ABSTRACT
Construction labor costs can be derived from the TIC with the aid of the Lang Factors discussed in Chapter 10.
Construction Labor Cost =TIC x 0.38
The approximate hours can then be calculated dividing the cost by $45/hr, which is a typical rate for union labor in industrialized states, including subcontractors, indirects, overhead, and profit.