ABSTRACT

Figure 2.2 shows a suggested curing chamber lay­out suitable for grc 7-day curing. The area can be di­vided by rubber curtains to produce the required number of booths, and the front should be sealed with insulated durable doors. The plumbing requirements are given in Figure 2.3. When using flexible hoses within the curing chamber to direct the spray of water, it is possible to adapt the conditions to suit all types and sizes of production units.