ABSTRACT

Building Construction Handbook summarises all elements of building construction practice, techniques, components and procedures. Information is presented concisely, in a highly illustrated and accessible style.

This is an essential text for all building construction students up to, and including, undergraduate level. It is an ideal resource for a wide range of courses including: BTEC National, HNC/HND, and Level 3/4 NVQs. The comprehensive coverage and numerous references to the latest Building Regulations, Water Supply Regulations, British and European Standards also makes this book an invaluable reference tool for construction professionals.

The fifth edition consolidates recent amendments to the Building Regulations, including: Part A – Structure; Part C - Site preparation and resistance to moisture; Part E - Resistance to the passage of sound; Part L - Conservation of fuel and power; and Part M - Access to and use of buildings. The new edition also addresses the new governmental requirements for property sellers' information packs, including property condition surveys, structural defects and remedial measures. Reference to supplementary regulations and standards are provided for further reading and new online lecture resources feature essential illustrations for use with presentations and handouts.

Roger Greeno is a well-known author of construction texts. He has extensive practical and consultancy experience in the industry, in addition to lecturing at Guildford College and the University of Portsmouth. He also examines for City & Guilds, Edexcel and the Chartered Institute of Building.

Roy Chudley’s books on Building Construction have helped many thousands of students gain their qualifications and pass exams. He was formerly a Senior Lecturer at Guildford College.

chapter 1|62 pages

GENERAL

chapter 2|82 pages

SITE WORKS

chapter 3|40 pages

BUILDERS PLANT

chapter 4|76 pages

SUBSTRUCTURE

chapter |38 pages

Concrete Production—Materials

chapter 5|240 pages

SUPERSTRUCTURE

chapter 6|98 pages

INTERNAL CONSTRUCTION AND FINISHES

chapter 7|70 pages

DOMESTIC SERVICES

chapter |1 pages

INDEX

chapter |1 pages

Box beam, 423 beam, 378 Box caisson, 269 foundations, 208 Box pile foundation, 219 retaining wall, 233 Breather membrane, 436, 439–40, 490 stairs, 599 Brick: structures, 424 corbel, 312–3, 699, 701 Cap tendons, 398 dentil, 313 Carbon emissions, 523 dog-tooth, 313 Carbon index, 516, 521, 523 infill panels, 494 Cartridge fuse, 687 internal walls, 543 Cased pile foundation, 220 jointing and pointing, 309 Casein adhesive, 422 panel walls, 491 Casement windows: plinths, 312 ironmongery, 344 purpose made, 311 metal, 343, 356 retaining walls, 228, 231, 237–8 timber, 341–2 specials, 310 Castellated beam, 405 strength, 330 Cast-in wall ties, 494 testing, 100 Cast insitu diaphragm walls, 247, underpinning, 273 286 Brick bonding: Cast insitu pile foundation, 223 attached piers, 307 Cast-on finishes, 506 English bond, 304 Cavity barrier, 326, 373, 439 Flemish bond, 305 Cavity closer, 326, 438–9 principles, 303 Cavity tray, 334 special bonds, 237, 302, 306, 308 Cavity walls, 315–6, 329, 526 Brickwork cladding support, 492 Cedar, 631 Bridging of dpc’s, 325 Ceilings: British Standards, 57 plasterboard, 558, 619 Brown field, 295 suspended, 620–3 Buckling factor, 384 Cellular basement, 246 Builders plant, 147–83 Cement grouts, 288 Building control, 54 Central heating, 677–80 Building Regulations, 51–6 Centres, 333 Building Regulations application, 56 Certificates of ownership, 40, 44 Building Regulations exemptions, 55 Channel floor units, 585 Building surveyor, 28–30 Channels, 403–4 Built environment, 3–5 Checked rebates in walls, 338 Built-up roofing felt, 456 Chemical dpc, 323–4 Bulk density, 80 Chemical grouts, 288 Bulking of sand, 101 Chezy formula, 659 Bulldozer, 150 Chimney pot, 22, 699 Bus bar, 683–4 Chimneys, 695, 698, 700 Chipboard, 566, 634 Cab crane control, 173 Circular bay window, 349 Cable sizing, 687 Circular column, 382 Caissons, 269–70 CI/SfB system, 61 Calculated brickwork, 330–1 Cisterns, 668, 673 Calculation of storage space, 96 Cladding panels, 493 Camber arch, 333 Clamp vibrator, 182

