ABSTRACT
Management Plan (IMO 2011), where there were specified two measures:
• Weather Routeing-The master is responsible for selecting the optimum route based on the weather prediction. This recommendation was considered for the presented study; and
• Speed Optimization-The master is responsible for maintaining the ship speed.