ABSTRACT

Screenings pit capacity calculations are actually detention time calculations.* Remember that detention time may be considered the time required to flow through a tank or the time required to fill a tank or basin at a given flow rate. In screenings pit capacity problems, the time required to fill a screenings pit is being calculated.