ABSTRACT

More than just a price book, Spon's Civil Engineering and Highway Works Price Book 2004 is a comprehensive, work manual that all those in the civil engineering, surveying and construction business will find it hard to work without. It gives costs for both general and civil engineering works and highway works, and shows a full breakdown of labour, p

part |1 pages

PART 1: GENERAL

chapter |3 pages

PURPOSE AND CONTENT OF THE BOOK

part |2 pages

PART 2: PRELIMINARIES AND GENERAL ITEMS

chapter |1 pages

METHOD RELATED CHARGES

chapter |9 pages

CHECKLIST OF ITEMS

chapter |3 pages

INSURANCES AND BOND

chapter |8 pages

WORKED EXAMPLE

part |2 pages

PART 3: RESOURCES

chapter |4 pages

BASIS OF THIS SECTION

chapter |7 pages

LABOUR COSTS

chapter |89 pages

BASIC MATERIAL PRICES

chapter |47 pages

PLANT

part |1 pages

PART 4: UNIT COSTS (CIVIL ENGINEERING WORKS)

chapter |1 pages

INTRODUCTORY NOTES

chapter |2 pages

GUIDANCE NOTES

chapter |6 pages

CLASS A: GENERAL ITEMS

chapter |9 pages

CLASS B: GROUND INVESTIGATION

chapter |5 pages

CLASS D: DEMOLITION AND SITE CLEARANCE

chapter |54 pages

CLASS E: EXCAVATION

chapter |11 pages

CLASS F: IN SITU CONCRETE

chapter |25 pages

CLASS G: CONCRETE ANCILLARIES

chapter |4 pages

CLASS H: PRECAST CONCRETE

chapter |41 pages

CLASS I: PIPEWORK—PIPES

chapter |2 pages

CLASS J: PIPEWORK—FITTINGS AND VALVES

chapter |3 pages

CLASS M: STRUCTURAL METALWORK

chapter |13 pages

CLASS N: MISCELLANEOUS METALWORK

chapter |13 pages

CLASS O: TIMBER

chapter |48 pages

CLASS P: PILING

chapter |7 pages

CLASS Q: PILING ANCILLARIES

chapter |37 pages

CLASS R: ROADS AND PAVINGS

chapter |19 pages

CLASS S: RAIL TRACK

chapter |9 pages

CLASS T: TUNNELS

chapter |32 pages

CLASS U: BRICKWORK, BLOCKWORK, MASONRY

chapter |18 pages

CLASS V: PAINTING

chapter |11 pages

CLASS W: WATERPROOFING

chapter |12 pages

CLASS X: MISCELLANEOUS WORK

part |1 pages

PART 5: UNIT COSTS (HIGHWAY WORKS)

chapter |1 pages

INTRODUCTORY NOTES

chapter |5 pages

GUIDANCE NOTES

chapter |3 pages

SERIES 100: PRELIMINARIES

chapter |7 pages

SERIES 200: SITE CLEARANCE

chapter |11 pages

SERIES 300: FENCING

chapter |45 pages

SERIES 500: DRAINAGE AND SERVICE DUCTS

chapter |41 pages

SERIES 600: EARTHWORKS

chapter |16 pages

SERIES 700: PAVEMENTS

chapter |22 pages

SERIES 1100: ERBS, FOOTWAYS & PAVED AREAS

chapter |14 pages

SERIES 1200: TRAFFIC SIGNS AND MARKINGS

chapter |4 pages

SERIES 1500: MOTORWAY COMMUNICATIONS

chapter |16 pages

SERIES 1700: STRUCTURAL CONCRETE

chapter |2 pages

SERIES 1800: STEELWORK FOR STRUCTURES

chapter |4 pages

SERIES 2100: BRIDGE BEARINGS

chapter |6 pages

SERIES 2200: PARAPETS

chapter |2 pages

SERIES 2500: SPECIAL STRUCTURES

chapter |15 pages

SERIES 3000: LANDSCAPING AND ECOLOGY

part |1 pages

PART 6: LAND REMEDIATION

chapter |1 pages

GUIDANCE NOTES

chapter |4 pages

DEFINITION

chapter |2 pages

BACKGROUND

chapter |4 pages

INITIAL STUDY

chapter |2 pages

LAND REMEDIATION TECHNIQUES

chapter |6 pages

COST CONSIDERATIONS

chapter |5 pages

THE LANDFILL TAX

part |1 pages

PART 7: UNIT COSTS (ANCILLARY BUILDING WORKS)

chapter |53 pages

INTRODUCTORY NOTES

part |2 pages

PART 8: ONCOSTS AND PROFIT

chapter |1 pages

RISK/OPPORTUNITY

chapter |1 pages

HEAD OFFICE OVERHEADS

chapter |1 pages

PROFIT

chapter |1 pages

VALUE ADDED TAX

chapter 10|6 pages

DER SUMMARY