ABSTRACT

Draft: Materials and Structures, Vol. 9, No. 53, September –October 1976. Final: April 1984. French version: April 1984.

1. The purpose of testing bridges in situ is to verify their correct static and dynamic behaviour and quality of work, either subjecting the structure in question to a test load of proper magnitude, or investigating it over a long time period.