Figure 1 is a plan of the model upstream of the power station. The depth varies from 4 meters in the upstream part of the river to 8 meters close to the dam. A meter long channel is excavated towards the intake as shown in the figure. This channel is 5 meters deep at its upstream part and the depth increases to 9 meters close to the intake. The influence of the flow from the area with shallow water, which is marked in figure 1, can seen in both the model test and the
DOI link for Figure 1 is a plan of the model upstream of the power station. The depth varies from 4 meters in the upstream part of the river to 8 meters close to the dam. A meter long channel is excavated towards the intake as shown in the figure. This channel is 5 meters deep at its upstream part and the depth increases to 9 meters close to the intake. The influence of the flow from the area with shallow water, which is marked in figure 1, can seen in both the model test and the
Figure 1 is a plan of the model upstream of the power station. The depth varies from 4 meters in the upstream part of the river to 8 meters close to the dam. A meter long channel is excavated towards the intake as shown in the figure. This channel is 5 meters deep at its upstream part and the depth increases to 9 meters close to the intake. The influence of the flow from the area with shallow water, which is marked in figure 1, can seen in both the model test and the
ABSTRACT