ABSTRACT

The Dictionary of Construction Terms offers clear and concise explanations of the most commonly encountered legal and technical terms, phrases and abbreviations used throughout the construction industry. It will save valuable time when searching for an authoritative explanation of a frequently used term and will become a practical reference for construction lawyers, practitioners and students, as well as those in related industries including planning, property and insurance.


Why you should buy this book:

  • There is no other all-inclusive collection of legal and technical terms available at present
  • Convenient source of information for lawyers, practitioners and students
  • Includes a list of common technical acronyms (ie. DPC, DPM, FFL)
  • Lists acronyms of common institutions such as the ICE, JCT and ACE 

Examples of definitions:

Modular construction

A modern construction method whereby the building is constructed using prefabricated or pre-assembled building sections or modules. The three-dimensional building sections are typically fabricated and assembled in an enclosed factory environment and then delivered to site, ready for installation. Modular construction is aimed at minimising construction time by standardising design components, providing consistent quality and allowing site preparation and building activities to commence concurrently with the construction of the factory-made modules.

Snagging

The process of formally inspecting the construction works to identify any incomplete works or defects in completed works. A snagging list (or ‘punch list’) is a schedule of defects resulting from this inspection. These items typically need to be rectified prior to the issuing of a completion certificate or handing-over of the works although in some cases a completion certificate will be issued with a snagging list attached.

chapter |28 pages

A

entry |1 pages

Aac

entry |1 pages

Abandonment

entry |1 pages

Abatement

entry |1 pages

Abe

entry |1 pages

Ab initio

entry |1 pages

Above ordnance datum (Aod)

entry |1 pages

Absolute obligation

entry |1 pages

Absorption

entry |1 pages

Abuse of process

entry |1 pages

Abutment

entry |1 pages

Aca

entry |2 pages

Accelerated Low Water Corrosion (Alwc)

entry |1 pages

Acceleration

entry |1 pages

Accelerator

entry |1 pages

Acceptance

entry |1 pages

Accepted programme

entry |1 pages

Accepted risk

entry |1 pages

Access floor

entry |1 pages

Access to site

entry |1 pages

Accident

entry |1 pages

Accommodation works

entry |1 pages

Accord and satisfaction

entry |1 pages

Ace

entry |1 pages

Acknowledgement of service

entry |1 pages

AcoP

entry |1 pages

Acoustic boards/panels/tiles

entry |1 pages

Acquiescence

entry |1 pages

Action

entry |1 pages

Activation

entry |1 pages

Active solar heating

entry |1 pages

Activity

entry |1 pages

Activity Schedule

entry |1 pages

Act of God

entry |1 pages

Act of Parliament

entry |1 pages

Actual cost

entry |1 pages

Actual cost contract

entry |1 pages

Actual notice

entry |1 pages

Addendum bills

entry |1 pages

Additional claim

entry |1 pages

Additional party

entry |1 pages

Additional work

entry |1 pages

Address for service

entry |1 pages

Addressable fire alarm system

entry |1 pages

Adequacy of consideration

entry |1 pages

Adequacy of damages

entry |1 pages

Ad hoc

entry |1 pages

Ad idem

entry |1 pages

Adjoining owner

entry |1 pages

Adjudication

entry |1 pages

Adjudication Rules

entry |1 pages

Adjudicator

entry |2 pages

Adjudicator Nominating Body (Anb)

entry |2 pages

Adjudicator's jurisdiction

entry |1 pages

Adjusted as-planned programme

entry |1 pages

Administration

entry |1 pages

Administration Order

entry |1 pages

Administrative charges

entry |1 pages

Administrative Receiver

entry |1 pages

Admissibility of evidence

entry |1 pages

Admixture

entry |1 pages

Adr

entry |1 pages

Adr agreement

entry |1 pages

Adr clause

entry |1 pages

Adsorption

entry |1 pages

Advance payment guarantee

entry |1 pages

Advance payments

entry |1 pages

Adverse physical conditions

entry |1 pages

Adverse weather conditions

entry |1 pages

A&E, A/E

entry |1 pages

Aerated concrete

entry |1 pages

Aeration

entry |1 pages

Afc

entry |1 pages

Affidavit

entry |1 pages

Affirmation

entry |1 pages

A fortiori

entry |2 pages

A-frame building

entry |1 pages

Aga

entry |1 pages

Agc

entry |1 pages

Agency

entry |1 pages

Agent

entry |1 pages

Aggregate

entry |1 pages

Aggregate/cement ratio

entry |1 pages

Aggregates levy

entry |1 pages

Agreement

entry |1 pages

Agrément Certificate

entry |1 pages

Ahu

entry |1 pages

Ai

entry |1 pages

Aia

entry |1 pages

Air-admittance valve

entry |1 pages

Air balancing

entry |1 pages

Air brick

entry |1 pages

Air conditioning

entry |1 pages

Air curtain or air door

entry |1 pages

Air diffuser

entry |1 pages

Air-dried timber

entry |1 pages

Airey house

entry |1 pages

Air-entraining admixture

entry |1 pages

Air handling unit (Ahu)

entry |1 pages

Air space

entry |2 pages

Air termination network

entry |1 pages

Alarp

entry |1 pages

Alcatel Letter

entry |1 pages

Alcatel period

entry |1 pages

Alderslade principle

entry |1 pages

Alghussein Establishment v Eton College

entry |1 pages

Alkali metal

entry |1 pages

Alkaline

entry |1 pages

Alkali-resistant glassfibre

entry |1 pages

Alkali-resistant paint

entry |1 pages

Alkali silica reaction (Asr)

entry |1 pages

Alliancing

entry |1 pages

All-in aggregate

entry |1 pages

All-inclusive price principle

entry |1 pages

Allocation Questionnaire

entry |1 pages

Alternate bay construction

entry |1 pages

Alternative Dispute Resolution (Adr)

entry |1 pages

Aluminium

entry |1 pages

Aluminium Industrie Vaassen Bv v Romalpa Aluminium Ltd

entry |1 pages

Aluminium roofing

entry |1 pages

Aluminium–zinc coating

entry |1 pages

Alwc

entry |2 pages

Ambiguity

entry |1 pages

Ambush

entry |1 pages

Amendment

entry |2 pages

American Cyanamid principles

entry |1 pages

The American Institute of Architects (Aia)

entry |1 pages

American Petroleum Institute (Api)

entry |1 pages

American Society of Mechanical Engineers (Asme)

entry |1 pages

American Society for Testing and Materials (Astm)

entry |1 pages

Analogue addressable fire detector

entry |1 pages

Anchorage

entry |1 pages

Ancient lights

entry |1 pages

Ancient monument

entry |1 pages

Anechoic Chamber

entry |1 pages

Angle bead

entry |1 pages

Angle brace

entry |1 pages

Angle section

entry |1 pages

Anisotropic

entry |1 pages

Annealed glass

entry |1 pages

Annealing

entry |1 pages

Annexe

entry |1 pages

Anns v Merton London Borough Council

entry |1 pages

Anode

entry |1 pages

Anode corrosion

entry |1 pages

Anodising

entry |1 pages

Anticipatory breach

entry |2 pages

Antiquities

entry |1 pages

Anti-static flooring

entry |1 pages

Anton Piller order

entry |1 pages

Aod

entry |1 pages

Ap1000

entry |1 pages

Appeal

entry |1 pages

Appendix to Tender

entry |1 pages

Applicable law

entry |1 pages

Application

entry |1 pages

Application notice

entry |1 pages

Application for Payment

entry |1 pages

Apportionment

entry |1 pages

Approved Code of Practice (AcoP)