Bottom shore, 138 Cantilever: beam, 378 foundations, 208 retaining wall, 233 Braced structures, 425 scaffold, 133

chapter 209|1 pages

pumps, 181 Clay cutter, 311 slab design, 379–80 Climbing cranes, 172, 176 test cubes, 103 Climbing formwork, 235 testing, 104–6 Closed couple roof, 431 Concrete production: Codes of Practice, 57 designated mix, 265 Cofferdams, 267–8 designed mix, 265 Coil wall ties, 234 materials, 261 Cold bridging, 326, 356, 527 prescribed mix, 265 Cold deck, 455 site storage, 262 Cold water installations, 662–3 specification, 265 Collar roof, 431 standard mix, 265 Column design, 383–4, 414 supply, 266 Column formwork, 390–1 volume batching, 263 Column to column connection, 394, weight batching, 264 408 Concreting, 177 Column underpinning, 278 Concreting plant, 177–83 Columns, 382, 403–4, 407–8 Conductivity, 510–1 Combined column foundation, 206 Conduit and fittings, 685–6 Combined method, 514 Conoid roof, 10, 481 Combustion air, 701 Consolidation of soil, 81 Communicating information: Construction activities, 19, 33 bar chart 33 Construction, Design and elevations, 26 Management Regs., 48 floor plans, 26 Construction joints, 119, 250, 547 isometric projection, 24 Construction Products Directive, 59 orthographic projection, 23 Construction Regulations, 47–8 perspective projection, 25 Consumer control unit, 683–4, 688–9 sketches, 22 Contaminated subsoil, 295–7 Complete excavation, 244 Contiguous piling, 285 Completion certificate, 31 Continuous column foundations, 205 Composite beams, 423 Contraction joints, 119 Composite boarding, 633–4 Controlling dimensions, 45 Composite floors, 377, 585 Controlling grid and lines, 45 Composite lintels, 335 Cooker circuit cable, 687 Composite panel, 495 Coping stones, 227–8, 317 Composite piled foundation, 220–1 Corbelled brickwork, 312–3, 699, 701 Compound sections, 404 Core drilling, 73 Compressed strawboard, 633 Core structures, 425 Compressible joints, 491, 547, 603–4 Cored floor units, 585 Concrete: Cor-ply beam, 423 admixtures, 249 Cornice, 630 beam design, 379–80 Corrugated sheet, 467–70 claddings, 490, 502–4 Coulomb’s line, 80 column design, 383–4 Coulomb’s wedge theory, 241 floor screed, 569–70 Counter batten, 440 mixers, 178–9 Couple roof, 431 placing, 182 Cove mouldings, 557, 619

Classification of piled foundations, production, 261–6 pumps, 181 Clear glass, 351 stairs, 598–606 Client, 48 surface finishes, 505

chapter |1 pages

Cover flashing, 700 Documents for construction, 20 CPI System of Coding, 60 Dog leg stair, 596–7 Crane rail track, 175 Domestic drainage, 650–3 Crane skips, 177 Domestic electrical installations, Cranes, 165–76 681–9 Cranked slab stairs, 598, 604 Domestic floor finishes, 565–6 Crawler crane, 169 Domestic ground floors, 561–4 Creep, 397 Domestic heating systems, 677–80 Crib retaining wall, 237 Doors: Crosswall construction, 370–1 external, 361–3 Crown hinges, 417 fire, 615–7 Curtain walling, 499–501 frames, 364, 614 Curved laminated timber, 421 glazed double swing, 618 Curved tendons, 398 industrial, 366–9 Cut and fill, 65, 255 internal, 361, 612–3 Cylinders, 669 ironmongery, 365 linings, 611, 613 Dado panel and rail, 630 performance, 361 Damp proof course, 320–326 sliding, 366, 368 Damp proof course materials, 321–2 types, 362–3 Damp proof membrane, 320, 327 Door set, 614 Datum, 109–14 Dormer window, 429, 454 Datum post, 109, 111–3 Double acting hammers, 225 Dead loads, 34–5, 142, 199 Double action floor spring, 618 Dead shoring, 136–7, 142–3 Double flying shore, 140 Decorative suspended ceiling, 623 Double glazing, 342, 348, 353, 356 Deep basements, 247–8 Double hung sash windows, 345–6 Deep strip foundation, 205 Double lap tiling, 437–8, 441–2 Defects in painting, 627 Double layer grids, 477 Deflection, 413, 423, 578 Double rafter roof, 432 Demountable partitions, 551–2 Double swing doors, 618 Dense monolithic concrete, 249 Douglas fir, 631 Dentil course, 313 Dovetail anchor slots, 491, 494 Density of materials, 35, 510–1 Draft for Development, 57 Design of foundations, 197–9, 204 Draglines, 157 Designer, 48 Drainage: Dewatering, 279–83 effluent, 639 Diaphragm floatvalve, 667 gradient, 656, 659 Diaphragm walls, 247, 286–7, 319 paved areas, 644 Diesel hammers, 225 pipe sizes, 659 Dimensional coordination, 46 proportional depth, 659 Dimensional grids, 46 roads, 645–6 Dipper arm, 245 simple, 650–7 Direct cold water system, 662 systems, 650–2 Direct hot water system, 664 testing, 658 Displacement pile foundation, 209, Drained cavities, 253 215–226 Draught proofing, 528 Disturbed soil sample, 68, 71 Drawings:

