ABSTRACT
Clarification notes on labour costs in this section
In situ concrete team Generally a three man team is used in this section; The column ‘Labour hours’ reports team hours. The column ‘Labour £’ reports the total cost of the team for the unit of work shown
3man team – 1.00 59.25 – – hr 59.25 2man team – 1.00 39.50 – – hr 39.50
CONCRETE MIX INFORMATION
General The concrete mixes used here are referred to as Designed, Standard and Designated mixes.