entry |1 pages

Approved for construction (Afc)

entry |2 pages

Approved Documents

entry |1 pages

Approved inspector

entry |1 pages

Approximate quantities

entry |1 pages

Aqueous

entry |1 pages

Arb

entry |1 pages

Arbitral Tribunal

entry |1 pages

Arbitration

entry |1 pages

Arbitration Act 1996

entry |1 pages

Arbitration Agreement

entry |3 pages

Arbitration clause

entry |1 pages

Arbitrator

entry |1 pages

Architect

entry |1 pages

Architect's/Engineer's Independence

entry |2 pages

Architect's Instruction (Ai)

entry |1 pages

Architect's Registration Board (Arb)

entry |1 pages

Architectural concrete

entry |1 pages

Architectural drawings

entry |1 pages

Architectural metalwork

entry |1 pages

Architectural sections

entry |1 pages

Architrave

entry |2 pages

Articles of agreement

entry |1 pages

Artificial obstruction

entry |1 pages

Artists, tradesmen or others engaged by the employer

entry |1 pages

Asbestos

entry |1 pages

As-built but-for analysis

entry |1 pages

As-built critical path

entry |1 pages

As-built drawings

entry |1 pages

As-built programme

entry |1 pages

Ascertain

entry |1 pages

Ashlar

entry |1 pages

As Low as Reasonably Practicable (Alarp)

entry |1 pages

Asphalt

entry |1 pages

Asphalt roofing

entry |1 pages

Aspirated detection system

entry |1 pages

As-planned impacted

entry |2 pages

As-planned programme

entry |1 pages

As-planned v as-built

entry |1 pages

Asr

entry |1 pages

Assessment of costs

entry |1 pages

Assignment

entry |1 pages

Associate General Contractors of America (Agc)

entry |1 pages

Association of Building Engineers (Abe)

entry |1 pages

Association of Consultant Architects (Aca)

entry |1 pages

Association of Consulting Engineers (Ace)

entry |1 pages

Assumption of responsibility

entry |1 pages

Astm International

entry |1 pages

Atrium

entry |1 pages

Attendance

entry |1 pages

Attenuator

entry |1 pages

Attestation

entry |1 pages

Attorney General of Belize v Belize Telecom Ltd

entry |1 pages

Audi alteram partem

entry |1 pages

Austenitic

entry |1 pages

Authorised guarantee agreement (Aga)

entry |1 pages

Authorised nominating body

entry |1 pages

Authorities

entry |1 pages

Authority

entry |1 pages

AutoCad

entry |1 pages

Autoclave

entry |2 pages

Autoclaved Aerated Concrete (Aac)

entry |1 pages

Avoided loss

entry |1 pages

Award

entry |1 pages

Award of tender

chapter |18 pages

B

entry |1 pages

Back charge

entry |1 pages

Backfill, backfilling

entry |1 pages

Backflow

entry |1 pages

Background drawing

entry |1 pages

Backing ring

entry |1 pages

Backings

entry |1 pages

Back siphonage

entry |1 pages

Back-to-back contracts

entry |1 pages

Backward pass

entry |1 pages

Bad faith

entry |1 pages

Bae

entry |1 pages

Bafo

entry |1 pages

Baffle

entry |1 pages

Bagging, bag rendering

entry |1 pages

Bailey bridge

entry |1 pages

Balance of convenience

entry |1 pages

Ballast

entry |1 pages

Ballcock

entry |1 pages

Balustrade

entry |1 pages

Bank holiday

entry |1 pages

Bankruptcy

entry |1 pages

Bar chair

entry |1 pages

Bargeboard

entry |2 pages

Barograph

entry |1 pages

Barrel vault

entry |1 pages

Barrister

entry |1 pages

Bar schedule

entry |1 pages

Bas

entry |1 pages

Bascule

entry |1 pages

Baseball arbitration

entry |1 pages

Base course

entry |1 pages

Base date

entry |1 pages

Baseline adding impacts

entry |1 pages

Base rate

entry |1 pages

Batna

entry |1 pages

Bathroom pod

entry |1 pages

Batten

entry |2 pages

Battle of the forms

entry |1 pages

Bayonet Cap

entry |1 pages

Bba

entry |1 pages

Beam

entry |1 pages

Bearing capacity

entry |1 pages

Beckett's anchor

entry |1 pages

Becquerel (Bq)

entry |1 pages

Bedding

entry |1 pages

Bed joint

entry |1 pages

Benchmarking

entry |1 pages

Bending load

entry |1 pages

Bending moment

entry |1 pages

Bending schedule

entry |1 pages

Beneficiary

entry |1 pages

Berr

entry |1 pages

Bespoke contract

entry |1 pages

Bespoke system

entry |1 pages

Best endeavours

entry |1 pages

Best evidence

entry |1 pages

Betterment

entry |1 pages

Bias

entry |1 pages

Bid

entry |1 pages

Bid bond

entry |1 pages

Bid criteria

entry |1 pages

Biggin v Permanite Ltd

entry |1 pages

Billet

entry |1 pages

Bill of quantities (Bq) (BOQ)

entry |1 pages

Bill of variations

entry |1 pages

Bim

entry |1 pages

Bimetallic corrosion

entry |1 pages

Bim Maturity Levels

entry |1 pages

Bio-fouling and Corrosion Control

entry |1 pages

Biomass

entry |1 pages

Biomass gasification

entry |1 pages

Birmingham Wire Gauge (Bwg)

entry |1 pages

Bis

entry |1 pages

Bitumen

entry |1 pages

Bitumen felt

entry |1 pages

Bituminous paint

entry |1 pages

Black book

entry |1 pages

Black start

entry |1 pages

Blank panel

entry |1 pages

Blast cleaning (or Blasting)

entry |1 pages

Bleed Valve

entry |1 pages

Blinding

entry |1 pages

Blind nailing

entry |1 pages

Blistering

entry |1 pages

Block diagram

entry |1 pages

Blockmaker

entry |1 pages

Blockwork

entry |1 pages

Bloor Construction (Uk) Ltd v Bowmer and Kirkland (London) Ltd

entry |1 pages

Blow down

entry |1 pages

Blowhole, superficial void

entry |2 pages

The Blue Book

entry |1 pages

Blr

entry |1 pages

Blue pencil test

entry |1 pages

Bms

entry |1 pages

Bodkin

entry |1 pages

The Bolam test

entry |1 pages

Bona fide

entry |1 pages

Bond

entry |1 pages

Bonded screed

entry |1 pages

Bonding

entry |1 pages

Bonding agent

entry |1 pages

Bonding plaster

entry |1 pages

Bondsman

entry |1 pages

Bonus

entry |1 pages

Boom

entry |1 pages

Boot

entry |1 pages

Boot lintel

entry |1 pages

Bored piling

entry |1 pages

Bot

entry |1 pages

Bottom chord

entry |1 pages

Bottom plate

entry |1 pages

Box girder

entry |1 pages

Brace

entry |1 pages

Braced frame

entry |1 pages

Bre

entry |2 pages

Breach of contract

entry |1 pages

Breakwater

entry |1 pages

Breather membrane

entry |1 pages

Bre Environmental Assessment Method (BREEAM)