Documents for construction, 20 Cracking in walls, 192 Cradles, 132 Domelights, 489 Crane operation, 173 Domes, 10, 477–8

chapter 36|1 pages

–9 setting out, 109–10 orthographic projection, 23 temporary support, 258–60 perspective projection, 25 Expansion joint, 119, 250, 480, 492, plans and elevations, 26 547, 565 sketches, 22 Exposed aggregate, 506 Drilling rigs, 211–4 External asphalt tanking, 251 Driven insitu piled foundations, 222 External doors, 361–3 Drop arch, 333 External envelope, 18, 301 Drop hammer, 211, 217, 220–2, 224 External escape stairs, 607 Dry linings, 555–7 Dry rot, 463–4 Facade bracing, 124 Dumpers, 160, 180 Face grid, 46 Dumpling, 243 Face shovel, 155, 245 Dynamic compaction, 290, 292 Facings to panel walls, 493 Factories Acts, 47 Earth pressures, 230, 240 Fencing, 83–4, 94 Earthworks for roads, 117 Festoon lighting, 90 Eaves: Fibreboard, 634 closure piece, 468–9 Finger joints, 419 details, 438–40, 444–5, 524 Finishes, 15 filler piece, 468–9 Fin walls, 318 ventilation, 439, 445, 458–9 Fire back, 697, 701 Effective height of walls, 331 Fire doors, 615–7 Effective length of columns, 414 Fire protection of steelwork, 409–10 Effective thickness of walls, 329, 331 Fire resistance of steelwork, 409 Effluents, 639 Fire resisting doors, 617 Electrical cables, 685 Fire stops and seals, 694 Electrical installations, 684–9 Fireplaces and flues, 695–703 Electrical site lighting, 88–91 Fish plates, 408 Electricity: Fixed portal frame, 415–6, 418 domestic supply, 681–3 Flashings, 317, 442, 453, 456, 700 supply to sites, 91 Flat roofs, 451–6 Elemental method, 516–8, 522 Flat sawn timber, 420 Elevations, 26 Flat slabs, 579 End bearing pile foundation, 209 Flat top girder, 471, 474 Energy efficiency, 516 Flemish bond, 305 Energy roof system, 470 Flexible paving, 117 English bond, 304 Flitch beam, 423 Environment, 3–5 Float valves, 667 Equivalent area, 383–4 Floating floor, 533 Espagnolette, 348 Floating pile foundation, 209 European spruce, 631 Floor plans, 26, 39 European Standards, 58 Floor springs, 618 Excavating machines, 154–8, 245 Floors: Excavations: domestic ground, 561–4 basement, 242–5 finishes, 565–6 dewatering, 279–8 fixings, 583

axonometric projection, 24 oversite, 255 construction process, 21 hatchings, symbols and notation, reduced level, 255 setting out, 109–10 isometric projection, 24 trench, 256

chapter |1 pages

flat slab, 579, 582 Frodingham sheet pile, 268 ribbed, 580 Gambrel roof, 429, 435 screeds, 569–70 Gantry crane, 170 sound insulation, 533–4 Gantry girder, 404 suspended timber ground, 561, 563 Gantry scaffolding, 135 suspended timber upper, 571–6 Garden wall bonds, 306 waffle, 581 Gas: Flue blocks, 693, 703 fires, 692 Flue lining, 697–702 flues, 693, 703 Flush bored pile foundation, 209 service intake, 690–1 Fly jib, 168–9 supply, 690 Flying shore, 136, 139–41 Gas resistant membranes, 327–8 Folded plate construction, 9 Gate valve, 667–8 Footpaths, 120 Gauge box, 263 Forklift truck, 161 Geodistic dome, 477 Formwork: Girders, 404, 473–4, 471 beams, 388–9 Glass and glazing, 351–8 columns, 390–1 Glass block wall, 359–60 principles, 387 Glazed cladding, 498 slab, 376 Gluelam, 419–21 stairs, 602 Grab bucket, 157 Foundation hinges, 417 Graders, 152 Foundations: Granular soil shell, 211 basic sizing, 197 Green field, 295 beds, 196 Grillage foundation, 206 calculated sizing, 199 Groins, 481 defects, 189–90, 192 Ground anchors, 247, 287, 402 functions, 187 Ground freezing, 289 grillage, 206 Ground vibration, 291–2 isolated, 206 Ground water, 279 piled, 209–226 Ground water control, 280–9 raft, 203 Grouting – subsoil, 288 short bored piled, 202, 209–11 Grouting – tiles, 560 simple reinforced, 201 Guard rail, 125–7, 129–30, 133–4 stepped, 200 Gusset plate, 418, 466, 469 strip width guide, 198 subsoil movement, 188–90, 192 Half hour fire door, 615 types, 204–8 Hammer head junction, 116 Four-in-one bucket, 153 Hand auger, 72 Four wheeled grader, 152 Hand auger holes, 67 Framed structures, 378, 382, 407–8, Handrail, 610 424 Hardwoods, 632 Freyssinet anchorage, 400 Health and Safety at Work, etc. Act, Friction hinge, 348 47, 49 Friction piling, 209 Hearths, 696–7, 701 Frieze, 630 Helical binding, 382 Frodingham box pile, 219 Helical stairs, 600

