ABSTRACT

Efforts before and during mixing are directed towards achieving uniform distribution of the steel fiber in the mix; however, long transportation time, long mixing and speed of mixing in transit truck, and workability of the mix might alter the SF distribution. This might lead to uneven fiber percentage within the same truckload. Therefore, evaluation of the fiber distribution in the mix needs to be conducted for every truckload.