Preparation of a Phase 0 package requires approximately 40% of Phase 1. This must be taken into consideration when the Phase 1 work is based on an existing Phase O.

The contractor doing the engineering work requires a certain degree of monitoring and supervision and, in some cases, even direction from the Owner. This is especially true when the contractor performs its work under a cost reimbursable contract.