ABSTRACT
The Dictionary of Construction Terms offers clear and concise explanations of the most commonly encountered legal and technical terms, phrases and abbreviations used throughout the construction industry. It will save valuable time when searching for an authoritative explanation of a frequently used term and will become a practical reference for construction lawyers, practitioners and students, as well as those in related industries including planning, property and insurance.
Why you should buy this book:
- There is no other all-inclusive collection of legal and technical terms available at present
- Convenient source of information for lawyers, practitioners and students
- Includes a list of common technical acronyms (ie. DPC, DPM, FFL)
- Lists acronyms of common institutions such as the ICE, JCT and ACE
Examples of definitions:
Modular construction
A modern construction method whereby the building is constructed using prefabricated or pre-assembled building sections or modules. The three-dimensional building sections are typically fabricated and assembled in an enclosed factory environment and then delivered to site, ready for installation. Modular construction is aimed at minimising construction time by standardising design components, providing consistent quality and allowing site preparation and building activities to commence concurrently with the construction of the factory-made modules.
Snagging
The process of formally inspecting the construction works to identify any incomplete works or defects in completed works. A snagging list (or ‘punch list’) is a schedule of defects resulting from this inspection. These items typically need to be rectified prior to the issuing of a completion certificate or handing-over of the works although in some cases a completion certificate will be issued with a snagging list attached.
TABLE OF CONTENTS
entry |1 pages
Aac
entry |1 pages
Abandonment
entry |1 pages
Abatement
entry |1 pages
Abe
entry |1 pages
Ab initio
entry |1 pages
Above ordnance datum (Aod)
entry |1 pages
Absolute obligation
entry |1 pages
Absorption
entry |1 pages
Abuse of process
entry |1 pages
Abutment
entry |1 pages
Aca
entry |2 pages
Accelerated Low Water Corrosion (Alwc)
entry |1 pages
Acceleration
entry |1 pages
Accelerator
entry |1 pages
Acceptance
entry |1 pages
Accepted programme
entry |1 pages
Accepted risk
entry |1 pages
Access floor
entry |1 pages
Access to site
entry |1 pages
Accident
entry |1 pages
Accommodation works
entry |1 pages
Accord and satisfaction
entry |1 pages
Ace
entry |1 pages
Acknowledgement of service
entry |1 pages
AcoP
entry |1 pages
Acoustic boards/panels/tiles
entry |1 pages
Acquiescence
entry |1 pages
Action
entry |1 pages
Activation
entry |1 pages
Active solar heating
entry |1 pages
Activity
entry |1 pages
Activity Schedule
entry |1 pages
Act of God
entry |1 pages
Act of Parliament
entry |1 pages
Actual cost
entry |1 pages
Actual cost contract
entry |1 pages
Actual notice
entry |1 pages
Addendum bills
entry |1 pages
Additional claim
entry |1 pages
Additional party
entry |1 pages
Additional work
entry |1 pages
Address for service
entry |1 pages
Addressable fire alarm system
entry |1 pages
Adequacy of consideration
entry |1 pages
Adequacy of damages
entry |1 pages
Ad hoc
entry |1 pages
Ad idem
entry |1 pages
Adjoining owner
entry |1 pages
Adjudication
entry |1 pages
Adjudication Rules
entry |1 pages
Adjudicator
entry |2 pages
Adjudicator Nominating Body (Anb)
entry |2 pages
Adjudicator's jurisdiction
entry |1 pages
Adjusted as-planned programme
entry |1 pages
Administration
entry |1 pages
Administration Order
entry |1 pages
Administrative charges
entry |1 pages
Administrative Receiver
entry |1 pages
Admissibility of evidence
entry |1 pages
Admixture
entry |1 pages
Adr
entry |1 pages
Adr agreement
entry |1 pages
Adr clause
entry |1 pages
Adsorption
entry |1 pages
Advance payment guarantee
entry |1 pages
Advance payments
entry |1 pages
Adverse physical conditions
entry |1 pages
Adverse weather conditions
entry |1 pages
A&E, A/E
entry |1 pages
Aerated concrete
entry |1 pages
Aeration
entry |1 pages
Afc
entry |1 pages
Affidavit
entry |1 pages
Affirmation
entry |1 pages
A fortiori
entry |2 pages
A-frame building
entry |1 pages
Aga
entry |1 pages
Agc
entry |1 pages
Agency
entry |1 pages
Agent
entry |1 pages
Aggregate
entry |1 pages
Aggregate/cement ratio
entry |1 pages
Aggregates levy
entry |1 pages
Agreement
entry |1 pages
Agrément Certificate
entry |1 pages
Ahu
entry |1 pages
Ai
entry |1 pages
Aia
entry |1 pages
Air-admittance valve
entry |1 pages
Air balancing
entry |1 pages
Air brick
entry |1 pages
Air conditioning
entry |1 pages
Air curtain or air door
entry |1 pages
Air diffuser
entry |1 pages
Air-dried timber
entry |1 pages
Airey house
entry |1 pages
Air-entraining admixture
entry |1 pages
Air handling unit (Ahu)
entry |1 pages
Air space
entry |2 pages
Air termination network
entry |1 pages
Alarp
entry |1 pages
Alcatel Letter
entry |1 pages
Alcatel period
entry |1 pages
Alderslade principle
entry |1 pages
Alghussein Establishment v Eton College
entry |1 pages
Alkali metal
entry |1 pages
Alkaline
entry |1 pages
Alkali-resistant glassfibre
entry |1 pages
Alkali-resistant paint
entry |1 pages
Alkali silica reaction (Asr)
entry |1 pages
Alliancing
entry |1 pages
All-in aggregate
entry |1 pages
All-inclusive price principle
entry |1 pages
Allocation Questionnaire
entry |1 pages
Alternate bay construction
entry |1 pages
Alternative Dispute Resolution (Adr)
entry |1 pages
Aluminium
entry |1 pages
Aluminium Industrie Vaassen Bv v Romalpa Aluminium Ltd
entry |1 pages
Aluminium roofing
entry |1 pages
Aluminium–zinc coating
entry |1 pages
Alwc
entry |2 pages
Ambiguity
entry |1 pages
Ambush
entry |1 pages
Amendment
entry |2 pages
American Cyanamid principles
entry |1 pages
The American Institute of Architects (Aia)
entry |1 pages
American Petroleum Institute (Api)
entry |1 pages
American Society of Mechanical Engineers (Asme)
entry |1 pages
American Society for Testing and Materials (Astm)
entry |1 pages
Analogue addressable fire detector
entry |1 pages
Anchorage
entry |1 pages
Ancient lights
entry |1 pages
Ancient monument
entry |1 pages
Anechoic Chamber
entry |1 pages
Angle bead
entry |1 pages
Angle brace
entry |1 pages
Angle section
entry |1 pages
Anisotropic
entry |1 pages
Annealed glass
entry |1 pages
Annealing
entry |1 pages
Annexe
entry |1 pages
Anns v Merton London Borough Council
entry |1 pages
Anode
entry |1 pages
Anode corrosion
entry |1 pages
Anodising
entry |1 pages
Anticipatory breach
entry |2 pages
Antiquities
entry |1 pages
Anti-static flooring
entry |1 pages
Anton Piller order
entry |1 pages
Aod
entry |1 pages
Ap1000
entry |1 pages
Appeal
entry |1 pages
Appendix to Tender
entry |1 pages
Applicable law
entry |1 pages
Application
entry |1 pages
Application notice
entry |1 pages
Application for Payment
entry |1 pages
Apportionment
entry |1 pages
Approved Code of Practice (AcoP)
entry |1 pages
Approved for construction (Afc)
entry |2 pages
Approved Documents
entry |1 pages
Approved inspector
entry |1 pages
Approximate quantities
entry |1 pages
Aqueous
entry |1 pages
Arb
entry |1 pages
Arbitral Tribunal
entry |1 pages
Arbitration
entry |1 pages
Arbitration Act 1996
entry |1 pages
Arbitration Agreement
entry |3 pages
Arbitration clause
entry |1 pages
Arbitrator
entry |1 pages
Architect
entry |1 pages
Architect's/Engineer's Independence
entry |2 pages
Architect's Instruction (Ai)
entry |1 pages
Architect's Registration Board (Arb)
entry |1 pages
Architectural concrete
entry |1 pages
Architectural drawings
entry |1 pages
Architectural metalwork
entry |1 pages
Architectural sections
entry |1 pages
Architrave
entry |2 pages
Articles of agreement
entry |1 pages
Artificial obstruction
entry |1 pages
Artists, tradesmen or others engaged by the employer
entry |1 pages
Asbestos
entry |1 pages
As-built but-for analysis
entry |1 pages
As-built critical path
entry |1 pages
As-built drawings
entry |1 pages
As-built programme
entry |1 pages
Ascertain
entry |1 pages
Ashlar
entry |1 pages
As Low as Reasonably Practicable (Alarp)
entry |1 pages
Asphalt
entry |1 pages
Asphalt roofing
entry |1 pages
Aspirated detection system
entry |1 pages
As-planned impacted
entry |2 pages
As-planned programme
entry |1 pages
As-planned v as-built
entry |1 pages
Asr
entry |1 pages
Assessment of costs
entry |1 pages
Assignment
entry |1 pages
Associate General Contractors of America (Agc)
entry |1 pages
Association of Building Engineers (Abe)
entry |1 pages
Association of Consultant Architects (Aca)
entry |1 pages
Association of Consulting Engineers (Ace)
entry |1 pages
Assumption of responsibility
entry |1 pages
Astm International
entry |1 pages
Atrium
entry |1 pages
Attendance
entry |1 pages
Attenuator
entry |1 pages
Attestation
entry |1 pages
Attorney General of Belize v Belize Telecom Ltd
entry |1 pages
Audi alteram partem
entry |1 pages
Austenitic
entry |1 pages
Authorised guarantee agreement (Aga)
entry |1 pages
Authorised nominating body
entry |1 pages
Authorities
entry |1 pages
Authority
entry |1 pages
AutoCad
entry |1 pages
Autoclave
entry |2 pages
Autoclaved Aerated Concrete (Aac)
entry |1 pages
Avoided loss
entry |1 pages
Award
entry |1 pages
Award of tender
entry |1 pages
Back charge
entry |1 pages
Backfill, backfilling
entry |1 pages
Backflow
entry |1 pages
Background drawing
entry |1 pages
Backing ring
entry |1 pages
Backings
entry |1 pages
Back siphonage
entry |1 pages
Back-to-back contracts
entry |1 pages
Backward pass
entry |1 pages
Bad faith
entry |1 pages
Bae
entry |1 pages
Bafo
entry |1 pages
Baffle
entry |1 pages
Bagging, bag rendering
entry |1 pages
Bailey bridge
entry |1 pages
Balance of convenience
entry |1 pages
Ballast
entry |1 pages
Ballcock
entry |1 pages
Balustrade
entry |1 pages
Bank holiday
entry |1 pages
Bankruptcy
entry |1 pages
Bar chair
entry |1 pages
Bargeboard
entry |2 pages
Barograph
entry |1 pages
Barrel vault
entry |1 pages
Barrister
entry |1 pages
Bar schedule
entry |1 pages
Bas
entry |1 pages
Bascule
entry |1 pages
Baseball arbitration
entry |1 pages
Base course
entry |1 pages
Base date
entry |1 pages
Baseline adding impacts
entry |1 pages
Base rate
entry |1 pages
Batna
entry |1 pages
Bathroom pod
entry |1 pages
Batten
entry |2 pages
Battle of the forms
entry |1 pages
Bayonet Cap
entry |1 pages
Bba
entry |1 pages
Beam
entry |1 pages
Bearing capacity
entry |1 pages
Beckett's anchor
entry |1 pages
Becquerel (Bq)
entry |1 pages
Bedding
entry |1 pages
Bed joint
entry |1 pages
Benchmarking
entry |1 pages
Bending load
entry |1 pages
Bending moment
entry |1 pages
Bending schedule
entry |1 pages
Beneficiary
entry |1 pages
Berr
entry |1 pages
Bespoke contract
entry |1 pages
Bespoke system
entry |1 pages
Best endeavours
entry |1 pages
Best evidence
entry |1 pages
Betterment
entry |1 pages
Bias
entry |1 pages
Bid
entry |1 pages
Bid bond
entry |1 pages
Bid criteria
entry |1 pages
Biggin v Permanite Ltd
entry |1 pages
Billet
entry |1 pages
Bill of quantities (Bq) (BOQ)
entry |1 pages
Bill of variations
entry |1 pages
Bim
entry |1 pages
