ABSTRACT

The labor costs should be estimated in a manner consistent with the planned execution approach.

• If construction is to be executed on a direct-hire basis, the labor costs should include only the basic labor rate. All other labor-related costs (PAC's, fringe benefits, supervision, rental equipment, etc.) should be included with the field indirects.