ABSTRACT

Normal +10% +20% +30% Groundwork Gang 1 Ganger 1 x 10.08 = 10.88 6 Labourers 6 x 10.08 = 60.48

71.36 ÷ 6.5 = 10.98 12.11 13.23 14.35 Concreting gang 1 Foreman 1 x 14.28 = 14.28 4 Skilled Labourers 4 x 10.08 = 43.52

57.80 ÷ 4.5 = 12.84 14.16 15.47 16.78 Steelfixing Gang 1 Foreman 1 x 14.28 = 14.28 4 Steelfixers 4 x 13.48= 53.92

68.20 ÷ 4.5 = 15.16 16.71 18.25 19.79 Formwork Gang 1 Foreman 1 x 14.28 = 14.28 10 Carpenters 10 x 13.48 = 134.80 1 Labourer 1 x 10.08 = 10.08

159.16 ÷ 10.5 = 15.16 16.71 18.25 29.79 Bricklaying/Light Blockwork Gang 1 Foreman 1 x 14.28 = 14.28 6 Bricklayers 6 x 13.48 = 80.88 4 Labourers 4 x 10.08 = 40.32

135.48 ÷ 6.5 = 20.84 22.98 25.10 27.22 Dense Blockwork Gang 1 Foreman 1 x 14.28 = 14.28 6 Bricklayers 6 x 13.48 = 80.88 6 Labourers 6 x 10.08 = 60.48

155.64 ÷ 6.5 = 23.94 26.40 28.84 31.28 Carpentry/Joinery Gang 1 Foreman 1 x 14.28 = 14.28 5 Carpenters 5 x 13.48 = 67.40 1 Labourer 1 x 10.08 = 10.08

97.76 ÷ 5.5 = 16.68 18.39 20.09 21.79 Craft Operative (Painter, Slater, etc.)

1 x 13.48 = 13.48 ÷ 1 = 13.48 14.86 16.23 17.60

1 and 1 Gang 1 Craft Operative 1 x 13.48 = 13.48 1 Skilled Labourer 1 x 10.88 = 10.88

24.36 ÷ 1 = 24.36 26.86 29.34 31.82 2 and 1 Gang 2 Craft Operatives 2 x 13.48 = 26.96 1 Skilled Labourer 1 x 10.88 = 10.88

37.84 ÷ 2 = 18.92 20.86 22.79 24.71 Small Labouring Gang (making good) 1 Foreman 1 x 14.28 = 14.28 4 Skilled Labourers 4 x 10.88 = 43.52

57.80 ÷ 4.5 = 12.84 14.16 15.47 16.78 Drain Laying Gang/Clayware 2 Skilled Labourers 2 x 10.88 = 21.76 ÷ 2 = 10.88 12.00 13.11 14.22

Subcontractor's operatives

Similar labour rates are shown in respect of sublet trades where applicable.