ABSTRACT

This article aims to present the methodology used by Rumo Logística for inspection and maintenance plans of bridges and tunnels in a freight traffic railroad with 2,400km of extension on its North Operations Corridor and also to present three practical cases of structural interventions without affecting the railroad operation that connects the Brazilian most productive agricultural region to the largest port in Latin America.