ABSTRACT

General fittings and equipment internal planting m2 26.21 to 33.53 signs, notice-boards, shelving, fixed seating, curtains and blinds m2 14.20 to 16.25

SANITARY AND DISPOSAL INSTALLATIONS

Note: Material prices vary considerably, the following composite rates are based on average prices for mid priced fittings. Lavatory basins; vitreous china; chromium plated taps, waste, chain and plug, cantilever brackets nr 216.67 to 284.02

Low level WC's; vitreous china pan and cistern; black plastic seat; low pressure ball valve; plastic flush pipe; fixing brackets on ground floor nr 204.96 to 250.34 one of a range; on upper floors nr 398.21 to 468.48

Bowl type wall urinal; white glazed vitreous china flushing cistern; chromium plated flush pipes and spreaders; fixing brackets white nr 181.54 to 250.34

Shower tray; glazed fireclay; chromium plated waste, chain and plug, riser pipe, rose and mixing valve white nr 534.36 to 657.34

Sink; glazed fireclay; chromium plated waste, chain and plug; fixing brackets white nr 272.30 to 704.18

Sink; stainless steel; chromium plated waste, chain and self coloured plug single drainer nr 234.97 to 295.29 double drainer nr 272.30 to 341.11

Soil waste stacks; 3.15 m storey height; branch and connection to drain 110 mm PVC nr 363.07 to 409.92 Extra for additional floors nr 181.54 to 216.67 100 mm cast iron; decorated nr 734.93 to 780.31 Extra for additional floors nr 363.07 to 409.92

Industrial buildings - Allowance per m2 of floor area minimum provision m2 11.86 to 16.54 high provision m2 16.54 to 25.03

Hot and cold water installations - Allowance per m2 of floor area Complete installations m2 8.20 to 34.11

SERVICE INSTALLATIONS

HEATING, AIR-CONDITIONING AND VENTILATING INSTALLATIONS

Gas or oil-fired radiator heating gas-fired hot water service and central heating for three radiators nr 2728.90 to 3864.96 extra for additional radiator nr 307.44 to 431.88

LPHW radiator system - Allowance per m2 of floor area m2 72.47 to 100.28 Ventilation systems Local ventilation to WC's nr 272.89 to 363.07 toilet areas - Allowance per m2 of floor area m2 4.98 to 12.30

Air extract system - Allowance per m2 of floor area m2 45.68 to 61.20 Air supply and extract system - Allowance per m2 of floor area m2 65.73 to 100.28 Heating and ventilation - Allowance per m2 of floor area m2 72.47 to 91.35 Warm air heating and ventilation - Allowance per m2 of floor area m2 136.15 to 174.22