GENERAL TEXT Principal changes from CESMM 1 There were only one or two minor changes to the divisions of this class apart from a minor re-shuffling of the items.

Formwork to in situ linings must state the finish (T. 2-3 5 *). In accordance with Paragraph 3.2 the item description for face packers was simplified (T. 8 3 2). The item for standby driving or sinking operations was deleted (T. 8 5 0 in CESMM 1) and the Contractor had to seek payment for standing idle due to emergency supporting or stabilization operations, through the Contract and not through measurement.