entry |1 pages

Brickbat

entry |1 pages

Brick slip (Brick Tiles, Brick Cladding)

entry |1 pages

Brick veneer

entry |1 pages

Bricklayer's scaffold (Putlog Scaffold)

entry |1 pages

Brief

entry |1 pages

Brise soleil

entry |2 pages

British Board of Agrément (Bba)

entry |1 pages

British Standards (Bs)

entry |1 pages

British Standards Institution (Bsi)

entry |1 pages

British thermal unit (Btu)

entry |1 pages

Broom-finish concrete

entry |1 pages

Brown-field site

entry |1 pages

Brushability

entry |1 pages

Brussels Convention

entry |1 pages

Bs

entry |1 pages

Bs 5606

entry |1 pages

Bsf

entry |1 pages

Bsi

entry |1 pages

Bsria

entry |1 pages

Btu, BthU

entry |1 pages

Buggeration

entry |1 pages

Buildability

entry |1 pages

Builder

entry |1 pages

Builder's line

entry |1 pages

Builder's level

entry |1 pages

Builder's Work in Connection (Bwic)

entry |1 pages

Building

entry |1 pages

Building Act 1984

entry |1 pages

Building Automation System (Bas)

entry |1 pages

Building contract

entry |1 pages

Building control

entry |1 pages

Building Control and Management System (Bcms)

entry |1 pages

Building control officer

entry |1 pages

Building employer

entry |1 pages

Building Information Modelling (Bim)

entry |1 pages

Building inspector

entry |1 pages

Building Law Reports (Blr)

entry |1 pages

Building management system (Bms)

entry |1 pages

Building Notice

entry |1 pages

Building owner

entry |1 pages

Building permit (Building Consent)

entry |1 pages

Building Regulations

entry |1 pages

Building Research Establishment (Bre)

entry |1 pages

Building Schools for the Future (Bsf)

entry |1 pages

Building survey

entry |1 pages

Building surveyor

entry |2 pages

Building Systems Integration (Bsi)

entry |1 pages

Building tolerances

entry |1 pages

Buildmark

entry |1 pages

Build, operate and transfer (Bot)

entry |1 pages

Build, own, operate and transfer (Boot)

entry |1 pages

Built-in

entry |1 pages

Built-up roofing

entry |1 pages

Bulkhead

entry |1 pages

Bullock Order

entry |1 pages

Bund

entry |1 pages

Bundle

entry |1 pages

Burden of proof

entry |1 pages

Burgundy Book

entry |1 pages

Burlap bags

entry |1 pages

Busbar

entry |1 pages

Business day

entry |1 pages

But-for test

entry |1 pages

Bwic

entry |1 pages

Byelaw

chapter |27 pages

C

entry |1 pages

Ca

entry |1 pages

Cable tray

entry |1 pages

Cad

entry |1 pages

Caisson

entry |1 pages

Calcium silicate bricks

entry |1 pages

Calderbank Offer

entry |1 pages

California Bearing Ratio (Cbr)

entry |1 pages

Call-off contract

entry |1 pages

Call on a bond

entry |1 pages

Calorifier

entry |1 pages

Candela

entry |1 pages

Canons of construction

entry |1 pages

Cantilever

entry |1 pages

Capacity

entry |1 pages

Caparo Industries v Dickman

entry |1 pages

Capillary action (Capillarity)

entry |1 pages

Capillary break

entry |1 pages

Capping

entry |1 pages

Capping strip

entry |1 pages

Carcass, Carcassing

entry |1 pages

Car policy

entry |1 pages

Casement window

entry |1 pages

Case management conference (Cmc)

entry |1 pages

Cash discount

entry |1 pages

Castellated universal section

entry |1 pages

Casting

entry |1 pages

Casting-in

entry |1 pages

Cast stone

entry |1 pages

Category A fit-out

entry |1 pages

Category B fit-out

entry |1 pages

Cat ladder

entry |1 pages

Catwalk

entry |1 pages

Caucus

entry |1 pages

Caulking

entry |1 pages

Causa causans

entry |1 pages

Causa sine qua non

entry |1 pages

Causation

entry |2 pages

Cause of action

entry |1 pages

Caveat emptor

entry |1 pages

Cavity barrier

entry |1 pages

Cavity closer

entry |1 pages

Cavity flashing

entry |1 pages

Cavity inspection

entry |1 pages

Cavity insulation

entry |1 pages

Cavity tray

entry |1 pages

Cavity wall

entry |1 pages

Caws

entry |1 pages

Cbr

entry |1 pages

De

entry |2 pages

Cdm Coordinator

entry |1 pages

Ccm

entry |1 pages

Cdm Regulations

entry |1 pages

Cdp

entry |1 pages

Cedr

entry |1 pages

Ce mark CE

entry |1 pages

Ceiling diffuser

entry |1 pages

Ceiling hangers

entry |1 pages

Ceiling insulation

entry |1 pages

Ceiling joist (Roof Joist)

entry |1 pages

Cellular concrete

entry |1 pages

Cellular construction

entry |1 pages

Cement

entry |1 pages

Cement content

entry |1 pages

Cement screed

entry |1 pages

Cen

entry |1 pages

Centre for Effective Dispute Resolution (Cedr)

entry |1 pages

Centre-to-centre

entry |1 pages

Centrifugal fan

entry |1 pages

Certainty

entry |1 pages

Certificate

entry |1 pages

Certificate of lawfulness

entry |1 pages

Certificate of making good defects

entry |1 pages

Certificate of non-completion

entry |1 pages

Certificate of Practical Completion

entry |1 pages

Certificate of service

entry |1 pages

Certifier

entry |1 pages

Certiorari

entry |1 pages

Certum est quod certum redid potest

entry |1 pages

Cessm

entry |1 pages

Cfa

entry |1 pages

C & G

entry |1 pages

Cgct

entry |1 pages

Chair

entry |1 pages

Chair rail

entry |1 pages

Chamfer

entry |1 pages

Champerty

entry |1 pages

Change

entry |1 pages

Chancery Division

entry |1 pages

Changed conditions clause

entry |1 pages

Change of use

entry |1 pages

Change order

entry |1 pages

Channel Tunnel Group v Balfour Beatty

entry |1 pages

Charging Order

entry |1 pages

Chartered builder (Mciob, FCIOB)

entry |1 pages

Chartered engineer

entry |1 pages

Chartered Institute of Arbitrators (Ciarb)

entry |1 pages

Chartered Institute of Building (Ciob)

entry |1 pages

Chartered Institute of Building Services Engineers (Cibse)

