ABSTRACT

This permit usually contains the volumetric flow allowed and the allowable concentration or poundage of listed materials that may be discharged. If your project increases anything in the permit, the plant must obtain a permit modification. Recently, agencies have begun to require Toxicity Studies to asses any impact on aquatic life. Such studies are lengthy and costly.