Bimetallic corrosion
entry |1 pages
Bim Maturity Levels
entry |1 pages
Bio-fouling and Corrosion Control
entry |1 pages
Biomass
entry |1 pages
Biomass gasification
entry |1 pages
Birmingham Wire Gauge (Bwg)
entry |1 pages
Bis
entry |1 pages
Bitumen
entry |1 pages
Bitumen felt
entry |1 pages
Bituminous paint
entry |1 pages
Black book
entry |1 pages
Black start
entry |1 pages
Blank panel
entry |1 pages
Blast cleaning (or Blasting)
entry |1 pages
Bleed Valve
entry |1 pages
Blinding
entry |1 pages
Blind nailing
entry |1 pages
Blistering
entry |1 pages
Block diagram
entry |1 pages
Blockmaker
entry |1 pages
Blockwork
entry |1 pages
Bloor Construction (Uk) Ltd v Bowmer and Kirkland (London) Ltd
entry |1 pages
Blow down
entry |1 pages
Blowhole, superficial void
entry |2 pages
The Blue Book
entry |1 pages
Blr
entry |1 pages
Blue pencil test
entry |1 pages
Bms
entry |1 pages
Bodkin
entry |1 pages
The Bolam test
entry |1 pages
Bona fide
entry |1 pages
Bond
entry |1 pages
Bonded screed
entry |1 pages
Bonding
entry |1 pages
Bonding agent
entry |1 pages
Bonding plaster
entry |1 pages
Bondsman
entry |1 pages
Bonus
entry |1 pages
Boom
entry |1 pages
Boot
entry |1 pages
Boot lintel
entry |1 pages
Bored piling
entry |1 pages
Bot
entry |1 pages
Bottom chord
entry |1 pages
Bottom plate
entry |1 pages
Box girder
entry |1 pages
Brace
entry |1 pages
Braced frame
entry |1 pages
Bre
entry |2 pages
Breach of contract
entry |1 pages
Breakwater
entry |1 pages
Breather membrane
entry |1 pages
Bre Environmental Assessment Method (BREEAM)
entry |1 pages
Brickbat
entry |1 pages
Brick slip (Brick Tiles, Brick Cladding)
entry |1 pages
Brick veneer
entry |1 pages
Bricklayer's scaffold (Putlog Scaffold)
entry |1 pages
Brief
entry |1 pages
Brise soleil
entry |2 pages
British Board of Agrément (Bba)
entry |1 pages
British Standards (Bs)
entry |1 pages
British Standards Institution (Bsi)
entry |1 pages
British thermal unit (Btu)
entry |1 pages
Broom-finish concrete
entry |1 pages
Brown-field site
entry |1 pages
Brushability
entry |1 pages
Brussels Convention
entry |1 pages
Bs
entry |1 pages
Bs 5606
entry |1 pages
Bsf
entry |1 pages
Bsi
entry |1 pages
Bsria
entry |1 pages
Btu, BthU
entry |1 pages
Buggeration
entry |1 pages
Buildability
entry |1 pages
Builder
entry |1 pages
Builder's line
entry |1 pages
Builder's level
entry |1 pages
Builder's Work in Connection (Bwic)
entry |1 pages
Building
entry |1 pages
Building Act 1984
entry |1 pages
Building Automation System (Bas)
entry |1 pages
Building contract
entry |1 pages
Building control
entry |1 pages
Building Control and Management System (Bcms)
entry |1 pages
Building control officer
entry |1 pages
Building employer
entry |1 pages
Building Information Modelling (Bim)
entry |1 pages
Building inspector
entry |1 pages
Building Law Reports (Blr)
entry |1 pages
Building management system (Bms)
entry |1 pages
Building Notice
entry |1 pages
Building owner
entry |1 pages
Building permit (Building Consent)
entry |1 pages
Building Regulations
entry |1 pages
Building Research Establishment (Bre)
entry |1 pages
Building Schools for the Future (Bsf)
entry |1 pages
Building survey
entry |1 pages
Building surveyor
entry |2 pages
Building Systems Integration (Bsi)
entry |1 pages
Building tolerances
entry |1 pages
Buildmark
entry |1 pages
Build, operate and transfer (Bot)
entry |1 pages
Build, own, operate and transfer (Boot)
entry |1 pages
Built-in
entry |1 pages
Built-up roofing
entry |1 pages
Bulkhead
entry |1 pages
Bullock Order
entry |1 pages
Bund
entry |1 pages
Bundle
entry |1 pages
Burden of proof
entry |1 pages
Burgundy Book
entry |1 pages
Burlap bags
entry |1 pages
Busbar
entry |1 pages
Business day
entry |1 pages
But-for test
entry |1 pages
Bwic
entry |1 pages
Byelaw
entry |1 pages
Ca
entry |1 pages
Cable tray
entry |1 pages
Cad
entry |1 pages
Caisson
entry |1 pages
Calcium silicate bricks
entry |1 pages
Calderbank Offer
entry |1 pages
California Bearing Ratio (Cbr)
entry |1 pages
Call-off contract
entry |1 pages
Call on a bond
entry |1 pages
Calorifier
entry |1 pages
Candela
entry |1 pages
Canons of construction
entry |1 pages
Cantilever
entry |1 pages
Capacity
entry |1 pages
Caparo Industries v Dickman
entry |1 pages
Capillary action (Capillarity)
entry |1 pages
Capillary break
entry |1 pages
Capping
entry |1 pages
Capping strip
entry |1 pages
Carcass, Carcassing
entry |1 pages
Car policy
entry |1 pages
Casement window
entry |1 pages
Case management conference (Cmc)
entry |1 pages
Cash discount
entry |1 pages
Castellated universal section
entry |1 pages
Casting
entry |1 pages
Casting-in
entry |1 pages
Cast stone
entry |1 pages
Category A fit-out
entry |1 pages
Category B fit-out
entry |1 pages
Cat ladder
entry |1 pages
Catwalk
entry |1 pages
Caucus
entry |1 pages
Caulking
entry |1 pages
Causa causans
entry |1 pages
Causa sine qua non
entry |1 pages
Causation
entry |2 pages
Cause of action
entry |1 pages
Caveat emptor
entry |1 pages
Cavity barrier
entry |1 pages
Cavity closer
entry |1 pages
Cavity flashing
entry |1 pages
Cavity inspection
entry |1 pages
Cavity insulation
entry |1 pages
Cavity tray
entry |1 pages
Cavity wall
entry |1 pages
Caws
entry |1 pages
Cbr
entry |1 pages
De
entry |2 pages
Cdm Coordinator
entry |1 pages
Ccm
entry |1 pages
Cdm Regulations
entry |1 pages
Cdp
entry |1 pages
Cedr
entry |1 pages
Ce mark CE
entry |1 pages
Ceiling diffuser
entry |1 pages
Ceiling hangers
entry |1 pages
Ceiling insulation
entry |1 pages
Ceiling joist (Roof Joist)
entry |1 pages
Cellular concrete
entry |1 pages
Cellular construction
entry |1 pages
Cement
entry |1 pages
Cement content
entry |1 pages
Cement screed
entry |1 pages
Cen
entry |1 pages
Centre for Effective Dispute Resolution (Cedr)
entry |1 pages
Centre-to-centre
entry |1 pages
Centrifugal fan
entry |1 pages
Certainty
entry |1 pages
Certificate
entry |1 pages
Certificate of lawfulness
entry |1 pages
Certificate of making good defects
entry |1 pages
Certificate of non-completion
entry |1 pages
Certificate of Practical Completion
entry |1 pages
Certificate of service
entry |1 pages
Certifier
entry |1 pages
Certiorari
entry |1 pages
Certum est quod certum redid potest
entry |1 pages
Cessm
entry |1 pages
Cfa
entry |1 pages
C & G
entry |1 pages
Cgct
entry |1 pages
Chair
entry |1 pages
Chair rail
entry |1 pages
Chamfer
entry |1 pages
Champerty
entry |1 pages
Change
entry |1 pages
Chancery Division
entry |1 pages
Changed conditions clause
entry |1 pages
Change of use
entry |1 pages
Change order
entry |1 pages
Channel Tunnel Group v Balfour Beatty
entry |1 pages
Charging Order
entry |1 pages
Chartered builder (Mciob, FCIOB)
entry |1 pages
Chartered engineer
entry |1 pages
Chartered Institute of Arbitrators (Ciarb)
entry |1 pages
Chartered Institute of Building (Ciob)
entry |1 pages
Chartered Institute of Building Services Engineers (Cibse)
entry |1 pages
Chartered surveyor
entry |1 pages
Chase
entry |1 pages
Chatham House Rules
entry |1 pages
Chequerplate
entry |1 pages
Chiller and basics of air conditioning
entry |1 pages
Chimney breast
entry |1 pages
Chinese wall
entry |1 pages
Chippy
entry |1 pages
Choice of law
entry |1 pages
Chord
entry |1 pages
Chose in action
entry |1 pages
Chromating
entry |1 pages
Ciarb
entry |1 pages
Cibse
entry |1 pages
Cill
entry |1 pages
Cimar
entry |1 pages
Ciob
entry |1 pages
Cis
entry |1 pages
Citation
entry |1 pages
City and Guilds of London Institute (C&G)
entry |1 pages
Civil code
entry |1 pages
Civil commotion
entry |1 pages
Civil engineering
entry |1 pages
Civil law
entry |1 pages
Civil Liability (Contribution) Act 1978
entry |1 pages
Civil Procedure Rules (Cpr)
entry |1 pages
Cladding, cladding panel
entry |1 pages
Claim
entry |2 pages
Claim form
entry |1 pages
Claimant
entry |1 pages
Claims consultant
entry |1 pages
Claims made policy
entry |1 pages
Clapper bridge
entry |1 pages
Clashing
entry |1 pages
Class O
entry |1 pages
Clause 22 perils
entry |1 pages
Cleanout of wall cavities (when forbidden by method of construction)
entry |1 pages
Clear timber
entry |1 pages
Clearing and grubbing (C&G)
entry |1 pages
Clearing site
entry |1 pages
Clerestory (or clearstory)
entry |1 pages
Clerical mistake or error
entry |1 pages
Clerk of Works (Cow)
entry |1 pages
Client
entry |1 pages
Client's representative
entry |1 pages
Climbing crane
entry |1 pages
Climbing formwork (slipform)
entry |1 pages
Clinker
entry |1 pages
Clinker block (Breeze block)
entry |1 pages
Closer
entry |1 pages
Closing of excavations
entry |1 pages
Closure piece
entry |1 pages
Cmc
entry |1 pages
Cmu
entry |1 pages
Coarse aggregate
entry |1 pages
Cob
entry |1 pages
Cob
entry |1 pages
Cobie
entry |1 pages
Coco
entry |1 pages
Code of practice
entry |1 pages
Coffer
entry |1 pages
Cofferdam
entry |1 pages
Coil heating
entry |1 pages
Cold bridging
entry |1 pages
Cold roof
entry |1 pages
Collapsed as-built
entry |1 pages
Collapsible form
entry |1 pages
Collar
entry |1 pages
Collateral warranty
entry |1 pages
Collusive tendering
entry |1 pages
Colonnade
entry |1 pages
Column
entry |1 pages
Column form (Column Formwork)
entry |1 pages
Column starter
entry |1 pages
Combination boiler (Combi boiler)
entry |1 pages
Combined extract and input
entry |1 pages
Combined system (of drainage)
entry |1 pages
Combustible
entry |1 pages
Comfort index
entry |1 pages
Commencement date
entry |1 pages
Commercial Court
entry |1 pages
Commissioning
entry |1 pages
Common arrangement
entry |1 pages
Common bond (Stretcher bond)
entry |1 pages
Common brickwork
entry |1 pages
Common Carbon Metric (Ccm)
entry |1 pages
Common Data Environment (Cde)
entry |1 pages
Common law
entry |1 pages
Common mistake
entry |1 pages
Communications installation
entry |1 pages
Compaction of concrete
entry |1 pages
Companies Court
entry |1 pages
Company Voluntary Arrangement (Cva)
entry |1 pages
Comparable
entry |1 pages
Compensation event
entry |1 pages
Competitive Dialogue Procedure
entry |1 pages
Competitive tendering
entry |1 pages
Complete agreement clause
entry |1 pages
Completion
entry |1 pages
Completion date
entry |1 pages
Composite construction
entry |1 pages
Composite panel
entry |1 pages
Compound beam
entry |1 pages
Compound interest
entry |1 pages
Compression
entry |1 pages
Compromise
entry |1 pages
Compulsory winding up
entry |1 pages
Concession agreement
entry |1 pages
Conciliation
entry |1 pages
Conciliator
entry |1 pages
Conclusive evidence
entry |1 pages
Concrete
entry |1 pages
Concrete cancer
entry |1 pages
Concrete cover
entry |1 pages
Concurrent delay
entry |1 pages
Condition
entry |1 pages
Conditional fee agreement
entry |1 pages
Condition precedent
entry |1 pages
Condition subsequent
entry |1 pages
Conductance
entry |1 pages
Conductivity
entry |1 pages
Confirmation of verbal instruction (Cvi)
entry |1 pages
Conflict of laws
entry |1 pages
Con. L.R.
entry |1 pages
Conquer v Boot
entry |1 pages
Consent award
entry |1 pages
Consent order
entry |1 pages
Consequential loss
entry |1 pages
Conservation area
entry |1 pages
Consideration
entry |1 pages
Consistency
entry |1 pages
Consolidation of actions
entry |1 pages
Consortium
entry |1 pages
Const. L.J.