entry |1 pages

Chartered surveyor

entry |1 pages

Chase

entry |1 pages

Chatham House Rules

entry |1 pages

Chequerplate

entry |1 pages

Chiller and basics of air conditioning

entry |1 pages

Chimney breast

entry |1 pages

Chinese wall

entry |1 pages

Chippy

entry |1 pages

Choice of law

entry |1 pages

Chord

entry |1 pages

Chose in action

entry |1 pages

Chromating

entry |1 pages

Ciarb

entry |1 pages

Cibse

entry |1 pages

Cill

entry |1 pages

Cimar

entry |1 pages

Ciob

entry |1 pages

Cis

entry |1 pages

Citation

entry |1 pages

City and Guilds of London Institute (C&G)

entry |1 pages

Civil code

entry |1 pages

Civil commotion

entry |1 pages

Civil engineering

entry |1 pages

Civil law

entry |1 pages

Civil Liability (Contribution) Act 1978

entry |1 pages

Civil Procedure Rules (Cpr)

entry |1 pages

Cladding, cladding panel

entry |1 pages

Claim

entry |2 pages

Claim form

entry |1 pages

Claimant

entry |1 pages

Claims consultant

entry |1 pages

Claims made policy

entry |1 pages

Clapper bridge

entry |1 pages

Clashing

entry |1 pages

Class O

entry |1 pages

Clause 22 perils

entry |1 pages

Cleanout of wall cavities (when forbidden by method of construction)

entry |1 pages

Clear timber

entry |1 pages

Clearing and grubbing (C&G)

entry |1 pages

Clearing site

entry |1 pages

Clerestory (or clearstory)

entry |1 pages

Clerical mistake or error

entry |1 pages

Clerk of Works (Cow)

entry |1 pages

Client

entry |1 pages

Client's representative

entry |1 pages

Climbing crane

entry |1 pages

Climbing formwork (slipform)

entry |1 pages

Clinker

entry |1 pages

Clinker block (Breeze block)

entry |1 pages

Closer

entry |1 pages

Closing of excavations

entry |1 pages

Closure piece

entry |1 pages

Cmc

entry |1 pages

Cmu

entry |1 pages

Coarse aggregate

entry |1 pages

Cob

entry |1 pages

Cob

entry |1 pages

Cobie

entry |1 pages

Coco

entry |1 pages

Code of practice

entry |1 pages

Coffer

entry |1 pages

Cofferdam

entry |1 pages

Coil heating

entry |1 pages

Cold bridging

entry |1 pages

Cold roof

entry |1 pages

Collapsed as-built

entry |1 pages

Collapsible form

entry |1 pages

Collar

entry |1 pages

Collateral warranty

entry |1 pages

Collusive tendering

entry |1 pages

Colonnade

entry |1 pages

Column

entry |1 pages

Column form (Column Formwork)

entry |1 pages

Column starter

entry |1 pages

Combination boiler (Combi boiler)

entry |1 pages

Combined extract and input

entry |1 pages

Combined system (of drainage)

entry |1 pages

Combustible

entry |1 pages

Comfort index

entry |1 pages

Commencement date

entry |1 pages

Commercial Court

entry |1 pages

Commissioning

entry |1 pages

Common arrangement

entry |1 pages

Common bond (Stretcher bond)

entry |1 pages

Common brickwork

entry |1 pages

Common Carbon Metric (Ccm)

entry |1 pages

Common Data Environment (Cde)

entry |1 pages

Common law

entry |1 pages

Common mistake

entry |1 pages

Communications installation

entry |1 pages

Compaction of concrete

entry |1 pages

Companies Court

entry |1 pages

Company Voluntary Arrangement (Cva)

entry |1 pages

Comparable

entry |1 pages

Compensation event

entry |1 pages

Competitive Dialogue Procedure

entry |1 pages

Competitive tendering

entry |1 pages

Complete agreement clause

entry |1 pages

Completion

entry |1 pages

Completion date

entry |1 pages

Composite construction

entry |1 pages

Composite panel

entry |1 pages

Compound beam

entry |1 pages

Compound interest

entry |1 pages

Compression

entry |1 pages

Compromise

entry |1 pages

Compulsory winding up

entry |1 pages

Concession agreement

entry |1 pages

Conciliation

entry |1 pages

Conciliator

entry |1 pages

Conclusive evidence

entry |1 pages

Concrete

entry |1 pages

Concrete cancer

entry |1 pages

Concrete cover

entry |1 pages

Concurrent delay

entry |1 pages

Condition

entry |1 pages

Conditional fee agreement

entry |1 pages

Condition precedent

entry |1 pages

Condition subsequent

entry |1 pages

Conductance

entry |1 pages

Conductivity

entry |1 pages

Confirmation of verbal instruction (Cvi)

entry |1 pages

Conflict of laws

entry |1 pages

Con. L.R.

entry |1 pages

Conquer v Boot

entry |1 pages

Consent award

entry |1 pages

Consent order

entry |1 pages

Consequential loss

entry |1 pages

Conservation area

entry |1 pages

Consideration

entry |1 pages

Consistency

entry |1 pages

Consolidation of actions

entry |1 pages

Consortium

entry |1 pages

Const. L.J.

entry |1 pages

Constructing excellence contract

entry |1 pages

Construction Act

entry |1 pages

Construction contract

entry |2 pages

Construction (Design and Management) Regulations 2007

entry |1 pages

Construction Industry Law Letter (Cill)

entry |1 pages

Construction Industry Model Arbitration Rules (Cimar)

entry |1 pages

Construction Industry Scheme (Cis)

entry |1 pages

Construction Law Journal

entry |1 pages

Construction Law Reports

entry |1 pages

Construction management

entry |1 pages

Construction manager

entry |1 pages

Construction operations

entry |1 pages

Construction Operations Building Information Exchange (Cobie)

entry |1 pages

Construction professional

entry |1 pages

Construction Project Information Committee (Cpic)

entry |1 pages

Constructive acceleration

entry |1 pages

Constructive change order

entry |1 pages

Consultancy agreement

entry |1 pages

Consultant

entry |1 pages

Contaminated land

entry |1 pages

Contestable work

entry |1 pages

Contingency period

entry |1 pages

Contingency sum

entry |1 pages

Continuous run concreting

entry |1 pages

Contra charge

entry |1 pages

Contra item

entry |1 pages

Contra proferentem

entry |1 pages

Contract

entry |1 pages

Contract administrator

entry |1 pages

Contract bills

entry |1 pages

Contract data

entry |1 pages

Contract documents

entry |1 pages

Contract drawings

entry |1 pages

Contracting authority

entry |1 pages

Contract Notice

entry |1 pages

Contracts (Rights of Third Parties) Act 1999

entry |1 pages

Contract sum

entry |1 pages

Contract under hand

entry |1 pages

Contract under seal

entry |1 pages

Contractor

entry |1 pages

Contractor Designed Portion (Cdp)

entry |1 pages

Contractor Owned Contractor Operated

entry |1 pages

Contractor's All Risks (Car) policy

entry |1 pages

Contractor's Proposals (Cps)

