ABSTRACT

The required 131,250 kg ofH2 per year equal an hourly production rate of 15 kg per hour. Because of the low efficiency of the H2 production (electrolysis) stage, there is an increased electric demand of 9.87 GWh per year (over 30%) in the system that must be served by the RES only. Meanwhile, RES fraction should does not exceed 20% of the total annually served NC load.