entry |1 pages
Constructing excellence contract
entry |1 pages
Construction Act
entry |1 pages
Construction contract
entry |2 pages
Construction (Design and Management) Regulations 2007
entry |1 pages
Construction Industry Law Letter (Cill)
entry |1 pages
Construction Industry Model Arbitration Rules (Cimar)
entry |1 pages
Construction Industry Scheme (Cis)
entry |1 pages
Construction Law Journal
entry |1 pages
Construction Law Reports
entry |1 pages
Construction management
entry |1 pages
Construction manager
entry |1 pages
Construction operations
entry |1 pages
Construction Operations Building Information Exchange (Cobie)
entry |1 pages
Construction professional
entry |1 pages
Construction Project Information Committee (Cpic)
entry |1 pages
Constructive acceleration
entry |1 pages
Constructive change order
entry |1 pages
Consultancy agreement
entry |1 pages
Consultant
entry |1 pages
Contaminated land
entry |1 pages
Contestable work
entry |1 pages
Contingency period
entry |1 pages
Contingency sum
entry |1 pages
Continuous run concreting
entry |1 pages
Contra charge
entry |1 pages
Contra item
entry |1 pages
Contra proferentem
entry |1 pages
Contract
entry |1 pages
Contract administrator
entry |1 pages
Contract bills
entry |1 pages
Contract data
entry |1 pages
Contract documents
entry |1 pages
Contract drawings
entry |1 pages
Contracting authority
entry |1 pages
Contract Notice
entry |1 pages
Contracts (Rights of Third Parties) Act 1999
entry |1 pages
Contract sum
entry |1 pages
Contract under hand
entry |1 pages
Contract under seal
entry |1 pages
Contractor
entry |1 pages
Contractor Designed Portion (Cdp)
entry |1 pages
Contractor Owned Contractor Operated
entry |1 pages
Contractor's All Risks (Car) policy
entry |1 pages
Contractor's Proposals (Cps)
entry |1 pages
Contractor's representative
entry |1 pages
Contractor's share percentages and share ranges
entry |1 pages
Contributory negligence
entry |1 pages
Convenience clause
entry |1 pages
Conversion
entry |1 pages
Conveyancing
entry |1 pages
Cooling tower
entry |1 pages
The Co-operative Insurance Society Ltd v Henry Boot Scotland Ltd
entry |1 pages
Copy-cat arbitration
entry |1 pages
Copyright
entry |1 pages
Corbel
entry |1 pages
Core
entry |1 pages
Corgi
entry |1 pages
Cornhill Insurance plc v Improvement Services Ltd
entry |1 pages
Corporate veil
entry |1 pages
Corrosion
entry |1 pages
Cor-TEN or Corten steel
entry |1 pages
Cost
entry |1 pages
Cost adjustment clause
entry |1 pages
Cost breakdown
entry |1 pages
Cost capping order
entry |1 pages
Cost contract
entry |1 pages
Cost controller
entry |1 pages
Cost engineer
entry |1 pages
Cost estimate
entry |1 pages
Cost plan
entry |1 pages
Cost-plus
entry |1 pages
Cost-plus-fixed-fee contract
entry |1 pages
Cost-plus-percentage contract
entry |1 pages
Cost reimbursable contract
entry |1 pages
Costs
entry |1 pages
Costs in the case
entry |1 pages
Costs on the indemnity basis
entry |1 pages
Costs on the standard basis
entry |1 pages
Costs reserved
entry |1 pages
Costs thrown away
entry |1 pages
Counterclaim
entry |1 pages
Counter-floor
entry |1 pages
Counter offer
entry |1 pages
Counterpart
entry |1 pages
Countersunk fixing
entry |1 pages
County court
entry |1 pages
Couple roof
entry |1 pages
Coupling, coupler
entry |1 pages
Course
entry |1 pages
Course of dealing
entry |1 pages
Court of Appeal
entry |1 pages
Court of first instance
entry |1 pages
Court of Session
entry |1 pages
Court settlement process
entry |1 pages
Cove lighting
entry |1 pages
Cover
entry |1 pages
Cover pricing
entry |1 pages
Cpa Conditions
entry |1 pages
Cps
entry |1 pages
Cpic
entry |1 pages
Cpm
entry |1 pages
Cpr
entry |1 pages
Creep
entry |1 pages
Critical activity
entry |1 pages
Critical delay
entry |1 pages
Critical path
entry |1 pages
Critical path analysis/method (Cpm)
entry |1 pages
Cross claim
entry |1 pages
Cross-examination
entry |1 pages
Cross-hatching
entry |1 pages
Crown course
entry |1 pages
Crushed aggregate
entry |1 pages
Cube test
entry |1 pages
Culpable delay
entry |1 pages
Cumulative impact claim
entry |2 pages
Curial law
entry |1 pages
Curing
entry |1 pages
Curing agent
entry |1 pages
Curing membrane
entry |1 pages
Curtain wall
entry |1 pages
Custom and usage
entry |1 pages
Cut and fill
entry |1 pages
Cva
entry |1 pages
C-value
entry |1 pages
Cvi
entry |1 pages
Cyclical movement
entry |1 pages
Dabs
entry |1 pages
Dado
entry |1 pages
Dado rail
entry |1 pages
Dado trunking
entry |1 pages
Daily rates
entry |1 pages
Damage limitation clause
entry |1 pages
Damages
entry |1 pages
Damp-proof course (dpc)
entry |1 pages
Damp-proof course brick
entry |1 pages
Damp-proof membrane (Dpm)
entry |1 pages
Damp-proofing
entry |1 pages
Data drop
entry |1 pages
Data Logger
entry |1 pages
Data protection
entry |1 pages
Date for completion
entry |1 pages
Date of possession
entry |1 pages
Daubert Guidelines
entry |1 pages
Day
entry |1 pages
Day joint
entry |1 pages
Dayworks
entry |1 pages
Db
entry |1 pages
Dba
entry |1 pages
Dbo
entry |1 pages
Death
entry |1 pages
Death-watch beetle
entry |1 pages
De bene esse
entry |1 pages
Debenture
entry |1 pages
Debriefing
entry |1 pages
Debt
entry |1 pages
Decc
entry |1 pages
Deceit
entry |2 pages
Decibel (dB)
entry |1 pages
Decision
entry |1 pages
Decking
entry |1 pages
Declaration
entry |1 pages
Decommissioning
entry |1 pages
Decontamination
entry |1 pages
Decrement delay
entry |1 pages
Deduction
entry |1 pages
Deed
entry |1 pages
Deep-plan building
entry |1 pages
De facto
entry |1 pages
Default
entry |2 pages
Default notice or Default payment notice
entry |1 pages
Defect
entry |1 pages
Defect action period
entry |1 pages
Defective Premises Act (Dpa)
entry |1 pages
Defects certificate
entry |1 pages
Defects liability period (Dlp)
entry |1 pages
Defence
entry |1 pages
Defence and counterclaim
entry |1 pages
Defence of tender before claim
entry |1 pages
Defence to counterclaim
entry |1 pages
Defendant
entry |1 pages
Defender
entry |1 pages
Defined cost
entry |1 pages
Delay
entry |1 pages
Delay analysis
entry |1 pages
Delay and disruption claim
entry |1 pages
Delay damages
entry |1 pages
Delegated legislation
entry |1 pages
Delegation of authority
entry |1 pages
Delegatus non potest delegare
entry |1 pages
Deleterious materials
entry |2 pages
Deletion
entry |1 pages
Deliverable
entry |1 pages
Delivery up
entry |1 pages
De minimis
entry |1 pages
De minimis non curat lex
entry |1 pages
Demolition
entry |1 pages
Demountable partition
entry |1 pages
Department for Business Enterprise and Regulatory Reform (Berr)
entry |1 pages
Department for Business Innovation and Skills (Bis)
entry |1 pages
Department for Energy and Climate Change (Decc)
entry |1 pages
Department of Trade and Industry (Dti)
entry |1 pages
Deposition
entry |1 pages
Derogation
entry |1 pages
Derogatory treatment
entry |1 pages
Design
entry |1 pages
Design and access statement
entry |1 pages
Design and build contract
entry |1 pages
Design and build procurement
entry |1 pages
Design build finance manage (Dbfm)
entry |1 pages
Design build finance operate (Dbfo)
entry |1 pages
Design build operate (Dbo)
entry |1 pages
Design life
entry |1 pages
Designer
entry |1 pages
Detail
entry |1 pages
Detail drawings
entry |1 pages
Determination
entry |1 pages
Determination of costs
entry |1 pages
Developer
entry |1 pages
Dhw
entry |2 pages
Diaphragm wall
entry |1 pages
Dickinson v Dodds
entry |1 pages
Differential settlement
entry |1 pages
Digger
entry |1 pages
Dilapidation
entry |1 pages
Diligence
entry |1 pages
Dimension
entry |1 pages
Diminishing courses
entry |1 pages
Diminution in value
entry |1 pages
Direct loss and/or expense
entry |1 pages
Direct payment
entry |1 pages
Direct supply
entry |1 pages
Directions
entry |1 pages
Disabled facilities
entry |1 pages
Discharge
entry |1 pages
Discharge valve, regulating valve
entry |1 pages
Disclaimer
entry |1 pages
Disclosure
entry |1 pages
Discontinuance
entry |1 pages
Discount
entry |1 pages
Discovery
entry |1 pages
Discretion
entry |2 pages
Dispute
entry |1 pages
Dispute Board (Db) or Dispute Adjudication Board (DAB)
entry |1 pages
Dispute escalation clause
entry |1 pages
Dispute resolution board (Drb)
entry |1 pages
Disruption
entry |1 pages
Distress and Inconvenience
entry |1 pages
District surveyor
entry |1 pages
Documents
entry |1 pages
DoE
entry |1 pages
Dog-leg stair
entry |1 pages
Domestic hot water (Dhw)
entry |1 pages
Domestic subcontractor
entry |1 pages
Dominant cause
entry |1 pages
Door schedule
entry |1 pages
Dormer head
entry |1 pages
Dormer window
entry |1 pages
Dot and dab fixing
entry |1 pages
Dots and screeds
entry |1 pages
Double curvature
entry |1 pages
Double-decker lift
entry |1 pages
Double glazing
entry |1 pages
Double-leaf separating wall
entry |1 pages
Double-lock welt
entry |1 pages
Dovetail
entry |1 pages
Dowel bar
entry |1 pages
Downlighter
entry |1 pages
Downpipe
entry |1 pages
Downstand beam
entry |1 pages
Dpc
entry |1 pages
Dpm
entry |1 pages
Drain pipe
entry |1 pages
Drained and ventilated joint
entry |1 pages
Drained cavity
entry |1 pages
Draw cable
entry |1 pages
Drawing register
entry |1 pages
Drawing scale
entry |1 pages
Drb
entry |1 pages
Drbf
entry |1 pages
Dress
entry |1 pages
Dressed dimension
entry |1 pages
Dressings
entry |1 pages
D-ring
entry |1 pages
Drip
entry |1 pages
Drip edge
entry |1 pages
Drop apron
entry |1 pages
Drop ceiling
entry |1 pages
Dry construction
entry |1 pages
Dry joint
entry |1 pages
Dry lining
entry |1 pages
Dry masonry
entry |1 pages
Dry partition
entry |1 pages
Dry riser
entry |1 pages
Dry rot
entry |1 pages
Dry sprinkler
entry |1 pages
Dry trades
entry |1 pages
Dry wall
entry |1 pages
Drying-out
entry |1 pages
Dry-pack mortar
entry |1 pages
Dti
entry |1 pages
Dubbing-out
entry |1 pages
Dubitante
entry |2 pages
Duct air duct:
entry |1 pages
Ductwork
entry |1 pages
Due diligence
entry |1 pages
Duress
entry |1 pages
Duty of care
entry |1 pages
Dwang
entry |1 pages
Dwarf wall
entry |1 pages
Dwelling
entry |1 pages
Dynamic purchasing system
entry |1 pages
Early Neutral Evaluation (Ene)
entry |1 pages
Early warning
entry |1 pages
Early Warning Notice (Ewn)
entry |1 pages
Earned value
entry |1 pages
Earth electrode
entry |1 pages
Earth stake
entry |1 pages
Earth termination
entry |1 pages
Earthing
entry |1 pages
Easement
entry |1 pages
East Ham Corporation v Sunley (Bernard) & Son Ltd
entry |1 pages
Eaves
entry |1 pages
Eaves gutter
entry |1 pages
Eaves soffit
entry |1 pages
Eaves vent
entry |1 pages
Ecj
entry |1 pages
Economic duress
entry |1 pages
Economic Loss
entry |1 pages
Edge beam
entry |1 pages
Efficient breach
entry |1 pages
Efflorescence
entry |1 pages
Egan Report
entry |1 pages
Eggshell
entry |1 pages
Eggshell skull rule
entry |1 pages
Eia
entry |1 pages
Eichleay formula
entry |1 pages
Ei incumbit probatio qui dicit, non qui negat
entry |1 pages
Ej
entry |1 pages
Ejusdem generis
entry |1 pages
Elastic design
entry |1 pages
Elbow, knee
entry |3 pages
Election
entry |1 pages
Electrical riser
entry |1 pages
Electrical services
entry |1 pages
Electrostatic discharge (Esd)
entry |1 pages
Elemental bills of quantities
entry |1 pages
Elephant
entry |1 pages
Elephant's feet
entry |1 pages
Elevation
entry |1 pages
Elps
entry |2 pages
Emden formula
entry |1 pages
Emergency power systems (Eps)
entry |1 pages
Employer
entry |1 pages
Employer's Agent
entry |1 pages
Employer's Representative
entry |1 pages
Employer's requirements (Ers)
entry |1 pages
Emulsion paint
entry |1 pages
Enabling works
entry |1 pages
Enamel paint
entry |1 pages
Encasement
entry |1 pages
Enclosed stage
entry |1 pages
End bearing length
entry |1 pages
End grain
entry |1 pages
End joint
entry |1 pages
Ene
entry |2 pages
Enforcement
entry |1 pages
Enforcement notice
entry |1 pages
Engineer
entry |1 pages
Engineering brick
entry |1 pages
Engineering Council
entry |1 pages
Engineering, Procurement, Construction (Epc)
entry |1 pages
English bond
entry |2 pages
Entire agreement clause
entry |1 pages
Entire completion
entry |1 pages
Entire contract
entry |1 pages
Entresol
entry |1 pages
Envelope
entry |1 pages
Environment Agency (Ea)
entry |1 pages
Environmental impact assessment (Eia)
entry |1 pages
E&Oe
entry |1 pages
Eot
entry |1 pages
Epc
entry |1 pages
E-procurement
entry |1 pages
Epoxy mortar
entry |1 pages
Epoxy paint
entry |1 pages
Eps
entry |1 pages
Equitable set-off
entry |1 pages
Equity
entry |1 pages
Equity clause
entry |1 pages
Equivalent temperature
entry |1 pages
Erection All Risks
entry |1 pages
Error
entry |1 pages
Ers
entry |1 pages
Escrow
entry |1 pages
Escutcheon
entry |1 pages
Esd
entry |1 pages
Estimate
entry |1 pages
Estoppel
entry |1 pages
Ethylene tetra fluoroethylene (Etfe)
