ABSTRACT

ABSTRACT. A wide range of waterproofing systems considered suitable by manufacturers for concrete bridge decks have been laid under experimentally controlled conditions on a concrete slab, then overlaid with hot asphaltic surfacings. These surfacings were removed and the effects of hot asphalt, bond, durability and waterproofing integrity of the membranes monitored over a three year period.