Frodingham sheet pile, 268 hollow pot, 582–3 insitu RC suspended, 579–83 Fungicide, 464 large cast insitu, 567–8 Furniture beetle, 461 precast concrete, 584–6

chapter |1 pages

High performance window, 342 types, 543 Hinge or pin joints, 417 Intumescent collar, 694 Hip tiles, 437, 441 Intumescent strips, 615–7 Hoardings, 83–7 Inverted warm deck, 455 Hoists, 162–3 Iroko, 632 Holding down bolts, 393, 407 Ironmongery, 344, 365 Hollow box floor units, 584 Isolated foundations, 195, 206 Hollow pot floor, 582–3 Isometric projection, 24 Hollow sections, 403 Horizontal shore, 139–41 Jack pile underpinning, 274 Horizontal sliding sash window, 347 Jambs, 336, 338 Hot water: Jarrah, 632 cylinders, 669 Jet grouting, 288, 290, 294 direct system, 664 Jetted sumps, 281 expansion vessel, 666 Jetted well points, 282–3 heating systems, 677–80 Joinery production, 628–32 indirect system, 665 Joinery timbers, 631–2 mains fed, 666 Jointing and pointing, 309 House Longhorn beetle, 461 Jointless suspended ceiling, 621 Hull core structures, 425 Joints: Hyperbolic paraboloid roof, 10, basements, 250 482–3 blockwork, 547 drainage, 657 Immersion heater cable, 687 laminated timber, 419 Inclined slab stair, 598, 601 portal frame, 416–8 Independent scaffold, 126 roads, 119 Indirect cold water system, 663 Joists: Indirect cylinder, 669 timber, 561, 563, 571–6 Indirect hot water system, 665 steel, 403–5 Industrial doors, 366–9 Joist sizing – timber, 576–8 Infill panel walls, 493–6 Joist sizing – steel, 411–3 Inspection chambers, 639, 645, 650–6 Insulating dpc, 326 Kerbs, 121 Insulation of basements, 254 Kelly bar, 212–4 Insulation – sound, 530–4 Kentledge, 278 Insulation – thermal, 507–26 Kitemark, 57 Integrity, 615, 617 Interest on capital outlay costing, 148 Ladders, 125–6, 129 Internal asphalt tanking, 252 Laminated timber, 419–21 Internal doors, 361, 611–7 Land caissons, 269 Internal drop hammer, 211, 220, 222 Land reclamation, 295 Internal elements, 541 Landings, 596–608 Internal environment, 3 Lantern lights, 488 Internal partitions, 548–52 Large diameter piled foundations, Internal walls: 210, 214 block, 545–7 Larssen sheet piling, 268 brick, 544 Latent defects, 28

Helmets, 217, 221 functions, 542 Hemispherical dome, 478 plaster finish, 553–4 Herringbone strutting, 572 plasterboard lining, 555–8 types, 543 Highway dumpers, 160 International Standards, 58

chapter |1 pages

Lattice jib crane, 168 Metal stairs, 607–9 Leader – piling rig, 217 Meter box, 681–3, 690–1 Lean-to roof, 431 Methane, 327 Lens light, 488 Method statement, 32 Levelling, 112–4 Micro-bore heating, 679 Lift casting, 235 Middle shore, 138 Lighting: Middle third rule, 228 cable, 687 Mineral insulating cable, 685 circuits, 688–9 Miniature circuit breaker, 683–4 sites, 88–90 Mixing concrete, 177 Lightweight decking, 476 Mobile cranes, 165 Lightweight infill panels, 493, 495–6 Mobile scaffold, 129 Lintels, 332, 335–8 Modular coordination, 45–6 Litzka beam, 405 Modular ratio, 383 Load-bearing concrete panels, 502 Mohr’s circle, 80 Load-bearing partitions, 548 Moment of resistance, 143, 411 Load-bearing internal walls, 541, Monitor roof, 471, 473 543–5 Monogroup cable, 397 Locating services, 108 Monolithic caissons, 269 Loft hatch, 529 Monostrand anchorage, 400 Long span roofs, 471–6 Monostrand cable, 397 Loop ties, 236 Mortar strength, 330 Lorries, 159 Morticing machine, 628 Lorry mounted cranes, 167–8 Movement joint, 119, 492, 547, 604 Low emissivity glass, 355 Mud-rotary drilling, 73 Luffing jib, 171 Multi-purpose excavators, 154, 158 Multi-span portal frames, 416, 418 Maguire’s rule, 659 Multi-stage wellpoints, 283 Mahogany, 632 Multi-storey structures, 424–5 Main beams, 8, 17, 408 Mandrel, 221 Needle and pile underpinning, 275 Manometer, 658, 676 Needle design, 142–3 Mansard roof, 429, 435 Needles, 136–41 Masonry partitions, 548 Newel post, 588, 591–4, 596–7 Mass concrete retaining wall, 232 NHBC, 28 Mass retaining walls, 231–2 Non-load-bearing partitions, 541–4, Mast cranes, 171 548–52 Mastic asphalt tanking, 251–2 Northlight barrel vault, 481 Mastic asphalt to flat roofs, 456 Northlight roofs, 471–2 Materials: conductivity, 510–1 Oak, 632 density, 35, 510–1 Oedometer, 81 hoist, 162 Oil based paint, 624 storage, 94–9 One hour fire door, 616 testing, 100–6 One pipe heating, 677 weights, 34–5 Open caissons, 269