entry |1 pages
Eurocode (Ec)
entry |1 pages
European Commission
entry |1 pages
European Committee for Standardisation (Cen)
entry |1 pages
European Standard, Euronorm (En)
entry |1 pages
Eurotunnel v Tml
entry |1 pages
Evaluative mediation
entry |1 pages
The Event Safety Guide (“The Purple Guide”)
entry |1 pages
Evidence
entry |1 pages
Evidence-in-chief
entry |1 pages
Evoh
entry |1 pages
Ewca
entry |1 pages
Ewhc
entry |1 pages
Ewn
entry |1 pages
Ex aequo et bono
entry |1 pages
Ex gratia
entry |1 pages
Ex officio
entry |1 pages
Ex parte
entry |1 pages
Examination-in-Chief
entry |1 pages
Excavation
entry |1 pages
Excepted Risk
entry |1 pages
Exceptionally adverse weather conditions
entry |1 pages
Excess
entry |1 pages
Excess spoil
entry |2 pages
Exclusion clause
entry |1 pages
Execution against goods
entry |1 pages
Executory contract
entry |1 pages
Exemplary damages
entry |1 pages
Exemption clause
entry |1 pages
Exhibit
entry |1 pages
Expanded polystyrene (Eps)
entry |1 pages
Expanded Pvc
entry |1 pages
Expansion joint (Ej)
entry |1 pages
Expedition
entry |1 pages
Expense
entry |1 pages
Expert
entry |1 pages
Expert determination
entry |1 pages
Expert witness
entry |1 pages
Experts' joint statement
entry |1 pages
Experts' meetings
entry |2 pages
Experts protocol
entry |1 pages
Experts' reports
entry |1 pages
Exposed aggregate finish
entry |1 pages
Expressio eorum quae tacite instunt nihil operator
entry |1 pages
Expressio unius est exclusio alterius
entry |1 pages
Express terms
entry |1 pages
Extended preliminaries
entry |1 pages
Extended price
entry |2 pages
Extension of time (Eot)
entry |1 pages
Exterior plywood
entry |1 pages
External insulation
entry |1 pages
External leaf
entry |1 pages
External wall
entry |1 pages
External works
entry |1 pages
Extra contractual
entry |1 pages
Extra over
entry |1 pages
Extra work, extras
entry |1 pages
Extractor fan
entry |1 pages
Extrinsic evidence
entry |1 pages
Extruded brick
entry |1 pages
Extruded section
entry |1 pages
Eyebar
entry |1 pages
Fabric
entry |1 pages
Fabrication
entry |1 pages
Fabrication drawings
entry |1 pages
Fabric reinforcement
entry |1 pages
Façade
entry |1 pages
Façade retention
entry |1 pages
Face bedding
entry |1 pages
Face mark
entry |1 pages
Facework
entry |1 pages
Facilitative mediation
entry |1 pages
Facilities management (Fm)
entry |1 pages
Facility
entry |1 pages
Facing brick
entry |1 pages
Fact
entry |1 pages
Factor of safety (Fs)
entry |1 pages
Factory Acceptance Test (Fat)
entry |1 pages
Fact sensitive
entry |1 pages
Factual matrix
entry |1 pages
Failure to complete
entry |1 pages
Fair-face(d) concrete
entry |1 pages
Fair valuation
entry |1 pages
Fall
entry |1 pages
Fall pipe
entry |1 pages
Falsa demonstratio non nocet cum de corpore constat
entry |1 pages
False attribution
entry |1 pages
False ceiling
entry |1 pages
Fan coil unit
entry |1 pages
Fascia, fascia board
entry |1 pages
Fast track
entry |1 pages
Fat
entry |1 pages
Feasibility study
entry |1 pages
Federated models
entry |1 pages
Federation Internationale des Ingenieurs-Conseils (Fidic)
entry |1 pages
Federation of Master Builders (Fmb)
entry |1 pages
Feed
entry |1 pages
Feed In Tariff (Fit)
entry |1 pages
Feedback loop
entry |1 pages
Feltwork
entry |1 pages
Fenestration
entry |1 pages
Ferroconcrete
entry |1 pages
Ferrule
entry |1 pages
Ffe
entry |1 pages
Ffl
entry |1 pages
Fibreboard
entry |1 pages
Fibre cement board
entry |1 pages
Fibreglass
entry |1 pages
Fibre-reinforced concrete (Frc)
entry |2 pages
Fibre saturation point
entry |1 pages
Fibrous plaster
entry |1 pages
Fidic
entry |1 pages
Fidic forms of contract
entry |1 pages
Fiduciary interest
entry |1 pages
Fieri facias
entry |1 pages
Fi fa
entry |1 pages
Final account
entry |2 pages
Final certificate
entry |1 pages
Final completion
entry |1 pages
Final statement
entry |1 pages
Finance charges
entry |1 pages
Fine aggregate
entry |1 pages
Finger plate
entry |1 pages
Finished floor level (Ffl)
entry |1 pages
Finishing coat
entry |1 pages
Finish-to-finish relationship
entry |1 pages
Finish-to-start relationship
entry |1 pages
Fire
entry |1 pages
Fire damper
entry |1 pages
Fire protection
entry |1 pages
Fire stopping
entry |1 pages
Firm price
entry |1 pages
Firring piece
entry |1 pages
First fix or fixing
entry |1 pages
Fishing expedition
entry |2 pages
Fitness for habitation
entry |1 pages
Fitness for purpose
entry |1 pages
Fixed charge
entry |1 pages
Fixed light
entry |1 pages
Fixed overheads
entry |1 pages
Fixed price
entry |1 pages
Fixing strip
entry |1 pages
Flange
entry |1 pages
Flank wall
entry |1 pages
Flashing
entry |1 pages
Flat roof
entry |1 pages
Flaunching
entry |1 pages
Flemish Bond
entry |1 pages
Fletton
entry |2 pages
Float
entry |1 pages
Floating charge
entry |1 pages
Floating floor
entry |1 pages
Floor box
entry |1 pages
Fluctuations clause
entry |1 pages
Flush
entry |1 pages
Foia
entry |1 pages
Footing
entry |1 pages
Forbearance
entry |2 pages
Force majeure
entry |1 pages
Foreseeability
entry |1 pages
Forfeiture clause
entry |1 pages
Formalities
entry |1 pages
Form of tender
entry |1 pages
Formula price adjustment
entry |1 pages
Formwork
entry |1 pages
Forum shopping
entry |1 pages
Fossils
entry |1 pages
Foundation
entry |1 pages
Fragnets
entry |1 pages
Framework Agreement
entry |1 pages
Fraudulent Misrepresentation
entry |1 pages
Freeboard bridge
entry |1 pages
Free float
entry |1 pages
Freezing injunction
entry |1 pages
Frieze
entry |1 pages
Frog
entry |1 pages
Front End Engineering Design (Feed)
entry |1 pages
Front loading
entry |1 pages
Frustration
entry |1 pages
Full planning permission
entry |1 pages
Functus officio
entry |2 pages
Fundamental breach
entry |1 pages
Furring strip
entry |1 pages
Ga
entry |1 pages
Gabion
entry |1 pages
Gable
entry |1 pages
Gable board
entry |1 pages
Gable post
entry |1 pages
Gable roof
entry |1 pages
Gable springer
entry |1 pages
Gable wall
entry |1 pages
Gaffer
entry |1 pages
Galvanising
entry |1 pages
Gang
entry |1 pages
Gang form
entry |1 pages
Gantt chart
entry |1 pages
Garnishee proceedings
entry |1 pages
Gas concrete
entry |1 pages
Gas Safe Register
entry |1 pages
Gauged mortar
entry |1 pages
Gbg
entry |1 pages
Gc/Works
entry |1 pages
Gea
entry |1 pages
General conditions
entry |1 pages
General contractor
entry |1 pages
General damages
entry |1 pages
General Permitted Development Order (Gpdo)
entry |1 pages
Georgian wired glass
entry |1 pages
Geotechnical report
entry |1 pages
Ghg
entry |1 pages
Girder
entry |1 pages
Girder truss
entry |1 pages
Glassfibre-reinforced gypsum (Grg)
entry |1 pages
Glassfibre-reinforced plastic, fibreglass (Grp)
entry |1 pages
Glass(fibre)-reinforced concrete (Grc)
entry |1 pages
Glazing
entry |1 pages
Glazing bead
entry |1 pages
Glazing fillet
entry |1 pages
Global claim
entry |1 pages
Glued-laminated timber
entry |1 pages
Glulam
entry |1 pages
Gmp
entry |1 pages
Goco
entry |1 pages
Going
entry |1 pages
Gold Book Fidic
entry |1 pages
Golden rule
entry |1 pages
Good Building Guides (Gbg)
entry |1 pages
Good faith
entry |1 pages
Good Practice in Selection of Construction Materials
entry |1 pages
Good and workmanlike manner
entry |1 pages
Goods and materials
entry |1 pages
Governing law
entry |1 pages
Government owned, contractor operated (Goco)
entry |1 pages
Gpdo
entry |1 pages
Grade
entry |1 pages
Grc
entry |1 pages
Grandfather clause
entry |1 pages
Grand master key
entry |1 pages
Granular fill
entry |1 pages
Graphic work
entry |1 pages
Grass concrete
entry |1 pages
Green Book
entry |1 pages
Green concrete
entry |1 pages
Greenfield site
entry |1 pages
Green form
entry |1 pages
Green Guide
entry |1 pages
Greenhouse effect
entry |1 pages
Green timber
entry |1 pages
Grid
entry |1 pages
Grid line
entry |1 pages
Gripper strip
entry |1 pages
Groin vault
entry |1 pages
Gross external area (Gea)
entry |1 pages
Gross features
entry |1 pages
Gross floor area
entry |1 pages
Ground conditions
entry |2 pages
Ground investigation
entry |1 pages
Ground level
entry |1 pages
Ground plate
entry |1 pages
Ground sill
entry |1 pages
Ground slab
entry |1 pages
Groundwork
entry |1 pages
Grout, grouting
entry |1 pages
Groyne
entry |1 pages
Grp
entry |1 pages
Guarantee (1)
entry |1 pages
Guaranteed costs contract
entry |2 pages
Guaranteed maximum price (Gmp)
entry |1 pages
Guidance notes
entry |1 pages
Guide rails
entry |1 pages
Guide to Safety at Sports Grounds (“Green Guide”)
entry |1 pages
Gully, gulley
entry |1 pages
Gunmetal
entry |1 pages
Gusset plate or piece
entry |1 pages
Gypsum
entry |1 pages
Gypsum plasterboard
entry |1 pages
Gypsum wallboard
entry |1 pages
Ha
entry |1 pages
Ha
entry |1 pages
Ha-ha
entry |1 pages
Habitation
entry |1 pages
Hadley v Baxendale
entry |1 pages
Half landing
entry |1 pages
Half-hour fire door
entry |1 pages
Halsey Guidelines
entry |1 pages
Hammerhead crane
entry |1 pages
Hancock v Brazier terms
entry |1 pages
Handover, handing over
entry |1 pages
Hangar
entry |1 pages
Hanger
entry |1 pages
Hansard
entry |1 pages
Hard landscaping
entry |1 pages
Hardboard
entry |1 pages
Hardcore
entry |1 pages
Hardwood
entry |1 pages
Haunching
entry |1 pages
Hazid
entry |1 pages
Hazop
entry |1 pages
Head contract
entry |2 pages
Head office overheads
entry |1 pages
Header
entry |1 pages
Heading bond
entry |1 pages
Heading course
entry |1 pages
Headroom
entry |1 pages
Health and Safety at Work, etc. Act 1974
entry |1 pages
Health and Safety Executive (Hse)
entry |1 pages
Health and safety file
entry |1 pages
Health and safety plan
entry |1 pages
Hearsay
entry |1 pages
Heat detector
entry |1 pages
Heat exchanger
entry |1 pages
Heating coil
entry |1 pages
Heat loss
entry |1 pages
Heat of hydration
entry |1 pages
Heat pump
entry |1 pages
Heat recovery/Mvrh
entry |1 pages
Heat-transmission value
entry |1 pages
Hedley Byrne duty
entry |1 pages
Heel
entry |1 pages
Helibar ties
entry |1 pages
Henry Boot Construction v Alstom Combined Cycles Ltd
entry |1 pages
Heras fencing
entry |1 pages
Herring-bone strutting
entry |1 pages
H-frame tower
entry |1 pages
Hgcra
entry |1 pages
Hickman & Co v Roberts
entry |2 pages
High Court
entry |1 pages
High-pressure hot water (Hphw)
entry |1 pages
Highways Agency
entry |1 pages
Hindrance
entry |1 pages
Hip rafter
entry |1 pages
Hip truss
entry |1 pages
Hip, hip ridge
entry |1 pages
Hip(ped) roof
entry |1 pages
Hit and miss
entry |1 pages
Hmrc
entry |1 pages
Hoarding
entry |1 pages
Hoist
entry |1 pages
Holdback
entry |1 pages
Holding-down bolt
entry |1 pages
Hollow block
entry |1 pages
Hollow brick
entry |1 pages
Hollow tile
entry |1 pages
Hollow wall
entry |1 pages
Hollow-core door
entry |1 pages
Honeycomb bond
entry |1 pages
Honeycomb core door
entry |1 pages
Honeycomb fire damper
entry |1 pages
Honeycombing
entry |1 pages
Hopper
entry |2 pages
Hostilities
entry |1 pages
Hot tubbing
entry |1 pages
Hot work
entry |1 pages
House of Lords
entry |1 pages
House wrapping
entry |1 pages
Housing Association
entry |2 pages
Housing Corporation
entry |1 pages
Housing Grants, Construction and Regeneration Act (Hgcra)
entry |1 pages
Hphw
entry |1 pages
Hrsg
entry |1 pages
Hse
entry |1 pages
Hudson formula
entry |1 pages
Hudson or Hudson's Building and Engineering Contracts
entry |2 pages
Human Rights Act
entry |1 pages
Hurry-up notice
entry |1 pages
Hvac
entry |1 pages
Hvotl
entry |1 pages
Hydration
entry |1 pages
Hydraulic lift
entry |1 pages
Hygroscopic salts
entry |1 pages
Hypalon (cspe)
entry |1 pages
Hyperbolic paraboloid
entry |1 pages
Ibc
entry |1 pages
iBim
entry |1 pages
Icc
entry |1 pages
Icd
entry |1 pages
Ice
entry |1 pages
Ice 6
entry |1 pages
Ice 7
entry |1 pages
Ice conditions
entry |1 pages
IchemE
entry |1 pages
IchemE Burgundy Book
entry |1 pages
IchemE Green Book
entry |1 pages
IchemE Red Book
entry |1 pages
Iee
entry |1 pages
Iee wiring regulations
entry |1 pages
Ifc
entry |1 pages
Ifc 84
entry |1 pages
If contract
entry |1 pages
Ikarian Reefer
entry |2 pages
Illegality
entry |1 pages
Impacted as-planned
entry |1 pages
Impartiality
entry |1 pages
Implied contract
entry |1 pages
Implied term
entry |2 pages
Impossibility
entry |1 pages
Impost
entry |1 pages
Incertum
entry |1 pages
Inclement weather
entry |1 pages
Inclusive price principle
entry |1 pages
Inconvenience
entry |1 pages
Incorporation of documents or terms
entry |1 pages
Incoterms
entry |1 pages
Indemnitee
entry |1 pages
Indemnitor
entry |1 pages
Indemnity
entry |2 pages
Indemnity basis
entry |1 pages
Independent contractor
entry |1 pages
Indirect or consequential loss
entry |1 pages
Individual Voluntary Arrangement (Iva)
entry |1 pages
Industry Foundation Classes (Ifc)
entry |1 pages
Ineffectiveness
entry |1 pages
Infill
entry |1 pages
Information exchange
