ABSTRACT

Integration of the geometrical representation of the building together with scheduling data has been a topic for many research and development efforts. Different approaches for this integration are as follows (Fig. 4): • automated generation of 4D models; • linking geometrical 3D model with schedule; • “Lego approach”, i.e. developing a 4D model from building parts library.