Lateral restraint, 460, 571, 573–4 Mechanical auger, 72 Lateral support – basements, 248 Meeting rails, 345–6 Lateral support – walls, 434, 460, 573 Meeting stiles, 347, 618 Lattice beam, 406, 423, 473–4 Metal casement windows, 343 Lattice girder, 406 Metal section decking, 377

chapter |1 pages

Open excavations, 242 doors, 361 Open fireplaces, 695–703 roofs, 426 Open riser stairs, 593–5, 605 windows, 339 Open suspended ceiling, 623 Perimeter trench excavation, 243 Open web beam, 405 Permanent exclusion of water, 279, Openings in walls: 284–8 arches, 332–4 Permanent formwork, 377 heads, 335, 338 Permitted development, 40 jambs, 336, 338 Perspective drawing, 25 sills, 337–8 Phenol formaldehyde, 422, 635 support, 332 Pigment, 624 threshold, 338, 535 Pile: Oriel window, 349 beams, 226 Oriented strand board, 634 caps, 213, 226 Orthographic projection, 23 classification, 209 Out-of-service crane condition, 172 testing, 226 Output and cycle times, 149 types, 210 Overcladding, 497 Piled basements, 246 Overhead and forklift trucks, 161 Piled foundations, 209–26 Piling: Pad foundation, 195, 206, 382, 407, contiguous, 285 416, 418 hammers, 224–5 Pad foundation design, 197 helmets, 217, 221 Pad template, 111 rigs, 217, 220–1 Paint defects, 627 steel sheet, 267–8 Paints and painting, 624–6 Pillar tap, 667 Panelled suspended ceiling, 620, 622 Pin or hinge joint, 417 Parallel lay cable, 397 Pitch pine, 631 Parane pine, 631 Pitched roofs, 428–35 Parapet wall, 317 Pitched trusses, 471–2 Partially preformed pile, 221 Pivot window, 348 Particle board, 566, 634 Placing concrete, 177 Partitions: Plain tiles and tiling, 437–8, 441–2 demountable, 551–2 Planer, 628 load-bearing, 548 Plank and pot floor, 585 metal stud, 550 Planning application, 40–4 non-load-bearing, 548–52 Planning grid, 45 timber stud, 549 Planning supervisor, 48 Passenger hoist, 163 Plant: Passenger vehicles, 159 bulldozer, 150 Passive earth pressures, 230 concreting, 177–82 Patent glazing, 472–3, 486–7 considerations, 147 Patent scaffolding, 130 costing, 148 Paved areas, 644 cranes, 165–76 Paving, 117, 120, 122 dumpers, 160, 180 Paving flags, 122 excavators, 154–8, 245 Pedestal, 587 forklift trucks, 161 Pendentive dome, 10, 478 graders, 152 Penetration test, 77, 105 hoists, 162–3 Percussion bored piling, 210–1 scrapers, 151 Performance requirements: tractor shovel, 153

doors, 361 roofs, 426 windows, 339 Perimeter trench excavation, 243 Permanent exclusion of water, 279,