entry |1 pages
Infra
entry |1 pages
Inglenook
entry |1 pages
Initial notice
entry |1 pages
Injection damp course
entry |1 pages
Injunction
entry |1 pages
Inner House
entry |1 pages
Innocent misrepresentation
entry |1 pages
Innominate term
entry |1 pages
In re
entry |1 pages
In-situ concrete
entry |1 pages
Insolvency
entry |1 pages
Inspection
entry |1 pages
Inspection chamber
entry |2 pages
Institution of Chemical Engineers (IchemE)
entry |1 pages
Institution of Civil Engineers (Ice)
entry |1 pages
Institution of Electrical Engineers (Iee)
entry |1 pages
Institution of Engineering and Technology (Iet)
entry |1 pages
Institution of Structural Engineers
entry |1 pages
Instruction
entry |1 pages
Instructions to tenderers
entry |1 pages
Instrument
entry |1 pages
Insurable interest
entry |1 pages
Insurance
entry |1 pages
Integrated Bim (iBIM)
entry |2 pages
Integrated project team (Ipt)
entry |1 pages
Intelligent building, smart building
entry |1 pages
Intention to create legal relations
entry |1 pages
Intention to rebuild
entry |1 pages
Inter alia
entry |1 pages
Intercepting trap, interceptor
entry |1 pages
Interdict
entry |1 pages
Interest
entry |1 pages
Interface documents
entry |1 pages
Interference
entry |1 pages
Interim award
entry |1 pages
Interim certificate
entry |1 pages
Interim payment
entry |1 pages
Interim remedy
entry |1 pages
Interlocutory
entry |1 pages
Intermediate Building Contract (Ic and ICD)
entry |1 pages
Intermediate Form of Contract (Ifc)
entry |1 pages
Intermediate rafter
entry |1 pages
International Chamber of Commerce (Icc)
entry |1 pages
International Federation of Consulting Engineers
entry |1 pages
International Institute for the Unification of Private Law
entry |1 pages
International Organization for Standardization (Iso)
entry |1 pages
International SfB
entry |1 pages
In terrorem
entry |1 pages
Interstitial condensation
entry |1 pages
Intrados
entry |1 pages
Intramural
entry |1 pages
Intumescence
entry |1 pages
Inverted roof
entry |1 pages
Investors Compensation Scheme Ltd v West Bromwich Building Society
entry |1 pages
Invitation to negotiate
entry |1 pages
Invitation to tender
entry |1 pages
Invitation to treat
entry |1 pages
Ipso facto
entry |1 pages
Ipso jure
entry |1 pages
Ipt
entry |1 pages
Iroko
entry |1 pages
Iso
entry |1 pages
Iso 216
entry |1 pages
Iso 9001:2008
entry |1 pages
Iso 14001
entry |1 pages
Isolator
entry |1 pages
Isometric drawing
entry |1 pages
Isotropic
entry |1 pages
Issued for Construction (Ifc)
entry |1 pages
Itb
entry |1 pages
Itn
entry |1 pages
Itt
entry |1 pages
Iva
entry |1 pages
J
entry |1 pages
Jackleg cabin
entry |1 pages
Jack rafter
entry |1 pages
Jamb
entry |1 pages
Japanese knotweed
entry |1 pages
Jct
entry |1 pages
Jct form of contract
entry |1 pages
Jct suite of contracts
entry |1 pages
Jct 63
entry |1 pages
Jct 80
entry |1 pages
Jct 98
entry |1 pages
Jct 05
entry |1 pages
Jct 2011
entry |1 pages
Jib
entry |2 pages
John Doyle Construction Ltd v Laing Management
entry |1 pages
Joinder
entry |1 pages
Joiner
entry |1 pages
Joinery
entry |1 pages
Joint Contracts Tribunal (Jct)
entry |1 pages
Joint Fire Code
entry |1 pages
Joint Iiability
entry |1 pages
Joint reinforcement
entry |1 pages
Joint runner
entry |1 pages
Joint and several liability
entry |1 pages
Joint tape
entry |1 pages
Joint tortfeasors
entry |1 pages
Joint venture
entry |1 pages
Joist
entry |1 pages
Joist hanger
entry |1 pages
Joist trimmer
entry |2 pages
Judge
entry |1 pages
Judgment
entry |1 pages
Judgment creditor
entry |1 pages
Judgment debt
entry |1 pages
Judgment debtor
entry |1 pages
Judgment in default
entry |1 pages
Judicial Committee
entry |1 pages
Judicial notice
entry |1 pages
Judicial precedent
entry |1 pages
Judicial review
entry |1 pages
Jump form
entry |1 pages
Jurat
entry |1 pages
Jurisdiction
entry |2 pages
Jurisdictional challenge
entry |1 pages
Jurisdictional error
entry |1 pages
Jv
entry |1 pages
Keating on Construction Contracts
entry |1 pages
Key performance indicator
entry |1 pages
Key plan
entry |1 pages
Key plate
entry |1 pages
Keyed joints
entry |1 pages
Keying
entry |1 pages
Keystone
entry |1 pages
Kick plate
entry |1 pages
Kicker
entry |1 pages
Kicker frame
entry |1 pages
Kiln-dried timber
entry |1 pages
Kiss mark
entry |1 pages
Kitemark
entry |1 pages
Knee brace
entry |1 pages
Knee, elbow
entry |1 pages
Knock-on effects
entry |1 pages
Knowledge
entry |1 pages
Kompetenz-kompetenz
entry |1 pages
Kpi
entry |1 pages
Kraft paper
entry |1 pages
K-value
entry |1 pages
Labour
entry |1 pages
Labour constant
entry |1 pages
Labour-only subcontractor
entry |1 pages
Laches
entry |1 pages
Lack of cover
entry |1 pages
Lacquer
entry |1 pages
Lads
entry |1 pages
Lady Justice
entry |1 pages
Lagging
entry |1 pages
Laid to fall
entry |1 pages
Laitance
entry |1 pages
Laminate
entry |1 pages
Laminated glass
entry |1 pages
Laminated plasterboard
entry |1 pages
Laminated wood
entry |1 pages
Lands Tribunal
entry |1 pages
Lap joint
entry |1 pages
Lapse of offer
entry |1 pages
Latent damage
entry |1 pages
Latent Damage Act
entry |1 pages
Latent defect
entry |1 pages
Latham Report
entry |1 pages
Law Lord
entry |1 pages
Law Report
entry |1 pages
Laxton's Building Price Book
entry |1 pages
Layout
entry |1 pages
Lcia
entry |1 pages
Lcj
entry |1 pages
Ldedc or LDEDCA
entry |1 pages
Ldf
entry |1 pages
Lead flashing
entry |1 pages
Leaded light
entry |1 pages
Leading question
entry |1 pages
Leads and lags
entry |1 pages
Leaf
entry |1 pages
Lean mix
entry |1 pages
Lean to roof
entry |1 pages
Learning curve
entry |1 pages
Legal set-off
entry |1 pages
Legal time
entry |1 pages
Letter of acceptance
entry |1 pages
Letter of intent
entry |1 pages
Level 2 Bim
entry |1 pages
Level 3 Bim
entry |1 pages
Lex arbitri
entry |1 pages
Lex fori
entry |1 pages
Liability
entry |1 pages
Libid
entry |1 pages
Libor
entry |2 pages
Lien
entry |1 pages
Life cycle
entry |1 pages
Life cycle cost analysis
entry |1 pages
Lift
entry |1 pages
Lifting the corporate veil
entry |1 pages
Light
entry |1 pages
Lightweight aggregate
entry |1 pages
Limitation
entry |1 pages
Limited company
entry |1 pages
Limited liability partnership (Llp)
entry |1 pages
Line of balance
entry |1 pages
Linear thermal bridge
entry |1 pages
Lintel, lintol
entry |1 pages
Liquidated and ascertained damages (Lads)
entry |1 pages
Liquidated damages
entry |1 pages
Liquidated demand
entry |1 pages
Liquidation
entry |1 pages
Liquidator
entry |1 pages
Lis
entry |1 pages
Listed building
entry |1 pages
Lj
entry |1 pages
Ljj
entry |1 pages
Lloyd's Rep
entry |1 pages
Llp
entry |1 pages
Load-bearing wall
entry |1 pages
Load factor
entry |1 pages
Local Democracy, Economic Development and Construction Act 2009 (Ldedc or LDEDCA)
entry |1 pages
Location plan
entry |1 pages
Local Development Framework (Ldf)
entry |1 pages
Lock out
entry |1 pages
Lockshield valve
entry |1 pages
Locus sigilli (Ls)
entry |1 pages
Loi
entry |1 pages
London stock
entry |1 pages
Lonely Bim
entry |1 pages
Lord Chancellor
entry |1 pages
Lord Chief Justice
entry |1 pages
Lord Justice
entry |1 pages
Lord Ordinary
entry |1 pages
Loss and/or expense
entry |1 pages
Loss of productivity
entry |1 pages
Loss of profit
entry |1 pages
Louvers, Louvres
entry |1 pages
Lowest price
entry |1 pages
Luminaire
entry |1 pages
Lump sum contract
entry |1 pages
M&E
entry |1 pages
M&O
entry |1 pages
Macob Civil Engineering Ltd v Morrison Construction Ltd
entry |1 pages
Made ground
entry |1 pages
Main contract
entry |1 pages
Main contractor
entry |1 pages
Main Contractor's Discount (Mcd)
entry |1 pages
Main services duct
entry |1 pages
Main stop valve
entry |1 pages
Mains supply
entry |1 pages
Mains voltage
entry |1 pages
Maintenance period
entry |1 pages
Major Project Construction Contract
entry |1 pages
Make-up
entry |1 pages
Mala fides
entry |1 pages
Management contract
entry |1 pages
Management time
entry |1 pages
Mandatory provision
entry |2 pages
Manhole
entry |1 pages
Manifest error
entry |1 pages
Manifestation
entry |1 pages
Manipulative interpretation
entry |1 pages
Mansard roof
entry |1 pages
Mareva injunction
entry |1 pages
Masonry
entry |1 pages
Master
entry |1 pages
Master key
entry |1 pages
Master programme
entry |1 pages
Mastic
entry |1 pages
Material change
entry |1 pages
Material circumstances
entry |1 pages
Materials
entry |1 pages
Materials available
entry |1 pages
Matrix
entry |1 pages
Matrix of fact
entry |1 pages
Mcd
entry |1 pages
Mdb
entry |1 pages
Mdf
entry |1 pages
Mdp
entry |1 pages
Mean radiant temperature (Mrt)
entry |2 pages
Meaning of words
entry |1 pages
Measured mile
entry |1 pages
Measurement
entry |1 pages
Measurement and value contract
entry |1 pages
Meat
entry |1 pages
Mechanical completion
entry |1 pages
Mechanical engineer
entry |1 pages
Mechanical ventilation
entry |1 pages
Mechanics' lien
entry |1 pages
Med-Arb
entry |2 pages
Mediation
entry |1 pages
Mediator
entry |1 pages
Medium-density fibreboard (Mdf)
entry |1 pages
Membrane
entry |1 pages
Memorandum of understanding
entry |1 pages
Memorial
entry |2 pages
Merchantable quality
entry |1 pages
Mep
entry |1 pages
Metal conduit
entry |1 pages
Metal decking
entry |1 pages
Method statement
entry |1 pages
Methods of Assessment and Testing (Moat)
entry |1 pages
Mewp
entry |1 pages
Mewps
entry |1 pages
Mf/1
entry |1 pages
Mf/2
entry |1 pages
Mh
entry |1 pages
MicroStation
entry |1 pages
Midspan
entry |1 pages
Mild steel
entry |1 pages
Milestone
entry |1 pages
Mineral wool
entry |1 pages
Mini-trial
entry |1 pages
Minor Works Building Contract (Mw)
entry |1 pages
Misconduct
entry |2 pages
Misfeasance in public office
entry |1 pages
Misnomer
entry |1 pages
Misrepresentation
entry |1 pages
Misrepresentation Act 1967
entry |2 pages
Mistake
entry |1 pages
Mitigation
entry |1 pages
Mix
entry |1 pages
Mobilisation
entry |1 pages
Mock-up
entry |1 pages
Model
entry |1 pages
Model Law
entry |1 pages
Modular construction
entry |1 pages
Modular control
entry |1 pages
Modular ratio
entry |1 pages
Module
entry |1 pages
Modulus of elasticity
entry |1 pages
Moiety
entry |1 pages
Moisture barrier
entry |1 pages
Moisture content
entry |1 pages
Moisture expansion
entry |1 pages
Moisture meter
entry |1 pages
Moisture movement
entry |1 pages
Moment distribution
entry |1 pages
Month
entry |1 pages
Mortar
entry |1 pages
Mortise and tenon joint
entry |1 pages
Most Economically Advantageous Tender (Meat)
entry |1 pages
Movement joints
entry |1 pages
Mullion
entry |1 pages
Multi-disciplinary practice
entry |2 pages
Murphy v Brentwood
entry |1 pages
Mutatis mutandis
entry |1 pages
Mutual dealings
entry |1 pages
Mutual mistake
entry |1 pages
Mutually explanatory
entry |1 pages
Naeci
entry |1 pages
Nail sickness
entry |1 pages
Nailing strip
entry |1 pages
Nailplate
entry |1 pages
Name borrowing
entry |1 pages
Named subcontractor
entry |1 pages
National Agreement for the Engineering Construction Industry (Naeci)
entry |1 pages
National Building Specification (Nbs)
entry |2 pages
National House Building Council (Nhbc)
entry |1 pages
National Joint Consultative Committee for Building (Njcc)
entry |1 pages
National Specialist Contractor's Council (Nscc)
entry |1 pages
Natural ground levels
entry |1 pages
Natural Justice
entry |1 pages
Natural ventilation
entry |1 pages
Nbs
entry |1 pages
Nda
entry |1 pages
Neat cement grout
entry |1 pages
Nec
entry |1 pages
Negative pressure
entry |1 pages
Negative rate
entry |1 pages
Negligence
entry |2 pages
Negligent Misrepresentation
entry |1 pages
Negligent misstatement
entry |1 pages
Negotiated procedure
entry |1 pages
Negotiations
entry |1 pages
Nemo dat quod non habet
entry |1 pages
Nemo debet esse judex in propria sua causa
entry |1 pages
Net contribution
entry |1 pages
Net floor area
entry |2 pages
Net lettable area
entry |1 pages
Network
entry |1 pages
Neutral
entry |1 pages
Neutral event
entry |1 pages
New Engineering Contract (Nec)
entry |1 pages
New York Convention
entry |1 pages
Newton
entry |1 pages
Nhbc
entry |1 pages
Nia
entry |1 pages
Nickel sulphide
entry |1 pages
Njcc
entry |1 pages
No damages for delay clause
entry |1 pages
Node
entry |1 pages
No-fines concrete
entry |1 pages
Nogging or Nog
entry |1 pages
Noise Rating (Nr)
entry |1 pages
Noise reduction coefficient
entry |1 pages
Nominal damages
entry |1 pages
Nominal dimension
entry |1 pages
Nominated subcontractor
entry |1 pages
Nominated supplier
entry |1 pages
Non-combustibility test
entry |1 pages
Non-completion certificate
entry |2 pages
Non-contestable work
entry |1 pages
Non-disclosure
entry |1 pages
Non-disclosure agreement (Nda)
entry |1 pages
Non est factum
entry |1 pages
Non illegitimi carborundum
entry |1 pages
Non-loadbearing wall
entry |1 pages
