ABSTRACT

The above examples provide the basic methodology for controls work allocation among the subcontractors. These examples constitute a sample of the building components requiring controls coordination. Some other examples include the following:

(g) The controls circuit between the fan coil at a walk-in refrigerator or freezer and the respective roof-mounted condensing unit.