chapter 533|1 pages

–4, 619 Plasterboard dry lining, 555–7 Quarter sawn timber, 420 Plasters, 553 Quetta bond, 237 Platform floor, 534 Platform frame, 372 Radiators, 677–80 Plinths, 312 Radius of gyration, 414 Plug wiring, 687 Radon, 327 Plywood, 633 Raft basements, 246 Pneumatic caisson, 270 Raft foundations, 203, 207 Poker vibrator, 182 Rail tracks for cranes, 175 Poling boards, 260 Rainscreen cladding, 493, 497 Polyurethane paint, 624 Rainwater drainage, 649 Portal frames, 415–8, 421 Rainwater installations, 647–8 Portsmouth float valve, 667 Raised access floor, 587 Post-tensioned retaining wall, 238 Raking shore, 138, 141 Post-tensioning, 238, 399–400 Raking struts, 139–40, 244 Power circuit, 688 Rankine’s formula, 240 Power float, 183 Rat trap bond, 306 Precast concrete: Ready mixed concrete, 266 diaphragm wall, 287 Ready mixed concrete truck, 180 floors, 564, 584–6 Redwood, 631 frames, 392–5 Reinforced concrete: portal frames, 416 beams, 378–80 stairs, 603–6 column design, 383–4 Preformed concrete pile, 217–8 columns, 382–4 Preservative treatment, 422, 462, 464 floors, 579–82 Pressed steel lintels, 335 formwork, 376, 387–91, 602 Pressure bulbs, 69–70 foundations, 201–3 Prestressed concrete, 396–402 pile caps and beams, 226 Pretensioning, 398 raft foundation, 203, 207 Primary elements, 13 reinforcement, 376–86 Primatic cylinder, 669 retaining walls, 233 Principal contractor, 48 slabs, 374–6 Profile boards, 110–1 stairs, 599–602 Profiled surface, 122, 505, 536 strip foundations, 201, 205 Programme of work, 33 Reinforced masonry, 237–8, 308 Programmer/controller, 680 Reinforcement: Prop design, 143 bar coding, 385 Proportional area method, 513, 515 bar schedule, 386 Propped structures, 424 grip length, 381 Protection orders, 107 Remedial dpc, 322–4 Public utility services, 108 Remote crane control, 173 Published Document, 57 Rendhex box pile, 219 Pump sizing, 280 Replacement piling, 209–10 Purlin fixings, 468 Residual current device, 684 Purlin roof, 432 Resin grout, 288

transport vehicles, 159–61 Purpose designed excavators, 154 Plaster cove, 557, 661 Purpose made joinery, 628 Plaster finish, 554 Putlog scaffold, 125 Plasterboard, 510, 555–8 Putty, 352 Plasterboard ceiling, 438, 444–5, 515, Pynford stool underpinning, 276

chapter |1 pages

Reversing drum mixer, 179 trussed rafter, 434 Ribbed floor, 581–3 trusses, 433, 465 Rider, 141 underlay, 436 Ridge detail, 438–9, 444–5 ventilation, 457–9 Ridge piece, 468–9 Rooflights, 486–9 Ridge roll, 450 Room sealed appliance, 692 Ridge tiles, 438–9, 441, 444–5 Rotary bored piling, 210, 213–4 Ridge vent, 438, 444, 457–8 Rotational dome, 10, 478 Rigid pavings, 118 Rubble chutes and skips, 164 Rigid portal frames, 415–6, 418 Runners, 260 Ring main wiring, 688 Roads: Saddle vault, 482 construction, 116–9 Safe bearing, 198–9, 578 drainage, 645–6 Safety signs, 49–50, 123 earthworks, 117 Sampling shells, 72 edgings, 121 Sand bulking test, 101 footpaths, 120 Sand compaction, 292 forms, 118 Sand pugging, 534 gullies, 644–6 Sanitary fittings: joints, 119 basin, 671 kerbs, 121 bath, 672 landscaping, 123 discharge systems, 674–5 pavings, 122 shower, 672 services, 123 sink, 671 setting out, 116 WC pan, 673 signs, 123 Sanitation systems, 674–6 Rolled steel joist, 403 Sanitation system testing, 676 Roll over crane skip, 177 Sapele, 632 Roller shutters, 366, 369 Sash weights, 345 Roofs and roof covering: Saws, 628 basic forms, 427–9 Scaffolding: built-up felt, 452–3 birdcage, 131 flat top girder, 471, 474 boards, 125–7 long span, 471–6 cantilever, 133 mastic asphalt, 456 component parts, 124 monitor, 471, 473 gantry, 135 northlight, 471–2 independent, 126 performance, 426 ladders, 125–6, 129 sheet coverings, 467–70 mobile, 129 shells, 477–85 patent, 130 slating, 445–9 putlog, 125 space deck, 476 slung, 131 space frame, 477 suspended, 132 surface water removal, 642–3, truss-out, 134 647–8 tying-in, 128 thatching, 450 working platform, 127

Resorcinol formaldehyde, 422, 633 thermal insulation, 515, 517–8, Restraint straps, 460, 571, 573 521–4 Retaining walls, 227–41 tiling, 437–8, 441–5 Retaining walls – design, 240–1 timber flat, 427, 451–6 Retro-ties and studs, 574 timber pitched, 428–35

