ABSTRACT

Contains added chapters emphasizing the importance of choosing the correct project and defining project goals. Stresses the need for adequate front end loading (FEL) and outlines the responsibility of the venture manager in project selection. Provides updated case studies and examples on technical evaluation criteria, construction progress monitori

chapter 1|4 pages

CHAPTER INTRODUCTION

Scenario

chapter 2|1 pages

CHAPTER THE PROJECT

chapter |2 pages

VENTURE

MANAGER MANAGER

chapter |1 pages

Initial Involvement/Plan of Action

chapter |1 pages

of of

Contractor Selection

chapter |1 pages

Procurement

chapter |1 pages

Contract Administration

chapter 3|5 pages

2 The Integrated Team

Responsibilities

chapter 3|2 pages

4 Additional Considerations

Alignment Project Goals

chapter |1 pages

Project Goals

chapter |2 pages

Example

chapter |1 pages

• Supercritical extraction.

chapter |1 pages

• Net Present Value (NPV). of of of

chapter |2 pages

Risk Analysis

chapter |1 pages

• Capital costs: of

chapter 4|1 pages

6 Choosing the Right Project

first alternative:

chapter |1 pages

If of if

chapter 4|1 pages

7 Executing a Project Right

chapter |3 pages

of if

chapter 5|2 pages

INITIAL INVOLVEMENT AND PLAN OF

ACTION

chapter 5|1 pages

2 Initial Plan

Action General

chapter |3 pages

Approximate Construction Hours

chapter |1 pages

of of of of

chapter |7 pages

Plan Contents of

Thumb

chapter 6|15 pages

PROCESS DESIGN - PHASE O/PHASE 1

chapter 7|2 pages

CHAPTER REGULATORY COMPLIANCE

chapter |2 pages

Zoning

chapter |1 pages

• Construction workers.

chapter |3 pages

of of If

chapter |2 pages

Water

chapter |3 pages

STUDY 4 Other Codes and Standards

chapter |3 pages

CHAPTER RISK ANALYSIS

chapter 8|1 pages

4 Assessment and Analysis

chapter 8|2 pages

5 Risk Management

chapter |1 pages

Unavoidable Risks

chapter |2 pages

Validity Check

TICM$

chapter 0|6 pages

)0-

chapter |3 pages

Presentation

chapter 9|1 pages

5 Compressing the Schedule

chapter |2 pages

Drawback of

chapter 10|11 pages

CHAPTER ESTIMATING

chapter |5 pages

Method

Estimate General

chapter |2 pages

of of

chapter |2 pages

of If

chapter 11|2 pages

CHAPTER CONTRACTING

chapter |3 pages

The of

Selection

chapter |2 pages

of of

chapter |2 pages

Construction

chapter |2 pages

of of of

chapter |2 pages

Bidders Selection

chapter |4 pages

of of

chapter |2 pages

ofproposed if

chapter |8 pages

of of

chapter |3 pages

CHAPTER DETAILED ENGINEERING

chapter |7 pages

of of

chapter |3 pages

Contracted Engineering of

chapter |2 pages

CHAPTER PROCUREMENT

chapter 13|3 pages

2 Guideline for Purchasing

chapter |2 pages

of of if

chapter |2 pages

CHAPTER CONSTRUCTION MANAGEMENT

chapter 14|5 pages

2 Construction Options

chapter |3 pages

Initial C.M. Activities

chapter |2 pages

• Look Ahead Reports. of

Construction Management

chapter |2 pages

CHAPTER PROJECT CONTROL

chapter |1 pages

of of

chapter |3 pages

Cost Control

chapter |1 pages

Site Selection

chapter |3 pages

Phase O/Phase 1

chapter |2 pages

Table 15.1

chapter |3 pages

Detailed Engineering

chapter |1 pages

of of

chapter 15|1 pages

7 Anatomy of a Project Control System

chapter |15 pages

of cost tracking

chapter |2 pages

of if

chapter |1 pages

Problem of of Correction

Problem Correction

chapter |2 pages

Correction

Problem Correction

chapter |1 pages

of ofjobs.

chapter |1 pages

CHAPTER CONTRACTS ADMINISTRATION

chapter 16|3 pages

2 Thoughts on Contract Administration

chapter 16|4 pages

4 Typical Audit Exceptions

chapter |2 pages

If • Design Criteria -

chapter |4 pages

CHAPTER

chapter |2 pages

of of

chapter |1 pages

construction errors.

