ABSTRACT

NOTES The following are guide prices for various structural members commonly found in a Civil Engineering contract. The list is by no means exhaustive and costs are very much dependent on the particular design and will vary greatly according to specific requirements. For more detailed prices, reference should be made to Specialist Contractors. FABRICATION OF MEMBERS; STEELWORK Columns universal beams; straight on plan - - - - tonne 1256.78 circular hollow sections; straight on plan - - - - tonne 2698.47 rectangular hollow sections; straight on plan - - - - tonne 2496.22 Beams universal beams; straight on plan - - - - tonne 1219.22 universal beams; curved on plan - - - - tonne 2007.95 channels; straight on plan - - - - tonne 1407.00 channels; curved on plan - - - - tonne 2406.88 castellated beams; straight on plan - - - - tonne 1782.60 Portal frames straight on plan - - - - tonne 1539.12 Trestles, towers and built-up columns straight on plan - - - - tonne 1865.21 Trusses and built-up girders straight on plan - - - - tonne 1865.21 curved on plan - - - - tonne 2496.22 Bracings angles; straight on plan - - - - tonne 1294.33 circular hollow sections; straight on plan - - - - tonne 2571.34 Purlins and cladding rails straight on plan - - - - tonne 1482.12 Cold rolled purlins and rails straight on plan - - - - tonne 2496.22 Anchorages and holding down bolt assemblies base plate and bolt assemblies complete - - - - tonne 2875.12 ERECTION OF FABRICATED MEMBERS ON SITE Trial erection - - - - tonne 317.78 Permanent erection - - - - tonne 242.11 Site bolts black - - - - tonne 3146.94 HSFG general grade - - - - tonne 3146.94 HSFG higher - - - - tonne 3596.50 HSFG load indicating or limit types, general grade - - - - tonne 4158.47 HSFG load indicating or limit types, higher grade - - - - tonne 4645.49

Item

Gang hours

Labour £

Plant £

Material £ Unit

Total rate £

OFF SITE SURFACE TREATMENT Note: The following preparation and painting systems have been calculated on the basis of 20 m2 per tonne Blast cleaning - - - - m2 4.07 Galvanising - - - - m2 14.78 Painting one coat zinc chromate primer - - - - m2 4.03 one coat two pack epoxy zinc phosphate primer (75 microns dry film thickness) - - - - m2 7.14 two coats epoxy micaceous iron oxide (100 microns dry film thickness per coat) - - - - m2 18.23