entry |1 pages

Contractor's representative

entry |1 pages

Contractor's share percentages and share ranges

entry |1 pages

Contributory negligence

entry |1 pages

Convenience clause

entry |1 pages

Conversion

entry |1 pages

Conveyancing

entry |1 pages

Cooling tower

entry |1 pages

The Co-operative Insurance Society Ltd v Henry Boot Scotland Ltd

entry |1 pages

Copy-cat arbitration

entry |1 pages

Copyright

entry |1 pages

Corbel

entry |1 pages

Core

entry |1 pages

Corgi

entry |1 pages

Cornhill Insurance plc v Improvement Services Ltd

entry |1 pages

Corporate veil

entry |1 pages

Corrosion

entry |1 pages

Cor-TEN or Corten steel

entry |1 pages

Cost

entry |1 pages

Cost adjustment clause

entry |1 pages

Cost breakdown

entry |1 pages

Cost capping order

entry |1 pages

Cost contract

entry |1 pages

Cost controller

entry |1 pages

Cost engineer

entry |1 pages

Cost estimate

entry |1 pages

Cost plan

entry |1 pages

Cost-plus

entry |1 pages

Cost-plus-fixed-fee contract

entry |1 pages

Cost-plus-percentage contract

entry |1 pages

Cost reimbursable contract

entry |1 pages

Costs

entry |1 pages

Costs in the case

entry |1 pages

Costs on the indemnity basis

entry |1 pages

Costs on the standard basis

entry |1 pages

Costs reserved

entry |1 pages

Costs thrown away

entry |1 pages

Counterclaim

entry |1 pages

Counter-floor

entry |1 pages

Counter offer

entry |1 pages

Counterpart

entry |1 pages

Countersunk fixing

entry |1 pages

County court

entry |1 pages

Couple roof

entry |1 pages

Coupling, coupler

entry |1 pages

Course

entry |1 pages

Course of dealing

entry |1 pages

Court of Appeal

entry |1 pages

Court of first instance

entry |1 pages

Court of Session

entry |1 pages

Court settlement process

entry |1 pages

Cove lighting

entry |1 pages

Cover

entry |1 pages

Cover pricing

entry |1 pages

Cpa Conditions

entry |1 pages

Cps

entry |1 pages

Cpic

entry |1 pages

Cpm

entry |1 pages

Cpr

entry |1 pages

Creep

entry |1 pages

Critical activity

entry |1 pages

Critical delay

entry |1 pages

Critical path

entry |1 pages

Critical path analysis/method (Cpm)

entry |1 pages

Cross claim

entry |1 pages

Cross-examination

entry |1 pages

Cross-hatching

entry |1 pages

Crown course

entry |1 pages

Crushed aggregate

entry |1 pages

Cube test

entry |1 pages

Culpable delay

entry |1 pages

Cumulative impact claim

entry |2 pages

Curial law

entry |1 pages

Curing

entry |1 pages

Curing agent

entry |1 pages

Curing membrane

entry |1 pages

Curtain wall

entry |1 pages

Custom and usage

entry |1 pages

Cut and fill

entry |1 pages

Cva

entry |1 pages

C-value

entry |1 pages

Cvi

entry |1 pages

Cyclical movement

chapter |16 pages

D

entry |1 pages

Dabs

entry |1 pages

Dado

entry |1 pages

Dado rail

entry |1 pages

Dado trunking

entry |1 pages

Daily rates

entry |1 pages

Damage limitation clause

entry |1 pages

Damages

entry |1 pages

Damp-proof course (dpc)

entry |1 pages

Damp-proof course brick

entry |1 pages

Damp-proof membrane (Dpm)

entry |1 pages

Damp-proofing

entry |1 pages

Data drop

entry |1 pages

Data Logger

entry |1 pages

Data protection

entry |1 pages

Date for completion

entry |1 pages

Date of possession

entry |1 pages

Daubert Guidelines

entry |1 pages

Day

entry |1 pages

Day joint

entry |1 pages

Dayworks

entry |1 pages

Db

entry |1 pages

Dba

entry |1 pages

Dbo

entry |1 pages

Death

entry |1 pages

Death-watch beetle

entry |1 pages

De bene esse

entry |1 pages

Debenture

entry |1 pages

Debriefing

entry |1 pages

Debt

entry |1 pages

Decc

entry |1 pages

Deceit

entry |2 pages

Decibel (dB)

entry |1 pages

Decision

entry |1 pages

Decking

entry |1 pages

Declaration

entry |1 pages

Decommissioning

entry |1 pages

Decontamination

entry |1 pages

Decrement delay

entry |1 pages

Deduction

entry |1 pages

Deed

entry |1 pages

Deep-plan building

entry |1 pages

De facto

entry |1 pages

Default

entry |2 pages

Default notice or Default payment notice

entry |1 pages

Defect

entry |1 pages

Defect action period

entry |1 pages

Defective Premises Act (Dpa)

entry |1 pages

Defects certificate

entry |1 pages

Defects liability period (Dlp)

entry |1 pages

Defence

entry |1 pages

Defence and counterclaim

entry |1 pages

Defence of tender before claim

entry |1 pages

Defence to counterclaim

entry |1 pages

Defendant

entry |1 pages

Defender

entry |1 pages

Defined cost

entry |1 pages

Delay

entry |1 pages

Delay analysis

entry |1 pages

Delay and disruption claim

entry |1 pages

Delay damages

entry |1 pages

Delegated legislation

entry |1 pages

Delegation of authority

entry |1 pages

Delegatus non potest delegare

entry |1 pages

Deleterious materials

entry |2 pages

Deletion

entry |1 pages

Deliverable

entry |1 pages

Delivery up

entry |1 pages

De minimis

entry |1 pages

De minimis non curat lex

entry |1 pages

Demolition

entry |1 pages

Demountable partition

entry |1 pages

Department for Business Enterprise and Regulatory Reform (Berr)

entry |1 pages

Department for Business Innovation and Skills (Bis)

entry |1 pages

Department for Energy and Climate Change (Decc)

entry |1 pages

Department of Trade and Industry (Dti)

entry |1 pages

Deposition

entry |1 pages

Derogation

entry |1 pages

Derogatory treatment

entry |1 pages

Design

entry |1 pages

Design and access statement

entry |1 pages

Design and build contract

entry |1 pages

Design and build procurement

entry |1 pages

Design build finance manage (Dbfm)

entry |1 pages

Design build finance operate (Dbfo)

entry |1 pages

Design build operate (Dbo)

entry |1 pages

Design life

entry |1 pages

Designer

entry |1 pages

Detail

entry |1 pages

Detail drawings

entry |1 pages

Determination

entry |1 pages

Determination of costs

entry |1 pages

Developer

entry |1 pages

Dhw

entry |2 pages

Diaphragm wall

entry |1 pages

Dickinson v Dodds

entry |1 pages

Differential settlement

entry |1 pages

Digger

entry |1 pages

Dilapidation

entry |1 pages

Diligence

entry |1 pages

Dimension

entry |1 pages

Diminishing courses

entry |1 pages

Diminution in value

entry |1 pages

Direct loss and/or expense

entry |1 pages

Direct payment

entry |1 pages

Direct supply

entry |1 pages

Directions

entry |1 pages

Disabled facilities

entry |1 pages

Discharge

entry |1 pages

Discharge valve, regulating valve

entry |1 pages

Disclaimer

entry |1 pages

Disclosure

entry |1 pages

Discontinuance

entry |1 pages

Discount

entry |1 pages

Discovery

entry |1 pages

Discretion

entry |2 pages

Dispute

entry |1 pages

Dispute Board (Db) or Dispute Adjudication Board (DAB)

