ABSTRACT

Demolition of building or structure building; brick construction with timber floor and roof – – – – m3 7.22 building; brick construction with concrete floor and roof – – – – m3 12.02 building; masonry construction with timber floor and roof – – – – m3 9.42 building; reinforced concrete frame construction with brick infill – – – – m3 12.54 building; steel frame construction with brick infill – – – – m3 6.82 building; steel frame construction with cladding – – – – m3 6.50 building; timber – – – – m3 5.84 reinforced concrete bridge deck or superstructure – – – – m3 15.07 reinforced concrete bridge abutment or bank seat – – – – m3 39.60 reinforced concrete retaining wall – – – – m3 150.92 brick or masonry retaining wall – – – – m3 83.05 brick or masonry boundary wall – – – – m3 67.98 dry stone boundary wall – – – – m3 81.84

TAKE UP OR TAKE DOWN AND SET ASIDE FOR RE-USE OR REMOVE TO STORE OR TIP OFF SITE

Take Up Or Down And Set Aside For Re-Use Or Remove To Store Or Tip Off Site Take up or down and set aside for re-use

precast concrete kerbs and channels 0.02 1.19 1.95 – m 3.14 precast concrete edgings 0.01 0.89 1.56 – m 2.45 precast concrete drainage and kerb blocks 0.02 1.49 2.37 – m 3.86 precast concrete drainage channel systems 0.02 1.49 2.37 – m 3.86 tensioned single sided corrugated beam safety fence 0.14 9.77 7.56 – m 17.33 timber post and 4 rail fence 0.08 5.58 4.28 – m 9.86 bench seat 0.13 9.07 7.03 – nr 16.10 cattle trough 0.16 10.89 8.38 – nr 19.27 permanent bollard 0.13 9.07 7.03 – nr 16.10 pedestrian crossing lights; pair 0.26 18.15 13.99 – nr 32.14 lighting column including bracket arm and lantern; 5m high 0.58 40.49 31.13 – nr 71.62 lighting column including bracket arm and lantern; 10m high 0.61 42.58 32.64 – nr 75.22 traffic sign 0.26 18.15 13.99 – nr 32.14 timber gate 0.13 9.07 7.03 – nr 16.10 stile 0.13 9.07 7.03 – nr 16.10 road stud 0.03 1.81 1.36 – nr 3.17 chamber cover and frame 0.03 1.81 1.36 – nr 3.17 gully grating and frame 0.03 1.81 1.36 – nr 3.17 feeder pillars 0.03 1.81 1.36 – nr 3.17

hours £ £ £ rate £

TAKE UP OR TAKE DOWN AND SET ASIDE FOR RE-USE OR REMOVE TO STORE OR TIP OFF SITE – cont

Take up or down and remove to store off site precast concrete kerbs and channels 0.02 1.19 3.50 – m 4.69 precast concrete edgings 0.01 0.89 2.72 – m 3.61 precast concrete drainage and kerb blocks 0.02 1.49 4.30 – m 5.79 precast concrete drainage channel systems 0.02 1.49 4.30 – m 5.79 tensioned single sided corrugated beam safety fence 0.14 9.77 8.84 – m 18.61 timber post and 4 rail fence 0.08 5.58 5.01 – m 10.59 bench seat 0.13 9.07 11.76 – nr 20.83 cattle trough 0.16 10.89 14.06 – nr 24.95 permanent bollard 0.13 9.07 11.76 – nr 20.83 pedestrian crossing lights; pair 0.26 18.15 16.36 – nr 34.51 lighting column including bracket arm and lantern; 5m high 0.58 40.49 36.41 – nr 76.90 lighting column including bracket arm and lantern; 10m high 0.61 42.58 38.19 – nr 80.77 traffic sign 0.26 18.15 16.36 – nr 34.51 timber gate 0.13 9.07 11.76 – nr 20.83 stile 0.13 9.07 11.76 – nr 20.83 road stud 0.03 1.81 2.30 – nr 4.11 chamber cover and frame 0.03 1.81 2.30 – nr 4.11 gully grating and frame 0.03 1.81 2.30 – nr 4.11 feeder pillars 0.03 1.81 2.30 – nr 4.11

Take up or down and remove to tip off site tensioned single sided corrugated beam safety fence 0.17 11.87 9.23 – m 21.10 timber post and 4 rail fence 0.09 6.28 4.87 – m 11.15 low pressure gas mains up to 150mm diameter 0.04 2.79 2.18 – m 4.97 low pressure water mains up to 75mm diameter 0.03 2.09 1.67 – m 3.76 power cable laid singly 0.03 2.09 1.67 – m 3.76 lighting column including bracket arm and lantern; 5m high 0.82 57.24 44.73 – nr 101.97 lighting column including bracket arm and lantern; 10m high 0.85 59.33 46.26 – nr 105.59 traffic sign including posts 0.38 26.52 20.48 – nr 47.00

Removal of existing reflectorised thermoplastic road markings

100mm wide line – – – – m 1.21 150mm wide line – – – – m 1.82 200mm wide line – – – – m 2.42 arrow or letter ne 6.0m long – – – – nr 18.72 arrow or letter 6.0 - 16.0m long – – – – nr 78.49