ABSTRACT

The approach adopted for the assessment of flow properties of flowable repair concrete for use in the reinstatement of a corrosion damaged viaduct is discussed. The use of initial compliance tests to ensure that the concrete meets the specifications, production control tests on each batch of concrete and routine site tests is outlined.