chapter |1 pages

Secondary glazing, 354 Site: Section factor, 410 construction activities, 19 Section modulus, 143, 411 electrical supply, 91 SEDBUK, 517, 520 health and welfare, 93 Segmental arch, 333 investigations, 66, 68, 290 Self propelled crane, 166 layout, 82–4 Self supporting static crane, 172–3 lighting, 88–90 Services fire stops and seals, 694 materials testing, 100–6 Setting out: offices, 83–4, 92, 97 angles, 115 plan, 27, 40 bases, 111 security, 83, 85 basic outline, 109 setting out, 109–15 drainage, 657 soil investigations, 67–73 grids, 111 storage, 94–9 levelling, 113–4 Six wheeled grader, 152 reduced levels, 112 Sketches, 22 roads, 116 Skimmer, 154 theodolite, 111, 115 Skips, 164 trenches, 110 Slates and slating, 445–9 Shear, 378, 412, 578 Slenderness ratio, 143, 331 Shear bars, 378 Sliding doors, 366–8 Shear box, 81 Sliding sash windows, 345–7 Shear leg rig, 72–3, 211 Slump test, 103 Shear plate connector, 475 Slung scaffold, 131 Shear strength of soils, 80–1 Small diameter piled foundation, Shear wall structures, 425 210–3 Sheathed cables, 685 Smoke seal, 617 Sheet coverings, 467–70 Smoke test, 676 Shell roofs, 477–85 Soakaway, 649 Shoring, 136–43 Soakers, 442, 448, 700 Short bored pile foundation, 202 Socket outlets, 687–8 Shower, 672 Softwoods, 631 Shutters, 369 Soil: Sight rails, 111–2, 116, 657 assessment, 75–81 Sills, 337–8, 341–3 classification, 75–7, 198 Silt test for sand, 102 improvement, 290–4 Simple drainage: investigation, 67–73, 290 bedding, 657 particle size, 75 inspection chambers, 650–6 samples, 68 jointing, 657 stabilization, 290–4 roads, 645–6 testing, 75–81 setting out, 657 Solid block walls, 314 systems, 650–3 Solid brick walls, 302 Simply supported RC slabs, 374–6 Solid slab raft, 207 Single acting hammer, 224 Sound insulating: Single barrel vault, 479 floors, 533–4

Scarf joint, 419 Single flying shore, 139 Scrapers, 151 Single lap tiles and tiling, 443–4 Screed, 556–9 Single span portal frames, 415–6, 418 Secondary beams, 8, 17, 408 Single stack drainage, 674 Secondary elements, 14 Sink, 671

chapter |1 pages

Spindle moulder, 628 Strip foundations, 194, 197–9 Spine beam stairs, 605 Stripboard, 633 Splice joint, 418 Structural grid, 45 Splicing collar, 217–8 Structure: Split barrel sampler, 77 basic forms, 8–11 Split load consumer unit, 684 basic types, 6–7 Split ring connector, 475 functions, 16–17 Stack bond, 308 protection orders, 107 Stairs: Strutting of floors, 572 alternating tread, 595 Stud partitions, 549–50 balusters, 588–9, 591–4, 597, 600–1 Subsoil: balustrade, 14, 600–1, 606–10 drainage, 640–1 formwork, 602 movements, 188–91 handrail, 588–9, 591, 593, 595–7, water, 279 600–1, 606–8, 610 Substructure, 12 insitu RC, 598–602 Sump pumping, 280 metal, 607–9 Supply and storage of concrete, 177 open riser, 593–4 Supported static tower crane, 171, 174 precast concrete, 603–6 Surcharging, 290 timber, 588–97 Surface water, 279, 639, 642–6 Standard Assessment Procedure, 516 Surface water removal, 642–4 Standard dumper, 160 Survey: Standard crane skip, 177 defects, 28–31, 192 Steel: site, 65–6, 68, 290, 295 beam, 403–4 structure, 28–31 beam design, 411–3 thermographic, 524 column, 403–4 Suspended ceilings, 620–3 column design, 414 Suspended scaffold, 132 compound sections, 404 Suspended structures, 424 gantry girder, 404 Swivel skip dumper, 160 lattice beams, 406 portal frames, 418 Tactile pavings, 122 roof trusses, 465–6 Tamping board vibrator, 182 screw pile, 219 Target U value, 516, 519–20, 528 sheet piling, 267–8 Teak, 632 standard sections, 403 Telephone installation, 704–5 string stairs, 609 Telescopic boom forklift truck, 161 tube pile, 220 Telescopic crane, 167 Stepped barrel vault, 481 Temporary bench mark, 109, 111–3 Stepped flashing, 442, 700 Temporary exclusion of water, 279–83 Stepped foundation, 200 Temporary services, 83 Stock holding policy, 97 Tendons, 397 Stop valve, 667–8 Tenoning machine, 628 Storage of materials, 84, 93, 99 Test cubes, 103 Storey height cladding, 504 Testing of materials, 100–6 Straight flight stairs, 588–92 Textured surfaces, 505

walls, 531–2 Straight line costing, 148 Sound insulation, 530–4 Straight mast forklift truck, 161 Sound reduction, 353, 530 Strand, 397 Space deck, 11, 476 Stress reduction in walls, 331 Space frame, 11, 477 String beam stair, 598

