailed pricing information be required then reference should be made to the latest edition of:

SPON'S ARCHITECTS' AND BUILDERS' PRICE BOOK

SPON'S LANDSCAPE AND EXTERNAL WORKS PRICE BOOK

SPON'S MECHANICAL AND ELECTRICAL SERVICES PRICE BOOK

Contents: 1. Introduction 2. Positioning the Subject 3. The Design Process 4. Considerations at System Level 5. Use of Theory 6. Data Collection 7. Stability of Random Placed Roak Mounds 8. Dynamic Stability 9. Stability of Monolithic Breakwaters 10. Wave-structure Interaction 11. Design Practice of Breakwater Crosssections 12. Design Practice for Closure Dams 13. Construction Methods for Granular Material 14. Construction Methods for Monolithic Structures 15. Failure Modes and Optimisation 1 6. Flow Development in Closure Gaps 1 7. Reviews.