Non sequitur
entry |1 pages
Non-slip floors
entry |1 pages
Non-trafficable roof
entry |1 pages
Nosing
entry |1 pages
Notice
entry |1 pages
Notice to admit documents
entry |1 pages
Notice to admit facts
entry |1 pages
Notifiable projects
entry |2 pages
Novation
entry |1 pages
Novus actus interveniens
entry |1 pages
Nox
entry |1 pages
Nr
entry |1 pages
Nsc/4
entry |1 pages
Nscc
entry |1 pages
Nuclear Decommissioning Authority (Nda)
entry |1 pages
Nuclear energy
entry |1 pages
Nuclear Industry Association (Nia)
entry |1 pages
Nuclear reactor
entry |1 pages
Nuisance
entry |1 pages
Oath
entry |1 pages
Obiter dictum
entry |1 pages
Objective approach
entry |1 pages
Obstruction
entry |1 pages
Occupancy
entry |1 pages
Occupiers' liability
entry |1 pages
Ocr
entry |1 pages
Odn
entry |1 pages
Off site
entry |2 pages
Offer
entry |1 pages
Offer to settle
entry |1 pages
Office cost
entry |1 pages
Official receiver
entry |1 pages
Official referee
entry |1 pages
Official referee's schedule
entry |1 pages
Ohp (OH&P)
entry |1 pages
Ojeu
entry |1 pages
Ojeu Notice
entry |1 pages
O&M
entry |1 pages
Omissions
entry |1 pages
On costs
entry |2 pages
On demand bond
entry |1 pages
One-line programme
entry |1 pages
Onerous property
entry |1 pages
Onus
entry |1 pages
Open book
entry |1 pages
Open-drained joint
entry |1 pages
Open offer
entry |1 pages
Open plan
entry |1 pages
Open procedure
entry |1 pages
Open tendering
entry |2 pages
Opening note and speech
entry |1 pages
Opening up
entry |1 pages
Operation and maintenance manual (O&M)
entry |1 pages
Operational bills
entry |1 pages
Operative
entry |1 pages
Opinion evidence
entry |1 pages
Optical character recognition
entry |1 pages
Optimum moisture content
entry |1 pages
Oral testimony
entry |1 pages
Orange Book Fidic
entry |1 pages
Order
entry |1 pages
Order 14
entry |1 pages
Ordinary meaning
entry |1 pages
Oriented strand board (Osb)
entry |1 pages
O-ring joint
entry |1 pages
Or other approved
entry |1 pages
Orthographic projection
entry |1 pages
Osb
entry |1 pages
Outer House
entry |1 pages
Outer string
entry |1 pages
Out of ground
entry |1 pages
Outline planning permission
entry |1 pages
Outrigger
entry |1 pages
Oven-dried timber
entry |1 pages
Overcladding
entry |1 pages
Overflow
entry |1 pages
Overflow rainwater gutter
entry |1 pages
Overhang
entry |1 pages
Overheads
entry |1 pages
Overheads and profit
entry |1 pages
Overpanel
entry |1 pages
Overriding objective
entry |1 pages
Oversail
entry |1 pages
Oversite concrete
entry |1 pages
Owner
entry |1 pages
Ownership
entry |1 pages
Oxidation
entry |1 pages
Pabx
entry |1 pages
Package deal contract
entry |1 pages
Pad, padstone
entry |1 pages
Pagnan v Feed Products
entry |1 pages
Pain/gain share
entry |1 pages
Pali radice
entry |1 pages
Pallet
entry |1 pages
Pap
entry |1 pages
Paralegal
entry |1 pages
Parametric design
entry |1 pages
Parapet
entry |1 pages
Parent Company Guarantee
entry |1 pages
Pareto optimality
entry |1 pages
Pari passu
entry |2 pages
Sir Lindsay Parkinson (Sir Lindsay) & Co Ltd v Commissioners of Works and Public Buildings
entry |1 pages
Parole evidence rule
entry |1 pages
Parquet floor
entry |1 pages
Part 7 claim
entry |1 pages
Part 8 claim
entry |1 pages
Part 20 Claim
entry |1 pages
Part 36 Offer
entry |1 pages
Partial possession
entry |1 pages
Partiality
entry |2 pages
Particle board
entry |1 pages
Particulars of claim
entry |1 pages
Partition
entry |1 pages
Partner
entry |1 pages
Partnering
entry |1 pages
Partnership
entry |1 pages
Party wall
entry |1 pages
Party Wall Act 1996
entry |2 pages
Passing off
entry |1 pages
Passivation
entry |1 pages
Passive fire protection
entry |1 pages
Passive solar heating
entry |1 pages
Passivhaus
entry |1 pages
Patent ambiguity
entry |1 pages
Patent defects
entry |1 pages
Patent glazing
entry |1 pages
Patina
entry |1 pages
Pay direct clause
entry |2 pages
Payless notice
entry |1 pages
Payment into court
entry |1 pages
Payment notice
entry |1 pages
Pay-when-paid clause
entry |1 pages
Pba
entry |1 pages
Pc item or sum
entry |1 pages
Pd
entry |1 pages
Pea gravel
entry |1 pages
Penalty
entry |1 pages
Pencilling
entry |1 pages
Pepper v Hart
entry |1 pages
Peremptory order
entry |2 pages
Perforated brick
entry |1 pages
Performance bond or security
entry |1 pages
Performance specification
entry |1 pages
Performance Specified Work (Psw)
entry |1 pages
Performance test contract
entry |1 pages
Peril
entry |1 pages
Period of final measurement
entry |1 pages
Permanent works
entry |1 pages
Permitted development
entry |1 pages
Perpend
entry |1 pages
Person-in-charge
entry |1 pages
Perspex, Plexiglas
entry |1 pages
Pert
entry |1 pages
Pfi
entry |1 pages
Pfi contract
entry |1 pages
Pfp
entry |1 pages
pH
entry |1 pages
Phenolic foam
entry |1 pages
Piercing the corporate veil
entry |1 pages
Pig
entry |1 pages
Pilaster
entry |1 pages
Pile
entry |1 pages
Pink Book Fidic
entry |1 pages
Pinnel's case
entry |1 pages
Pitch
entry |1 pages
Pitched roof
entry |1 pages
Plain concrete
entry |1 pages
Plaintiff
entry |1 pages
Plan
entry |1 pages
Planning application
entry |1 pages
Planning conditions
entry |2 pages
Planning permission
entry |1 pages
Planning supervisor
entry |1 pages
Plant
entry |1 pages
Plant level
entry |1 pages
Plantroom
entry |1 pages
Plasterboard
entry |1 pages
Plasterwork
entry |1 pages
Plasticiser
entry |1 pages
Plate glass
entry |1 pages
Platform floor
entry |1 pages
Pleading
entry |1 pages
Plenum
entry |1 pages
Plexiglas
entry |1 pages
Plot ratio
entry |1 pages
Plumb
entry |1 pages
Plumb level
entry |1 pages
Plumb line
entry |1 pages
Plunge column
entry |1 pages
Plywood
entry |1 pages
Pointing
entry |1 pages
Point of law
entry |1 pages
Points of claim
entry |1 pages
Points of defence
entry |1 pages
Poisson distribution
entry |1 pages
Polybutylene
entry |1 pages
Polycarbonate sheet (Pc)
entry |1 pages
Polyethylene (Pe)
entry |1 pages
Polypropylene (Pp)
entry |1 pages
Polystyrene (Ps)
entry |1 pages
Polytetrafluorethylene (Ptfe)
entry |1 pages
Polyurethane (Pu)
entry |1 pages
Polyvinyl chloride (Pvc)
entry |1 pages
Polyvinyl fluoride (Pvf)
entry |1 pages
Polyvinylidene fluoride (Pvf2)
entry |1 pages
Pomi
entry |1 pages
Ponding
entry |1 pages
Portal frame
entry |2 pages
Porter v Magill
entry |1 pages
Portland cement
entry |1 pages
Portland stone
entry |1 pages
Possession
entry |1 pages
Post and beam construction
entry |1 pages
Postal (or posting) rule
entry |1 pages
Powder coating
entry |1 pages
Power float
entry |1 pages
Ppc2000
entry |1 pages
Ppp
entry |1 pages
Pqq
entry |1 pages
Practical completion
entry |1 pages
Practice Direction
entry |2 pages
Pre-action meeting
entry |1 pages
Pre-action protocol (Pap)
entry |1 pages
Preambles
entry |1 pages
Precedent
entry |1 pages
Prefabricated building
entry |1 pages
Preferential engineering
entry |2 pages
Preliminaries
entry |1 pages
Preliminary issue
entry |1 pages
Pre-patinated
entry |1 pages
Pre-qualification
entry |1 pages
Pre-qualification Questionnaire (Pqq)
entry |1 pages
Prescriptive specification
entry |1 pages
Pressed bricks
entry |1 pages
Pressed metal
entry |1 pages
Pressetext Nachrichtenagentur v Republik Oesterreich (Bund)
entry |1 pages
Prevention principle
entry |1 pages
Prima facie
entry |1 pages
Primavera Project Planner™ (P3)
entry |1 pages
Prime Contracting
entry |1 pages
Prime contractor
entry |2 pages
Prime cost
entry |1 pages
Prime cost contract
entry |1 pages
Prime cost (or Pc) sum
entry |1 pages
Principal
entry |1 pages
Principal contractor
entry |1 pages
Principal rafter
entry |1 pages
Priority of documents
entry |1 pages
Private automatic branch exchange (Pabx)
entry |2 pages
Private Finance Initiative (Pfi)
entry |1 pages
Privilege
entry |1 pages
Privity of contract
entry |1 pages
Privy Council
entry |1 pages
Probationary drawing
entry |1 pages
ProCure 21
entry |1 pages
Procurement
entry |1 pages
Procurement Regulations
entry |1 pages
Productivity
entry |1 pages
Profiled sheeting
entry |1 pages
Profit
entry |1 pages
Programme
entry |1 pages
Program Evaluation and Review Technique
entry |1 pages
Progress payment
entry |1 pages
Project bank account
entry |2 pages
Project manager
entry |1 pages
Project mediation
entry |1 pages
Project partnering
entry |1 pages
Projecting scaffold
entry |1 pages
Prolongation
entry |1 pages
Proof of debt
entry |1 pages
Property damage insurance
entry |1 pages
Proportionality
entry |1 pages
Proscenium arch
entry |1 pages
Prospective delay analysis
entry |1 pages
Protimeter
entry |1 pages
Provisional sum
entry |1 pages
Proximity
entry |1 pages
Psw
entry |1 pages
Ptfe
entry |1 pages
Ptr
entry |2 pages
Public Contracts Regulations 2006, Si 2006/5
entry |1 pages
Public–Private Partnership (Ppp)
entry |1 pages
Public procurement
entry |1 pages
Punch list
entry |1 pages
Pure economic loss
entry |1 pages
Purlin
entry |1 pages
The Purple Guide
entry |1 pages
Purposive construction
entry |1 pages
Pursuer
entry |1 pages
Push plate
entry |1 pages
Putlog scaffold
entry |1 pages
Pvb
entry |1 pages
Pvc
entry |1 pages
Pvcu
entry |1 pages
Pwr
entry |1 pages
Qa
entry |1 pages
Qc
entry |1 pages
Qc clause
entry |1 pages
Qm
entry |1 pages
Qs
entry |1 pages
Quality assurance (Qa)
entry |1 pages
Quality control
entry |1 pages
Quality management (Qm)
entry |1 pages
Quality of materials
entry |1 pages
Quality of workmanship
entry |1 pages
Quantities
entry |1 pages
Quantity Surveyor (Qs)
entry |1 pages
Quantum (of damages)
entry |2 pages
Quantum meruit
entry |1 pages
Quantum valebat
entry |1 pages
Quarry tiles
entry |1 pages
Quarter bend
entry |1 pages
Quarter-sawn timber
entry |1 pages
Quasi-arbitrator
entry |1 pages
Quasi-contract
entry |1 pages
Quatrefoil window
entry |1 pages
Queen Anne Architecture
entry |1 pages
Queen's Counsel (Qc)
entry |1 pages
Quia timet
entry |1 pages
Quicklime Lime
entry |1 pages
Quicquid plantatur solo, solo cedit
entry |1 pages
Quid pro quo
entry |1 pages
Quiet enjoyment
entry |1 pages
Quiet possession
entry |1 pages
Quoin
entry |1 pages
Quoin block
entry |1 pages
Quotation, quote
entry |1 pages
Rabbet
entry |1 pages
Radial shrinkage
entry |1 pages
Radial-sett paving
entry |1 pages
Radiant heat(ing)
entry |1 pages
Radiation protection
entry |1 pages
Radioactivity
entry |1 pages
Radon
entry |1 pages
Raft foundation
entry |1 pages
Rafter
entry |1 pages
Rag
entry |1 pages
Rainscreen or rainscreen cladding
entry |1 pages
Rainwater outlet
entry |1 pages
Rainwater pipe
entry |1 pages
Raised floor
entry |1 pages
Raked-out joint
entry |1 pages
Ramsar site
entry |1 pages
Rapid Chemical Test
entry |1 pages
Rapid gravity filter
entry |1 pages
Rates
entry |1 pages
Rateable value
entry |1 pages
Ratification
entry |1 pages
Ratio decidendi
entry |1 pages
Rcd
entry |1 pages
Rdsap
entry |1 pages
Re
entry |1 pages
Ready-mixed concrete
entry |1 pages
Real evidence
entry |1 pages
Real property
entry |1 pages
Reasonable care and skill
entry |2 pages
Reasonable price
entry |1 pages
Reasonable skill and care
entry |1 pages
Reasonable time
entry |1 pages
Reasonableness test
entry |1 pages
Rebar
entry |1 pages
Rebate
entry |1 pages
Rebated joint
entry |1 pages
Rebound hammer test
entry |1 pages
Rebuilding
entry |1 pages
Receipts and expenditure method
entry |1 pages
Receptor
entry |1 pages
Recessed joint
entry |1 pages
Recharge
entry |1 pages
Re-circulated air
entry |1 pages
Recitals
entry |1 pages
Recklessness
entry |1 pages
Reclaiming
entry |1 pages
Reconstituted stone
entry |2 pages
Rectification
entry |1 pages
Rectification period
entry |1 pages
Recurring expenditure
entry |1 pages
Recycled water
entry |1 pages
Recycling
entry |1 pages
Red Book
entry |1 pages
Red Judge
entry |1 pages
Redevelopment
entry |1 pages
Reduced Data Standard Assessment Procedure
entry |1 pages
Reduced groundwater
entry |1 pages
Reduced level
entry |1 pages
Reef
entry |1 pages
Re-examination
entry |1 pages
Reference
entry |1 pages
Reference dose
entry |1 pages
Reference specification
entry |1 pages
Referral
entry |1 pages
Referral notice
entry |1 pages
Referring party
entry |1 pages
Reflectance
entry |1 pages
Reflective glass
entry |1 pages
Reflective insulation
entry |1 pages
Refractories
entry |1 pages
Refrigerant dehumidifier
entry |1 pages
Refuge
entry |1 pages
Refurbishment
entry |1 pages
Regent St disease
entry |1 pages
Regional Planning Body (Rpb)
entry |1 pages
Regional Planning Guidance (Rpg)
entry |1 pages
Regional Strategy (Rs)
entry |1 pages
Regional Spatial Strategy (Rss)
entry |1 pages
Register Plate
entry |1 pages
Registered land
entry |1 pages
Registered office
entry |1 pages
Registers of Scotland
entry |1 pages
Registry of Toxic Effects of Chemical Substances
entry |1 pages
Regolith
entry |2 pages
Regularly and diligently