entry |1 pages

Dispute escalation clause

entry |1 pages

Dispute resolution board (Drb)

entry |1 pages

Disruption

entry |1 pages

Distress and Inconvenience

entry |1 pages

District surveyor

entry |1 pages

Documents

entry |1 pages

DoE

entry |1 pages

Dog-leg stair

entry |1 pages

Domestic hot water (Dhw)

entry |1 pages

Domestic subcontractor

entry |1 pages

Dominant cause

entry |1 pages

Door schedule

entry |1 pages

Dormer head

entry |1 pages

Dormer window

entry |1 pages

Dot and dab fixing

entry |1 pages

Dots and screeds

entry |1 pages

Double curvature

entry |1 pages

Double-decker lift

entry |1 pages

Double glazing

entry |1 pages

Double-leaf separating wall

entry |1 pages

Double-lock welt

entry |1 pages

Dovetail

entry |1 pages

Dowel bar

entry |1 pages

Downlighter

entry |1 pages

Downpipe

entry |1 pages

Downstand beam

entry |1 pages

Dpc

entry |1 pages

Dpm

entry |1 pages

Drain pipe

entry |1 pages

Drained and ventilated joint

entry |1 pages

Drained cavity

entry |1 pages

Draw cable

entry |1 pages

Drawing register

entry |1 pages

Drawing scale

entry |1 pages

Drb

entry |1 pages

Drbf

entry |1 pages

Dress

entry |1 pages

Dressed dimension

entry |1 pages

Dressings

entry |1 pages

D-ring

entry |1 pages

Drip

entry |1 pages

Drip edge

entry |1 pages

Drop apron

entry |1 pages

Drop ceiling

entry |1 pages

Dry construction

entry |1 pages

Dry joint

entry |1 pages

Dry lining

entry |1 pages

Dry masonry

entry |1 pages

Dry partition

entry |1 pages

Dry riser

entry |1 pages

Dry rot

entry |1 pages

Dry sprinkler

entry |1 pages

Dry trades

entry |1 pages

Dry wall

entry |1 pages

Drying-out

entry |1 pages

Dry-pack mortar

entry |1 pages

Dti

entry |1 pages

Dubbing-out

entry |1 pages

Dubitante

entry |2 pages

Duct air duct:

entry |1 pages

Ductwork

entry |1 pages

Due diligence

entry |1 pages

Duress

entry |1 pages

Duty of care

entry |1 pages

Dwang

entry |1 pages

Dwarf wall

entry |1 pages

Dwelling

entry |1 pages

Dynamic purchasing system

chapter |18 pages

E

entry |1 pages

Early Neutral Evaluation (Ene)

entry |1 pages

Early warning

entry |1 pages

Early Warning Notice (Ewn)

entry |1 pages

Earned value

entry |1 pages

Earth electrode

entry |1 pages

Earth stake

entry |1 pages

Earth termination

entry |1 pages

Earthing

entry |1 pages

Easement

entry |1 pages

East Ham Corporation v Sunley (Bernard) & Son Ltd

entry |1 pages

Eaves

entry |1 pages

Eaves gutter

entry |1 pages

Eaves soffit

entry |1 pages

Eaves vent

entry |1 pages

Ecj

entry |1 pages

Economic duress

entry |1 pages

Economic Loss

entry |1 pages

Edge beam

entry |1 pages

Efficient breach

entry |1 pages

Efflorescence

entry |1 pages

Egan Report

entry |1 pages

Eggshell

entry |1 pages

Eggshell skull rule

entry |1 pages

Eia

entry |1 pages

Eichleay formula

entry |1 pages

Ei incumbit probatio qui dicit, non qui negat

entry |1 pages

Ej

entry |1 pages

Ejusdem generis

entry |1 pages

Elastic design

entry |1 pages

Elbow, knee

entry |3 pages

Election

entry |1 pages

Electrical riser

entry |1 pages

Electrical services

entry |1 pages

Electrostatic discharge (Esd)

entry |1 pages

Elemental bills of quantities

entry |1 pages

Elephant

entry |1 pages

Elephant's feet

entry |1 pages

Elevation

entry |1 pages

Elps

entry |2 pages

Emden formula

entry |1 pages

Emergency power systems (Eps)

entry |1 pages

Employer

entry |1 pages

Employer's Agent

entry |1 pages

Employer's Representative

entry |1 pages

Employer's requirements (Ers)

entry |1 pages

Emulsion paint

entry |1 pages

Enabling works

entry |1 pages

Enamel paint

entry |1 pages

Encasement

entry |1 pages

Enclosed stage

entry |1 pages

End bearing length

entry |1 pages

End grain

entry |1 pages

End joint

entry |1 pages

Ene

entry |2 pages

Enforcement

entry |1 pages

Enforcement notice

entry |1 pages

Engineer

entry |1 pages

Engineering brick

entry |1 pages

Engineering Council

entry |1 pages

Engineering, Procurement, Construction (Epc)

entry |1 pages

English bond

entry |2 pages

Entire agreement clause

entry |1 pages

Entire completion

entry |1 pages

Entire contract

entry |1 pages

Entresol

entry |1 pages

Envelope

entry |1 pages

Environment Agency (Ea)

entry |1 pages

Environmental impact assessment (Eia)

entry |1 pages

E&Oe

entry |1 pages

Eot

entry |1 pages

Epc

entry |1 pages

E-procurement

entry |1 pages

Epoxy mortar

entry |1 pages

Epoxy paint

entry |1 pages

Eps

entry |1 pages

Equitable set-off

entry |1 pages

Equity

entry |1 pages

Equity clause

entry |1 pages

Equivalent temperature

entry |1 pages

Erection All Risks

entry |1 pages

Error

entry |1 pages

Ers

entry |1 pages

Escrow

entry |1 pages

Escutcheon

entry |1 pages

Esd

entry |1 pages

Estimate

entry |1 pages

Estoppel

entry |1 pages

Ethylene tetra fluoroethylene (Etfe)

entry |1 pages

Eurocode (Ec)

entry |1 pages

European Commission

entry |1 pages

European Committee for Standardisation (Cen)

entry |1 pages

European Standard, Euronorm (En)

entry |1 pages

Eurotunnel v Tml

entry |1 pages

Evaluative mediation

entry |1 pages

The Event Safety Guide (“The Purple Guide”)

