ABSTRACT

ABSTRACT: The aim of the present paper is to provide a description of the ongoing work regarding the feasibility studies that are currently being performed. Different alternatives are being discussed. Environmental loads, constructability of the structure and the risk of ship impact can be listed among the decisive aspects of the design.