ABSTRACT

Estimated at $500k and 4,500 hr. Installation of a few pumps and tanks and approximately 4,000 feet of mostly straight alloy pipe. Minimal overrun potential.

The relative value assigned to each of the above components could be based on the dollar cost, estimated hours, or on a pondered basis that considers both as well as the potential cost and schedule exposure.