entry |1 pages

Evidence

entry |1 pages

Evidence-in-chief

entry |1 pages

Evoh

entry |1 pages

Ewca

entry |1 pages

Ewhc

entry |1 pages

Ewn

entry |1 pages

Ex aequo et bono

entry |1 pages

Ex gratia

entry |1 pages

Ex officio

entry |1 pages

Ex parte

entry |1 pages

Examination-in-Chief

entry |1 pages

Excavation

entry |1 pages

Excepted Risk

entry |1 pages

Exceptionally adverse weather conditions

entry |1 pages

Excess

entry |1 pages

Excess spoil

entry |2 pages

Exclusion clause

entry |1 pages

Execution against goods

entry |1 pages

Executory contract

entry |1 pages

Exemplary damages

entry |1 pages

Exemption clause

entry |1 pages

Exhibit

entry |1 pages

Expanded polystyrene (Eps)

entry |1 pages

Expanded Pvc

entry |1 pages

Expansion joint (Ej)

entry |1 pages

Expedition

entry |1 pages

Expense

entry |1 pages

Expert

entry |1 pages

Expert determination

entry |1 pages

Expert witness

entry |1 pages

Experts' joint statement

entry |1 pages

Experts' meetings

entry |2 pages

Experts protocol

entry |1 pages

Experts' reports

entry |1 pages

Exposed aggregate finish

entry |1 pages

Expressio eorum quae tacite instunt nihil operator

entry |1 pages

Expressio unius est exclusio alterius

entry |1 pages

Express terms

entry |1 pages

Extended preliminaries

entry |1 pages

Extended price

entry |2 pages

Extension of time (Eot)

entry |1 pages

Exterior plywood

entry |1 pages

External insulation

entry |1 pages

External leaf

entry |1 pages

External wall

entry |1 pages

External works

entry |1 pages

Extra contractual

entry |1 pages

Extra over

entry |1 pages

Extra work, extras

entry |1 pages

Extractor fan

entry |1 pages

Extrinsic evidence

entry |1 pages

Extruded brick

entry |1 pages

Extruded section

entry |1 pages

Eyebar

chapter |12 pages

F

entry |1 pages

Fabric

entry |1 pages

Fabrication

entry |1 pages

Fabrication drawings

entry |1 pages

Fabric reinforcement

entry |1 pages

Façade

entry |1 pages

Façade retention

entry |1 pages

Face bedding

entry |1 pages

Face mark

entry |1 pages

Facework

entry |1 pages

Facilitative mediation

entry |1 pages

Facilities management (Fm)

entry |1 pages

Facility

entry |1 pages

Facing brick

entry |1 pages

Fact

entry |1 pages

Factor of safety (Fs)

entry |1 pages

Factory Acceptance Test (Fat)

entry |1 pages

Fact sensitive

entry |1 pages

Factual matrix

entry |1 pages

Failure to complete

entry |1 pages

Fair-face(d) concrete

entry |1 pages

Fair valuation

entry |1 pages

Fall

entry |1 pages

Fall pipe

entry |1 pages

Falsa demonstratio non nocet cum de corpore constat

entry |1 pages

False attribution

entry |1 pages

False ceiling

entry |1 pages

Fan coil unit

entry |1 pages

Fascia, fascia board

entry |1 pages

Fast track

entry |1 pages

Fat

entry |1 pages

Feasibility study

entry |1 pages

Federated models

entry |1 pages

Federation Internationale des Ingenieurs-Conseils (Fidic)

entry |1 pages

Federation of Master Builders (Fmb)

entry |1 pages

Feed

entry |1 pages

Feed In Tariff (Fit)

entry |1 pages

Feedback loop

entry |1 pages

Feltwork

entry |1 pages

Fenestration

entry |1 pages

Ferroconcrete

entry |1 pages

Ferrule

entry |1 pages

Ffe

entry |1 pages

Ffl

entry |1 pages

Fibreboard

entry |1 pages

Fibre cement board

entry |1 pages

Fibreglass

entry |1 pages

Fibre-reinforced concrete (Frc)

entry |2 pages

Fibre saturation point

entry |1 pages

Fibrous plaster

entry |1 pages

Fidic

entry |1 pages

Fidic forms of contract

entry |1 pages

Fiduciary interest

entry |1 pages

Fieri facias

entry |1 pages

Fi fa

entry |1 pages

Final account

entry |2 pages

Final certificate

entry |1 pages

Final completion

entry |1 pages

Final statement

entry |1 pages

Finance charges

entry |1 pages

Fine aggregate

entry |1 pages

Finger plate

entry |1 pages

Finished floor level (Ffl)

entry |1 pages

Finishing coat

entry |1 pages

Finish-to-finish relationship

entry |1 pages

Finish-to-start relationship

entry |1 pages

Fire

entry |1 pages

Fire damper

entry |1 pages

Fire protection

entry |1 pages

Fire stopping

entry |1 pages

Firm price

entry |1 pages

Firring piece

entry |1 pages

First fix or fixing

entry |1 pages

Fishing expedition

entry |2 pages

Fitness for habitation

entry |1 pages

Fitness for purpose

entry |1 pages

Fixed charge

entry |1 pages

Fixed light

entry |1 pages

Fixed overheads

entry |1 pages

Fixed price

entry |1 pages

Fixing strip

entry |1 pages

Flange

entry |1 pages

Flank wall

entry |1 pages

Flashing

entry |1 pages

Flat roof

entry |1 pages

Flaunching

entry |1 pages

Flemish Bond

entry |1 pages

Fletton

entry |2 pages

Float

entry |1 pages

Floating charge

entry |1 pages

Floating floor

entry |1 pages

Floor box

entry |1 pages

Fluctuations clause

entry |1 pages

Flush

entry |1 pages

Foia

entry |1 pages

Footing

entry |1 pages

Forbearance

entry |2 pages

Force majeure

entry |1 pages

Foreseeability

entry |1 pages

Forfeiture clause

entry |1 pages

Formalities

entry |1 pages

Form of tender

entry |1 pages

Formula price adjustment

entry |1 pages

Formwork

entry |1 pages

Forum shopping

entry |1 pages

Fossils

entry |1 pages

Foundation

entry |1 pages

Fragnets

entry |1 pages

Framework Agreement

entry |1 pages

Fraudulent Misrepresentation

entry |1 pages

Freeboard bridge

entry |1 pages

Free float

entry |1 pages

Freezing injunction

entry |1 pages

Frieze

entry |1 pages

Frog

entry |1 pages

Front End Engineering Design (Feed)

entry |1 pages

Front loading

entry |1 pages

Frustration

entry |1 pages

Full planning permission

entry |1 pages

Functus officio

entry |2 pages

Fundamental breach

entry |1 pages

Furring strip

chapter |9 pages

G

entry |1 pages

Ga

entry |1 pages

Gabion

entry |1 pages

Gable

entry |1 pages

Gable board

entry |1 pages

Gable post

entry |1 pages

Gable roof

entry |1 pages

Gable springer

entry |1 pages

Gable wall

entry |1 pages

Gaffer

entry |1 pages

Galvanising

entry |1 pages

Gang

entry |1 pages

Gang form

entry |1 pages

Gantt chart

entry |1 pages

Garnishee proceedings

entry |1 pages

Gas concrete

entry |1 pages

Gas Safe Register

entry |1 pages

Gauged mortar

entry |1 pages

Gbg

entry |1 pages

Gc/Works

entry |1 pages

Gea

entry |1 pages

General conditions

entry |1 pages

General contractor

entry |1 pages

General damages

entry |1 pages

General Permitted Development Order (Gpdo)

