ABSTRACT

Since the crossing of the metasediments is technically difficult and high risk, a second, more extensive geophysical survey was undertaken with the aim to reconstruct the 3D orientation and thickness of the metasedimentary horizon and the DSGSD basal surface. This would help minimize the tunnel length crossing the very poor quality metasedimentary rocks and maximize the tunnel separation from the overlying deep seated landslide.