chapter |1 pages

Thermal insulation, 507–25 Trial pits, 67, 71 Thermal resistance, 507–9, 513, 515 Triangle of forces, 228 Thin grouted membranes, 284 Triangular chart, 76 Thinners, 624 Triaxial compression test, 80 Three axle scraper, 151 Tripod rig, 72–3, 211 Three centre arch, 333 Truss out scaffold, 134 Three pin portal frame, 415 Trussed rafter roof, 434 Tile hanging, 490 Tubular scaffolding, 124–35 Tilting drum mixer, 178–9 Two axle scraper, 151 Tilting level, 113 Two pin portal frame, 415 Timber: Two pipe heating, 678 beam design, 576–8 Tying-in scaffolding, 128 casement windows, 341–2 connectors, 433, 475 U value calculations, 507–8, 512–5 doors, 361–3, 367–8 U values, 355, 470, 507–8, 512–5 flat roofs, 451–6 Unconfined compression test, 79 frame construction, 372–3 Undercoat, 625 girders, 474 Underlay, 436, 438–42, 444–6, 448–9 hardwoods, 632 Underpinning, 271–8 joinery production, 628–32 Under-reaming, 214 pile foundation, 216 Undersill cladding panels, 503 pitched roofs, 430–50 Universal beam, 403 preservation, 461–2, 464 Universal bearing pile, 219 softwoods, 631 Universal column, 403 stairs, 588–97 Universal excavator, 154 storage, 99 Urea formaldehyde, 422, 635 stud partition, 549 trestle, 220 Vacuum dewatering, 568 Timbering, 258–60 Valley beam, 472 Tooled surface, 505 Valley gutter, 472 Toothed plate connector, 433, 474–5 Valley tiles, 437, 441 Top shore, 138, 141 Vane test, 78 Towed scraper, 151 Vans, 159 Tower cranes, 90, 165, 172–5 Vapour control layer, 455, 457, 470, Tower scaffold, 129 473, 558, 619 Track mounted crane, 175 Vaults, 479–81 Tractor shovel, 153 Ventilated stack discharge system, 675 Traditional strip foundation, 194 Ventilation of roof space, 436, Traditional underpinning, 273 438–40, 444–5, 452–3, 457–9 Translational dome, 10, 478 Ventilation spacer, 438, 444–5 Translucent glass, 351 Verge details, 442, 453 Transport vehicles, 159 Vertical casting, 506 Transporting concrete, 180 Vertical laminations, 420 Traveller, 110–2, 657 Vestibule frame, 357 Travelling tower crane, 172, 175 Vibrating tamping beam, 182 Tree protection, 97, 107, 191 Vibration of soil, 290–2

Thatched roof, 450 Trees – foundation damage, 189–90 Theodolite, 109, 115 Tremie pipe, 212, 286 Thermal break, 356 Trench fill foundation, 205 Thermal bridging, 527–8 Trench setting out, 110 Thermal conductivity, 508, 510–3, 515 Trench sheeting, 267–8

chapter |1 pages

Wall hooks, 138, 141 Water test, 659 Wall plates, 138–41, 432–5, 438, 445, Waterproofing basements, 249–53 450, 452, 456, 460 Weatherboarding, 490 Wall profiles, 546 Web cleats, 407–8 Wallboard, 557–8 Weep holes, 227–33 Walls: Weight batching, 264 cavity, 315–6, 329, 526 Weights of materials, 34–5 curtain, 499–501 Wellpoint systems, 282–3 diaphragm, 247, 286–7, 319 Western hemlock, 631 design strength, 330 Western red cedar, 631 diaphragm, 247, 286–7, 319 Wet rot, 463–4 fin, 318 Windows: formwork, 234–6 aluminium casement, 356 glass block, 359–60 bay, 349 infill panel, 493–6 double glazing, 342, 348, 353 internal, 541–52 glass and glazing, 351–8 openings, 332–8 high performance, 342 panelling, 630 ironmongery, 344 remedial work, 574 metal casement, 343 retaining, 227–41 oriel, 349 rising dampness, 322–5 performance requirements, 339 slenderness ratio, 143, 331 pivot, 340, 348 solid block, 314, 545, 547 schedules, 350 solid brick, 302–7, 544 sliding sash, 345–7 sound insulation, 530–2 timber casement, 341–2 thermal insulation, 508–9, 513–4, types, 340 517–9, 522–3, 526 Wired glass, 351 thickness, 329, 331 Wiring systems, 686–9 tiling, 490, 559–60 Wood cement board, 634 underpinning, 272–7 Wood rot, 464 waterproofing, 249–53 Wood wool, 634 Warm deck, 455 Woodworm, 461 Wash boring, 73 Woodworking machinery, 628 Water bar, 250–4, 364 Working platform, 127 Water based paint, 624 Wrought iron dogs, 137, 139–40 Water/cement ratio, 249, 264 Water closet pan, 673 Yokes, 391 Water installations: cisterns, 668, 673 Zed beam, 468, 470 cold, 662–3 Zipper bond, 302 hot, 664–6 Zones, 46 pipe joints, 670 Zurich Insurance, 28

Vibro cast insitu piling, 223 supply, 660–1 Volume batching, 263 Water jetting, 281–3, 292 Water table, 74, 279 Water test, 659 Waterproofing basements, 249–53