ABSTRACT

However, the use of a number of generating units increases the initial cost per kW of the plant capacity as well as oor area required. is leads to the increase in production cost of energy.

3.4 CONNECTED LOAD Connected load is the sum of continuous ratings of all loads connected to the system.