ABSTRACT

An important issue for companies using biomechanical evaluation to improve their workplaces is when in the design process the evaluation is applied. Although it is common to conduct assessments on existing production systems or products, this is not the most cost-effective point at which to conduct improvement processes. Retrofitting existing systems is much more expensive than making modifications during the design phase before the system is built (Miles and Swift, 1998).