chapter 18|3 pages

5 Startup Goals

Safety Speed

chapter |1 pages

CHAPTER SEMI-DETAILED ESTIMATING SYSTEM

chapter 19|1 pages

1 Procedure

General

chapter |3 pages

If Concrete -

Engineering

chapter |2 pages

Vessels

chapter xl|4 pages

10 x

chapter |1 pages

Shell and Tube Heat Exchangers

chapter |3 pages

Tube

chapter |1 pages

Equipment Erection

Concrete

chapter |4 pages

Table 19.1

chapter |4 pages

Table 19.4

chapter |8 pages

Roof and siding: of Pipe racks: 19.7.

chapter |3 pages

Per 100 feet of piping

chapter |4 pages

A. Heat Tracing Electric

chapter |2 pages

Table 19.21

chapter |2 pages

Table 19.23

chapter 6500|2 pages

. . 6000

chapter |3 pages

Table 19.24

chapter |1 pages

Take-Offs

Total Plant Total Plant

chapter |1 pages

---~

chapter |1 pages

Pricing

chapter |9 pages

ofthumb DeS

chapter |8 pages

ofTable

chapter |1 pages

Hours for In-House Engineering

chapter 19|1 pages

9 Field Costs

Labor Costs

chapter |7 pages

Table 19.32

chapter |3 pages

of if

chapter |2 pages

of of

chapter |1 pages

Table 19.35 Actual Projects

chapter |3 pages

of of

chapter |2 pages

ApPENDIX

RECOMMENDED READING

chapter |1 pages

GLOSSARY

chapter |2 pages

EPC of

chapter |9 pages

ApPENDIX TYPICAL COORDINATION PROCEDURE

chapter |5 pages

ApPENDIX

ESTIMATE CHECKLIST Purpose

chapter |8 pages

CASE STUDY

EXECUTION PLANIMPS

chapter |2 pages

Work

chapter |2 pages

= c·

Schedule ---.,

chapter |1 pages

= ..

chapter |4 pages

, , , ,

Study·

chapter |1 pages

Construction Staffln '9 0

Proaress Curve

chapter |1 pages

ApPENDIX

TECHNICAL EVALUATION CRITERIA EXAMPLE

chapter |5 pages

Table F.!

chapter |1 pages

ApPENDIX

IN-HOUSE CONSTRUCTION PROGRESS MONITORING SYSTEM EXAMPLE Scope

chapter |2 pages

of of

Basis Basis

chapter |1 pages

Activity Frac. Frac. Gauging

chapter |2 pages

ApPENDIX CASE STUDY

CONSTRUCTION PROGRESS MONITORING General

chapter |1 pages

Table B.2

chapter |1 pages

work

chapter |2 pages

Table H.4

chapter |1 pages

Table H.6

chapter |8 pages

work

chapter |2 pages

ApPENDIX HEAT TRACING MODELS

Electric Tracing

chapter |2 pages

ApPENDIX

FIELD INDlRECTS CHECKLIST Total 100-130%

chapter |1 pages

* 2-4

chapter |3 pages

ApPENDIX SEMI-DETAILED ESTIMATE EXAMPLE -CASE STUDY

Preliminary Estimate

chapter 6|2 pages

;-

chapter |2 pages

!. s·

chapter L|1 pages

2 Annotated Equipment List

chapter L|8 pages

3 Equipment Account

chapter L|4 pages

5 Instrumentation Account

chapter L|1 pages

7 Site Work Account

chapter L|1 pages

8 Fire Protection Account

chapter L|2 pages

9 Concrete Account

chapter L|6 pages

I0 Structural Steel Account

chapter L|1 pages

16 Contingency

chapter |1 pages

ApPENDIX

ACCURACY CONCEPTUAL CHECK ESTIMATES

chapter |5 pages

ease

chapter |2 pages

ApPENDIX N.l Introduction

OFFSHORE ESTIMATING

chapter |4 pages

N.2 Cost Conversion Questionnaire and of

Summary Answers Exchange

chapter |1 pages

Labor u.s.

Subcontracts

chapter |1 pages

Startup