ABSTRACT

The Case Study initiated with the initial Plan of Action in Section 5.3 has evolved into a Phase 0 Design Package and now a Preliminary Cost Estimate is required to confirm the viability of the project and, if required, request funds for the preparation of a Detailed Process Design and Engineering Specification (Phase 1) and an appropriation quality estimate.