entry |1 pages
Reinforced concrete
entry |1 pages
Reinforced masonry
entry |1 pages
Reinforcement
entry |1 pages
Reinforcement bar
entry |1 pages
Reinforcement schedule
entry |1 pages
Reinforcement spacer
entry |1 pages
Reinstatement
entry |1 pages
Reinstatement basis
entry |1 pages
Rejoinder
entry |1 pages
Relative humidity
entry |1 pages
Relative readings (R/R)
entry |2 pages
Relevant Events
entry |1 pages
Relevant Matters
entry |1 pages
Relief
entry |1 pages
Remeasurement
entry |1 pages
Remeasurement contract
entry |1 pages
Remedial Treatment Surveys
entry |1 pages
Remedial work
entry |1 pages
Remediation
entry |1 pages
Remedies Directive
entry |2 pages
Remedy
entry |1 pages
Remoteness of damage
entry |1 pages
Render
entry |1 pages
Renomination
entry |1 pages
Renovating plaster
entry |1 pages
Rent
entry |1 pages
Renunciation
entry |1 pages
Repair
entry |1 pages
Reply
entry |1 pages
Repointing
entry |1 pages
Representation
entry |1 pages
Repudiation
entry |1 pages
Request for Further Information
entry |1 pages
Request for Information (Rfi)
entry |1 pages
Rescission
entry |1 pages
Reserved matters
entry |1 pages
Reservoirs
entry |1 pages
Resident engineer (Re)
entry |1 pages
Residential Agency Guidelines (Rga) RICS
entry |1 pages
Residential occupier
entry |1 pages
Residual current device
entry |1 pages
Residual risk
entry |1 pages
Resilient flooring
entry |1 pages
Resin
entry |1 pages
Res inter alios acta non nocet
entry |1 pages
Res ipsa locquitur
entry |2 pages
Res judicata
entry |1 pages
Resistance
entry |1 pages
Resource
entry |1 pages
Resource levelling
entry |1 pages
Resourceful losing party
entry |1 pages
Responding party
entry |1 pages
Response
entry |1 pages
Restitutio in integrum
entry |1 pages
Restitution
entry |1 pages
Restricted procedure
entry |2 pages
Restrictive covenant
entry |1 pages
Retail Prices Index (Rpi)
entry |1 pages
Retainage
entry |1 pages
Retaining wall
entry |1 pages
Retention (monies)
entry |2 pages
Retention of title
entry |1 pages
Retrofit
entry |1 pages
Retrospective delay analysis
entry |1 pages
Return air
entry |1 pages
Return wall
entry |1 pages
Reveal
entry |1 pages
Reverberation time
entry |1 pages
Reverse premium
entry |1 pages
Reversible repair or improvement
entry |1 pages
Reversion
entry |1 pages
Revetment
entry |2 pages
Revision
entry |1 pages
Revocation of offer
entry |1 pages
Rfi
entry |1 pages
Rh
entry |1 pages
Rias
entry |1 pages
Rib and block suspended floor
entry |1 pages
Riba
entry |1 pages
Riba Code of Professional Conduct
entry |1 pages
Riba contract
entry |1 pages
Riba Outline Plan of Work
entry |1 pages
Riba Plan of work 2013
entry |1 pages
Riba Work Stages
entry |1 pages
Rics
entry |1 pages
Rics Code of Measuring Practice
entry |1 pages
Ridge
entry |1 pages
Ridge board
entry |1 pages
Ridge course
entry |1 pages
Ridge tile
entry |1 pages
Right in gross
entry |1 pages
Right to light
entry |1 pages
Right of support
entry |1 pages
Right of way
entry |1 pages
Rights of audience
entry |1 pages
Ring beam
entry |1 pages
Ring main
entry |1 pages
Riot
entry |1 pages
Riparian
entry |1 pages
Rise
entry |1 pages
Rise and fall clause
entry |1 pages
Rise over run
entry |1 pages
Riser
entry |1 pages
Rising damp
entry |1 pages
Risk allocation
entry |1 pages
Risk allowance
entry |1 pages
Risk assessment
entry |1 pages
Risk register
entry |1 pages
Risk value
entry |1 pages
Rock
entry |1 pages
Rock berm
entry |1 pages
Rodding
entry |1 pages
Rodding eye
entry |1 pages
Rolled steel joist (Rsj)
entry |1 pages
Roller shutter, roller door
entry |1 pages
Romalpa clause
entry |1 pages
Ronseal
entry |1 pages
Roof decking
entry |1 pages
Roof truss
entry |1 pages
Roofing felt
entry |1 pages
Room data sheets
entry |1 pages
Rot clause
entry |1 pages
Rough cutting
entry |1 pages
Rough opening
entry |1 pages
Routledge v Grant
entry |1 pages
Rowlock course
entry |1 pages
Royal assent
entry |1 pages
Royal Incorporation of Architects in Scotland (Rias)
entry |1 pages
Royal Institute of British Architects (Riba)
entry |2 pages
Royal Institution of Chartered Surveyors
entry |1 pages
Rpb
entry |1 pages
Rpg
entry |1 pages
Rpi
entry |1 pages
R/r
entry |1 pages
Rsj
entry |1 pages
Rs
entry |1 pages
Rss
entry |1 pages
Rtecs
entry |1 pages
Rule of law
entry |1 pages
Rules of construction
entry |1 pages
Rules of the Supreme Court (Rsc)
entry |1 pages
Running bond
entry |1 pages
Rustication
entry |1 pages
R-value
entry |1 pages
Rwp
entry |2 pages
Rylands v Fletcher liability
entry |1 pages
Sacrificial coating
entry |1 pages
Sacrificial panel
entry |1 pages
Saddle scaffold
entry |1 pages
Saddle trusses
entry |1 pages
Saddle-jib crane
entry |1 pages
Safe working load (Swl)
entry |1 pages
Sale of goods
entry |1 pages
Same arbitrator provision
entry |1 pages
Sample panel
entry |1 pages
Sanctity of contract
entry |1 pages
Sand bedding
entry |1 pages
Sanderson order
entry |1 pages
Sandwich construction
entry |1 pages
Sap rating
entry |1 pages
Sarking felt
entry |1 pages
Sash Window
entry |1 pages
Satisfaction
entry |1 pages
Satisfactory quality
entry |1 pages
Save harmless
entry |1 pages
Saving the document
entry |1 pages
Sawn damp course
entry |1 pages
Sbc
entry |1 pages
Sbem
entry |1 pages
Sc
entry |1 pages
Scabbling
entry |1 pages
Scada
entry |1 pages
Scaffold coupler
entry |2 pages
Scaffold, scaffolding
entry |1 pages
Scafftag
entry |1 pages
Scale
entry |1 pages
Scale fees
entry |1 pages
Scaled dimension
entry |1 pages
Schedule
entry |1 pages
Schedule 2 quotation
entry |1 pages
Schedule of defects
entry |1 pages
Schedule of rates (Sor)
entry |1 pages
Scheduled monuments
entry |2 pages
Scheme for Construction Contracts (the Scheme)
entry |1 pages
Scheme of arrangement
entry |1 pages
Schmidt hammer test
entry |1 pages
Scientific and technical terms
entry |1 pages
Scissors lift
entry |1 pages
Scl
entry |1 pages
Scl Delay Protocol
entry |1 pages
Scope of works
entry |1 pages
Scott Schedule
entry |1 pages
Scott v Avery Clause
entry |1 pages
Screed
entry |1 pages
Scrim
entry |1 pages
S-curve
entry |1 pages
Seal
entry |1 pages
Sealed offer
entry |1 pages
Search order
entry |1 pages
Seasoning
entry |1 pages
Seat of the arbitration
entry |1 pages
Second fix or fixing
entry |1 pages
Secondary fixing
entry |1 pages
Secondary glazing
entry |1 pages
Secret fixings
entry |1 pages
Secret nailing
entry |1 pages
Section
entry |1 pages
Section 106 Agreement
entry |1 pages
Section 4 summons
entry |1 pages
Sectional completion
entry |1 pages
Security
entry |1 pages
Security for Costs
entry |2 pages
Security of payment
entry |1 pages
Seizure clause
entry |1 pages
Selected subcontractor
entry |1 pages
Selective tendering
entry |1 pages
Self-climbing tower crane
entry |1 pages
Self-curing
entry |1 pages
Self-levelling screed
entry |1 pages
Semble
entry |1 pages
Separable portion
entry |1 pages
Separating floor
entry |1 pages
Sequence of trades
entry |1 pages
Seriatim
entry |2 pages
Serious irregularity
entry |1 pages
Service
entry |1 pages
Service lift
entry |1 pages
Services
entry |1 pages
Services engineer
entry |1 pages
Set aside
entry |1 pages
Set off
entry |1 pages
Setting aside
entry |2 pages
Setting out
entry |1 pages
Settlement
entry |1 pages
Settlement Agreement
entry |1 pages
Shared proceeds provision
entry |1 pages
Shear
entry |1 pages
Shear force
entry |1 pages
Shear plate
entry |1 pages
Shear strain
entry |1 pages
Shear strength
entry |1 pages
Shear stress
entry |1 pages
Shear test
entry |1 pages
Shear wall
entry |1 pages
Sheathing felt
entry |1 pages
Sheet glass
entry |1 pages
Sheet metal
entry |1 pages
Sheet pile
entry |1 pages
Shell & core
entry |1 pages
Shiplap boards
entry |1 pages
Shock absorber clause
entry |1 pages
Shoe
entry |1 pages
Shop drawing
entry |1 pages
Shopping list principle
entry |1 pages
Shoring
entry |1 pages
Shower tray
entry |1 pages
Shutter, shuttering
entry |1 pages
Si
entry |1 pages
Sic
entry |1 pages
Sick building
entry |2 pages
Signature
entry |1 pages
Silver Book Fidic
entry |1 pages
Simon Carves Ltd v Ensus Uk Ltd
entry |1 pages
Simple contract
entry |1 pages
Simpliciter
entry |1 pages
Sine die
entry |1 pages
Sine qua non
entry |1 pages
Single arbitrator provision
entry |1 pages
Single joint expert
entry |1 pages
Single-line diagram
entry |1 pages
Single-ply roof
entry |1 pages
Single-stage selective tendering
entry |1 pages
Sips
entry |1 pages
Site accommodation
entry |1 pages
Site agent
entry |1 pages
Site boundary
entry |1 pages
Site clearance
entry |1 pages
Site clerk
entry |1 pages
Site diary
entry |1 pages
Site engineer
entry |1 pages
Site examination
entry |1 pages
Site instructions
entry |1 pages
Site investigations
entry |1 pages
Site manager
entry |1 pages
Site overheads
entry |1 pages
Site plan
entry |1 pages
Skeleton argument
entry |1 pages
Skill and care
entry |1 pages
Skim coat
entry |1 pages
Skirt
entry |2 pages
Skirting
entry |1 pages
Slab
entry |1 pages
Slack
entry |1 pages
Slag
entry |1 pages
Sleeper
entry |1 pages
Sleeper wall
entry |1 pages
Slip form
entry |1 pages
Slip joint
entry |1 pages
Slip rule
entry |1 pages
Slump test
entry |1 pages
Small and medium sized enterprise (Sme)
entry |1 pages
Small claims track
entry |1 pages
Small works agreement
entry |1 pages
Smith v South Wales Switchgear
entry |1 pages
Smm, SMM7
entry |1 pages
Snagging
entry |1 pages
Snagging list
entry |1 pages
Soffit
entry |1 pages
Soft landscaping
entry |1 pages
Softwood
entry |1 pages
Soil pipe
entry |1 pages
Soil stack
entry |1 pages
Soil vent
entry |1 pages
Solar-control glazing
entry |1 pages
Soldier course
entry |1 pages
Sole plate
entry |1 pages
Sole risk clause
entry |1 pages
Solid masonry unit
entry |1 pages
Sound insulation
entry |1 pages
Spacer
entry |1 pages
Spalling
entry |1 pages
Spandrel panel
entry |1 pages
Sparks or sparky
entry |1 pages
Spars
entry |1 pages
Spearin doctrine
entry |1 pages
Special
entry |1 pages
Special case
entry |1 pages
Special condition(s)
entry |1 pages
Special damages
entry |1 pages
Special Purpose Vehicle (Spv)
entry |1 pages
Specialist contractor
entry |1 pages
Specialty
entry |1 pages
Specific disclosure
entry |1 pages
Specific performance
entry |1 pages
Specification
entry |1 pages
Specified peril
entry |1 pages
Split brick
entry |1 pages
Split-face block
entry |1 pages
Spon's Price Books
entry |1 pages
Springer
entry |1 pages
Spv
entry |1 pages
Ssl
entry |1 pages
Sssi
entry |2 pages
Stability
entry |1 pages
Stack bonding
entry |1 pages
Stack effect
entry |1 pages
Stack pipe
entry |1 pages
Stack vent
entry |1 pages
Staffordshire blue brick/engineering brick
entry |1 pages
Stage payment
entry |1 pages
Stainless steel
entry |1 pages
Stakeholder
entry |1 pages
Stall riser
entry |1 pages
Stallboard
entry |1 pages
Stanchion
entry |1 pages
Standard basis
entry |1 pages
Standard Building Contract (Sbc)
entry |1 pages
Standard Commercial Property Conditions of Sale (2nd edn)
entry |1 pages
Standard form
entry |1 pages
Standard method claim
entry |1 pages
Standard method of measurement (Smm, SMM7)
entry |1 pages
Standard of care
entry |1 pages
Standard of proof
entry |1 pages
Standard special
entry |1 pages
Standby letter of credit
entry |1 pages
Standing offer
entry |1 pages
Standing seam
entry |1 pages
Standpipe
entry |1 pages
Standstill agreement
entry |1 pages
Standstill period
entry |1 pages
Star rate
entry |1 pages
Stare decisis
entry |1 pages
Start-to-finish relationship
entry |1 pages
Start-to-start relationship
entry |1 pages
Starter bar
entry |1 pages
State of the art
entry |1 pages
Statement of affairs
entry |1 pages
Statement of case
entry |1 pages
Statement of claim
entry |1 pages
Status quo
entry |1 pages
Statute
entry |1 pages
Statute barred
entry |2 pages
Statute of Frauds 1677
entry |1 pages
Statutory demand
entry |1 pages
Statutory duty
entry |1 pages
Statutory instruments
entry |1 pages
Statutory scheme
entry |1 pages
Statutory undertaker
entry |2 pages
Stay of execution
entry |1 pages
Stay of proceedings
entry |1 pages
Steel
entry |1 pages
Steel-fibre-reinforced concrete
entry |1 pages
Steel sections
entry |1 pages
Step-in rights
entry |1 pages
Stepped footing
entry |1 pages
Stick system
entry |1 pages
Sto render
entry |1 pages
Stock brick
entry |1 pages
Stockpile
entry |1 pages
Stop bead
entry |1 pages
Stop notice
entry |1 pages
Stopcock
entry |1 pages
Strain
entry |1 pages
S-trap
entry |1 pages
Stress
entry |1 pages
Stretcher course or bond
entry |1 pages
Strict construction
entry |1 pages
Strict liability
entry |1 pages
Strike
entry |1 pages
Striking
entry |1 pages
Striking off
entry |1 pages
Striking out
entry |1 pages
Striking time
entry |1 pages
String
entry |1 pages
String, stringer course
entry |1 pages
Strip footing
entry |1 pages
Stripping out
entry |1 pages
Strongboy
entry |1 pages
Structural concrete
entry |1 pages
Structural drawings
entry |1 pages
Structural engineer
entry |1 pages
Structural glazing
entry |1 pages
Structural polychromic
entry |1 pages
Structural slab level (Ssl)
entry |1 pages
Structural steelwork
entry |1 pages
Structure
entry |1 pages
Strut
entry |1 pages
Stud
entry |1 pages
Stud partition
entry |1 pages
Sub-base
entry |1 pages
Subbie
entry |2 pages
Subcontract
entry |1 pages
Subcontractor
entry |1 pages
Sub-floor
entry |1 pages
Sub-frame
entry |1 pages
Sub-grade
entry |1 pages
Subjective intentions
entry |1 pages
Subject to contract
entry |1 pages
Sub judice
entry |1 pages
Sublet
entry |1 pages
Sub-level
entry |1 pages
Sub-network
entry |1 pages
Subpoena
entry |1 pages
Subrogation
entry |1 pages
Subsidence
entry |1 pages
Subsidised housing scheme works contracts
entry |1 pages
Substantial completion
entry |1 pages
Substantial performance
entry |1 pages
Substantial remedy
entry |1 pages
Substation
entry |2 pages
Substituted contractor
entry |1 pages
Substructure
entry |1 pages
Suds
entry |1 pages
Sui generis
entry |1 pages
Suitability
entry |1 pages
Sulphate attack
entry |1 pages
Summary assessment
entry |1 pages
Summary judgment
entry |2 pages
Summons
entry |1 pages
Sunday and night working
entry |1 pages
Sun pipe/sun tube
entry |1 pages
Sunset date
entry |1 pages
Superplasticiser
entry |1 pages
Superstructure
entry |1 pages
Supervising officer
entry |1 pages
Supervision
entry |1 pages
Supervisor
entry |1 pages
Supplier
entry |1 pages
Supply and fix
entry |1 pages
Supply chain
entry |2 pages
Supply of documents
entry |1 pages
Supply of Goods & Services Act 1982
entry |1 pages
Supply only
entry |1 pages
Supra
entry |1 pages
Supreme Court
entry |1 pages
Surety
entry |1 pages
Surface coefficient
entry |1 pages
Surface retarder
entry |1 pages
Surface water attenuation
entry |1 pages
Surveyor
entry |1 pages
Suspended ceiling
entry |1 pages
Suspended floor
entry |1 pages
Suspension
entry |1 pages
Suspension bridge
entry |1 pages
Sustainability
entry |1 pages
Sustainable development
entry |1 pages
Sutcliff v Thackrah
entry |1 pages
Swan neck
entry |1 pages
Sweating
entry |1 pages
Swift
entry |1 pages
Switchroom
entry |1 pages
Swl
entry |1 pages
10% Syndrome
entry |1 pages
T&Cs
entry |1 pages
Take-off or Taking off
entry |1 pages
Take or pay agreement
entry |1 pages
Take over or Taking over
entry |1 pages
Taking Over Certificate (Toc)
entry |1 pages
Tanking
entry |1 pages
Tap-off unit
entry |1 pages
Target contract
entry |1 pages
Target cost contract
entry |1 pages
Target price contract
entry |1 pages
Taxation
entry |1 pages
Tbm
entry |1 pages
Tecbar
entry |1 pages
TeCsa
entry |1 pages
Tcc
entry |1 pages
Tcc Guide
entry |1 pages
Technical query (Tq)
entry |1 pages
Technical terms
entry |1 pages
Technology and Construction Bar Association (Tecbar)
entry |1 pages
Technology and Construction Court (Tcc)
entry |1 pages
Technology and Construction Solicitors' Association (TeCsa)
entry |2 pages
Tell-tale
entry |2 pages
Tempered glass
entry |1 pages
Temporary benchmark (Tbm)
entry |1 pages
Temporary disconformity
entry |1 pages
Temporary works
entry |1 pages
Tender
entry |1 pages
Tender deposit
entry |2 pages
Tendering
entry |1 pages
Tenon
entry |1 pages
Tensile
entry |1 pages
Tension
entry |1 pages
Term contract
entry |1 pages
Terminal float
entry |1 pages
Termination
entry |1 pages
Terms of art
entry |1 pages
Terms of reference
entry |1 pages
Terrazzo
entry |2 pages
Terrorism
entry |1 pages
Terrorism cover
entry |1 pages
Tessellated pavement
entry |1 pages
Test piles
entry |1 pages
Test pit
entry |1 pages
Testimony
entry |1 pages
Test of reasonableness
entry |1 pages
Thaumasite
entry |1 pages
Theft
entry |2 pages
Thermal break
entry |1 pages
Thermal bridge
entry |1 pages
Thermal resistance
entry |1 pages
Thermal stress breakage
entry |1 pages
Thermal transmittance
entry |1 pages
Thermoset
entry |1 pages
Third fixing
entry |1 pages
Third party
entry |1 pages
Third party debt orders
entry |1 pages
Third party proceedings
entry |1 pages
Third surveyor
entry |1 pages
Thixotropic
entry |2 pages
Three Rivers District Council v Bank of England
entry |1 pages
Three rules of mitigation
entry |1 pages
Threshold
entry |1 pages
Threshold jurisdictional error
entry |1 pages
Tie beam
entry |1 pages
Tier-1 supplier
entry |1 pages
Tilos
entry |1 pages
Tilt-and-turn window
entry |1 pages
Timber
entry |1 pages
Timber Research and Development Association (Trada)
entry |2 pages
Time-at-large
entry |1 pages
Time bar
entry |1 pages
Time immemorial
entry |1 pages
Time of the essence
entry |2 pages
Time-impact analysis
entry |1 pages
Times Law Reports
entry |1 pages
Time-related costs
entry |1 pages
Time value of money
entry |1 pages
Title
entry |1 pages
Title block
entry |1 pages
Tlc
entry |1 pages
Tlr
entry |1 pages
Toc
entry |1 pages
Tolent clause
entry |1 pages
Tolerance
entry |1 pages
Tolling agreement
entry |1 pages
Tomlin order
entry |1 pages
Tongue and groove joint
entry |1 pages
Tooling
entry |1 pages
Toothing out
entry |1 pages
Top chord
entry |1 pages
Top-down construction
entry |1 pages
Top-hung window
entry |1 pages
Topping-out
entry |1 pages
Torpedo
entry |1 pages
Tort
entry |1 pages
Tortfeasor
entry |1 pages
Total float
entry |1 pages
Total loss claim
entry |1 pages
Total rise
entry |1 pages
Toughened glass
entry |1 pages
Tower crane
entry |1 pages
Tower scaffold
entry |1 pages
Town planning
entry |1 pages
Tpo
entry |1 pages
Tq
entry |1 pages
Trabeation
entry |1 pages
Trace heating
entry |1 pages
Tracery
entry |2 pages
Track allocation
entry |1 pages
Trada
entry |1 pages
Trade contractor
entry |1 pages
Trade usage
entry |1 pages
Traditional contract
entry |1 pages
Traditional procurement route
entry |1 pages
Trafficable roof
entry |1 pages
Transcript
entry |2 pages
Transfer of proceedings
entry |1 pages
Transmission
entry |1 pages
Transom
entry |1 pages
Transparency
entry |1 pages
Transparency International
entry |1 pages
Trap
entry |1 pages
Tread
entry |1 pages
Tree preservation order (Tpo)
entry |1 pages
Tree Preservation Orders: A guide to the Law and Good Practice (2000) with amendments (2009)
entry |1 pages
Trench-fill foundation
entry |2 pages
Trespass
entry |1 pages
Trial pit
entry |1 pages
Triaxial compression test
entry |1 pages
Tribology
entry |1 pages
Trimmer beam
entry |1 pages
Trunking
entry |1 pages
Truss
entry |1 pages
Trussed rafter
entry |1 pages
Trust
entry |1 pages
Trv
entry |1 pages
Tubular scaffolding
entry |1 pages
Tunnel boring machine
entry |1 pages
Turriff Construction Ltd v Regalia Knitting Mills Ltd
entry |1 pages
Turnkey contract
entry |1 pages
Turnover discount
entry |1 pages
Tuck pointing
entry |2 pages
Two-stage selective tendering
entry |1 pages
Typical detail
entry |1 pages
Typical floor
entry |1 pages
Tyrolean finish or render
entry |1 pages
Uberrima fides
entry |1 pages
Ultra
entry |1 pages
Ultra vires
entry |1 pages
Ultraviolet radiation
entry |1 pages
Umbrella deed
entry |1 pages
Umpire
entry |1 pages
Unbonded screed
entry |1 pages
Uncertainty
entry |1 pages
Uncitral
entry |1 pages
Unconditional bond
entry |1 pages
Unconscionable bargain
entry |1 pages
Undercertification
entry |1 pages
Undercroft
entry |1 pages
Underfloor space
entry |1 pages
Underground services
entry |1 pages
Underlay
entry |1 pages
Underpinning
entry |1 pages
Undertaking
entry |1 pages
Undisclosed principal
entry |1 pages
Undue influence
entry |1 pages
Uneconomic working
entry |1 pages
Unenforceable contract
entry |1 pages
Unfair Contract Terms Act 1977
entry |1 pages
Unfixed materials
entry |1 pages
Unforeseen ground conditions
entry |1 pages
Ungley order
entry |1 pages
Unidroit
entry |1 pages
Uniformity
entry |1 pages
Unilateral contract
entry |1 pages
Unincorporated association
entry |1 pages
Uniplex (Uk) Ltd v NHS Business Services Authority
entry |1 pages
Unit price, unit rate
entry |1 pages
Universal beam (Ub) section
entry |1 pages
Universal column (Uc) section
entry |1 pages
Unjust enrichment
entry |1 pages
Unless order
entry |1 pages
Unliquidated damages
entry |1 pages
Unplasticised polyvinyl chloride (uPvc)
entry |1 pages
Unreasonably
entry |1 pages
Untrimmed floor
entry |1 pages
Uplift
entry |1 pages
Uplighter
entry |1 pages
Upon notice
entry |1 pages
Upside-down roof
entry |1 pages
Upstand
entry |1 pages
Upstand beam
entry |1 pages
uPvc
entry |1 pages
Usage
entry |1 pages
Utilities Contracts Regulations
entry |1 pages
U-value
entry |1 pages
Vacate (a date)
entry |1 pages
Valley
entry |1 pages
Valuation
entry |1 pages
Value Added Tax (Vat)
entry |1 pages
Value engineering (Ve)
entry |1 pages
Vane testing
entry |1 pages
Vapour barrier
entry |1 pages
Vapour control layer
entry |1 pages
Variable air volume systems (Vav)
entry |1 pages
Variant bid
entry |1 pages
Variation
entry |1 pages
Variation in cost clause
entry |1 pages
Variation of price clause
entry |1 pages
Variation order
entry |1 pages
Vat
entry |1 pages
Vav
entry |1 pages
Ve
entry |1 pages
Veneer
entry |1 pages
Veneered wall
entry |1 pages
Ventilating brick
entry |1 pages
Ventilation
entry |1 pages
Ventilation pipe, vent pipe
entry |1 pages
Venting
entry |1 pages
Verba chartarum fortius accipiuntur contra proferentem
entry |1 pages
Verbatim
entry |1 pages
Verdigris
entry |1 pages
Verge
entry |1 pages
Vermiculite
entry |1 pages
Vesting
entry |1 pages
Vesting clause
entry |1 pages
Vertical production method
entry |1 pages
Vexatiously
entry |1 pages
Vicarious liability
entry |1 pages
Videlicet
entry |1 pages
View
entry |1 pages
Vis major
entry |1 pages
Vitiate
entry |1 pages
Viz
entry |1 pages
Void
entry |1 pages
Voidable
entry |1 pages
Volenti non fit injuria
entry |1 pages
Volume control damper
entry |1 pages
Voluntary arrangement
entry |1 pages
Volute
entry |1 pages
Vomitory/vomitorium
entry |1 pages
Voussoir
entry |1 pages
Wainscot
entry |1 pages
Waist
entry |1 pages
Waiver
entry |1 pages
Wall anchor
entry |1 pages
Wall plate
entry |1 pages
Wall string
entry |1 pages
Wall tie
entry |1 pages
Wallboard
entry |2 pages
War
entry |1 pages
Warm roof
entry |1 pages
Warning
entry |1 pages
Warranty
entry |1 pages
Wasted cost order
entry |1 pages
Wasted expenditure
entry |1 pages
Water bar
entry |2 pages
Water content
entry |1 pages
Waterproofing
entry |1 pages
Wbp (Weather and Boil Proof) timber
entry |1 pages
Weather
entry |1 pages
Weatherstripping or Weather-stripping
entry |1 pages
Wednesbury grounds
entry |1 pages
Weekly Law Reports (Wlr)
entry |1 pages
Weephole
entry |1 pages
Wet rot
entry |1 pages
Wet trades
entry |1 pages
Whereas clause
entry |1 pages
White Book
entry |1 pages
Whrb
entry |1 pages
Whole life costs
entry |1 pages
Wickham test
entry |1 pages
Wild cat arbitration
entry |1 pages
Wilful misconduct
entry |1 pages
Williams v Fitzmaurice
entry |1 pages
Wind load
entry |1 pages
Winding up
entry |1 pages
Window board
entry |1 pages
Windows analysis
entry |1 pages
Winter working
entry |1 pages
Win-win situation
entry |1 pages
Wingman
entry |1 pages
Wireframe
entry |1 pages
Wire gauge
entry |1 pages
Wire-cut bricks
entry |1 pages
Wired glass
entry |1 pages
With costs
entry |1 pages
Withholding notice
entry |1 pages
Without prejudice
entry |1 pages
Without prejudice save as to costs
entry |1 pages
Witness
entry |1 pages
Witness conferencing
entry |1 pages
Witness purdah
entry |1 pages
Witness statement
entry |1 pages
Witness summary
entry |1 pages
Witness summons
entry |1 pages
Witney Town Council v Beam Construction (Cheltenham) Ltd
entry |1 pages
Wlr
entry |1 pages
Woolf Report
entry |1 pages
Work person
entry |1 pages
Workability
entry |1 pages
Working drawings
entry |1 pages
Workmanship
entry |1 pages
Works
entry |1 pages
Works contractor
entry |1 pages
Works information
entry |1 pages
Writ
entry |1 pages
Writ of execution
entry |1 pages
Writing
entry |1 pages
Written clauses
entry |1 pages
Written submissions
entry |1 pages
Xeriscapeâ
entry |1 pages
Xestobium rufovillosum
entry |1 pages
Xps Extruded Polystyrene
entry |1 pages
Xylonite
entry |1 pages
Xylotechnigraphy
entry |1 pages
Y-value
entry |1 pages
Yard
entry |1 pages
Y2k
entry |1 pages
Ycms Ltd v Grabiner
entry |1 pages
Year
entry |1 pages
Yellow Book
entry |1 pages
Yett
entry |1 pages
Young's modulus
entry |1 pages
Youngman's board
entry |1 pages
Yuanda (Uk) Co Ltd v WW Gear Construction Ltd
entry |1 pages
Yurt
entry |1 pages
Z-bar
entry |1 pages
Z clause
entry |1 pages
Zealous witness
entry |1 pages
Zero-sum game
entry |1 pages
Z-form
entry |1 pages
Zinc roofing
entry |1 pages
Zipper clause
entry |1 pages
Zone of influence
entry |1 pages
Zoning
entry |1 pages
Z-purlin
entry |1 pages
Z-section