entry |1 pages

Georgian wired glass

entry |1 pages

Geotechnical report

entry |1 pages

Ghg

entry |1 pages

Girder

entry |1 pages

Girder truss

entry |1 pages

Glassfibre-reinforced gypsum (Grg)

entry |1 pages

Glassfibre-reinforced plastic, fibreglass (Grp)

entry |1 pages

Glass(fibre)-reinforced concrete (Grc)

entry |1 pages

Glazing

entry |1 pages

Glazing bead

entry |1 pages

Glazing fillet

entry |1 pages

Global claim

entry |1 pages

Glued-laminated timber

entry |1 pages

Glulam

entry |1 pages

Gmp

entry |1 pages

Goco

entry |1 pages

Going

entry |1 pages

Gold Book Fidic

entry |1 pages

Golden rule

entry |1 pages

Good Building Guides (Gbg)

entry |1 pages

Good faith

entry |1 pages

Good Practice in Selection of Construction Materials

entry |1 pages

Good and workmanlike manner

entry |1 pages

Goods and materials

entry |1 pages

Governing law

entry |1 pages

Government owned, contractor operated (Goco)

entry |1 pages

Gpdo

entry |1 pages

Grade

entry |1 pages

Grc

entry |1 pages

Grandfather clause

entry |1 pages

Grand master key

entry |1 pages

Granular fill

entry |1 pages

Graphic work

entry |1 pages

Grass concrete

entry |1 pages

Green Book

entry |1 pages

Green concrete

entry |1 pages

Greenfield site

entry |1 pages

Green form

entry |1 pages

Green Guide

entry |1 pages

Greenhouse effect

entry |1 pages

Green timber

entry |1 pages

Grid

entry |1 pages

Grid line

entry |1 pages

Gripper strip

entry |1 pages

Groin vault

entry |1 pages

Gross external area (Gea)

entry |1 pages

Gross features

entry |1 pages

Gross floor area

entry |1 pages

Ground conditions

entry |2 pages

Ground investigation

entry |1 pages

Ground level

entry |1 pages

Ground plate

entry |1 pages

Ground sill

entry |1 pages

Ground slab

entry |1 pages

Groundwork

entry |1 pages

Grout, grouting

entry |1 pages

Groyne

entry |1 pages

Grp

entry |1 pages

Guarantee (1)

entry |1 pages

Guaranteed costs contract

entry |2 pages

Guaranteed maximum price (Gmp)

entry |1 pages

Guidance notes

entry |1 pages

Guide rails

entry |1 pages

Guide to Safety at Sports Grounds (“Green Guide”)

entry |1 pages

Gully, gulley

entry |1 pages

Gunmetal

entry |1 pages

Gusset plate or piece

entry |1 pages

Gypsum

entry |1 pages

Gypsum plasterboard

entry |1 pages

Gypsum wallboard

chapter |9 pages

H

entry |1 pages

Ha

entry |1 pages

Ha

entry |1 pages

Ha-ha

entry |1 pages

Habitation

entry |1 pages

Hadley v Baxendale

entry |1 pages

Half landing

entry |1 pages

Half-hour fire door

entry |1 pages

Halsey Guidelines

entry |1 pages

Hammerhead crane

entry |1 pages

Hancock v Brazier terms

entry |1 pages

Handover, handing over

entry |1 pages

Hangar

entry |1 pages

Hanger

entry |1 pages

Hansard

entry |1 pages

Hard landscaping

entry |1 pages

Hardboard

entry |1 pages

Hardcore

entry |1 pages

Hardwood

entry |1 pages

Haunching

entry |1 pages

Hazid

entry |1 pages

Hazop

entry |1 pages

Head contract

entry |2 pages

Head office overheads

entry |1 pages

Header

entry |1 pages

Heading bond

entry |1 pages

Heading course

entry |1 pages

Headroom

entry |1 pages

Health and Safety at Work, etc. Act 1974

entry |1 pages

Health and Safety Executive (Hse)

entry |1 pages

Health and safety file

entry |1 pages

Health and safety plan

entry |1 pages

Hearsay

entry |1 pages

Heat detector

entry |1 pages

Heat exchanger

entry |1 pages

Heating coil

entry |1 pages

Heat loss

entry |1 pages

Heat of hydration

entry |1 pages

Heat pump

entry |1 pages

Heat recovery/Mvrh

entry |1 pages

Heat-transmission value

entry |1 pages

Hedley Byrne duty

entry |1 pages

Heel

entry |1 pages

Helibar ties

entry |1 pages

Henry Boot Construction v Alstom Combined Cycles Ltd

entry |1 pages

Heras fencing

entry |1 pages

Herring-bone strutting

entry |1 pages

H-frame tower

entry |1 pages

Hgcra

entry |1 pages

Hickman & Co v Roberts

entry |2 pages

High Court

entry |1 pages

High-pressure hot water (Hphw)

entry |1 pages

Highways Agency

entry |1 pages

Hindrance

entry |1 pages

Hip rafter

entry |1 pages

Hip truss

entry |1 pages

Hip, hip ridge

entry |1 pages

Hip(ped) roof

entry |1 pages

Hit and miss

entry |1 pages

Hmrc

entry |1 pages

Hoarding

entry |1 pages

Hoist

entry |1 pages

Holdback

entry |1 pages

Holding-down bolt

entry |1 pages

Hollow block

entry |1 pages

Hollow brick

entry |1 pages

Hollow tile

entry |1 pages

Hollow wall

entry |1 pages

Hollow-core door

entry |1 pages

Honeycomb bond

entry |1 pages

Honeycomb core door

entry |1 pages

Honeycomb fire damper

entry |1 pages

Honeycombing

entry |1 pages

Hopper

entry |2 pages

Hostilities

entry |1 pages

Hot tubbing

entry |1 pages

Hot work

entry |1 pages

House of Lords

entry |1 pages

House wrapping

entry |1 pages

Housing Association

entry |2 pages

Housing Corporation

entry |1 pages

Housing Grants, Construction and Regeneration Act (Hgcra)

entry |1 pages

Hphw

entry |1 pages

Hrsg

entry |1 pages

Hse

entry |1 pages

Hudson formula

entry |1 pages

Hudson or Hudson's Building and Engineering Contracts

entry |2 pages

Human Rights Act

entry |1 pages

Hurry-up notice

entry |1 pages

Hvac

entry |1 pages

Hvotl

entry |1 pages

Hydration

entry |1 pages

Hydraulic lift

entry |1 pages

Hygroscopic salts

entry |1 pages

Hypalon (cspe)

entry |1 pages

Hyperbolic paraboloid

chapter |10 pages

I

entry |1 pages

Ibc

entry |1 pages

iBim

entry |1 pages

Icc

entry |1 pages

Icd

entry |1 pages

Ice

entry |1 pages

Ice 6

entry |1 pages

Ice 7

entry |1 pages

Ice conditions

entry |1 pages

IchemE

entry |1 pages

IchemE Burgundy Book

entry |1 pages

IchemE Green Book

entry |1 pages

IchemE Red Book

entry |1 pages

Iee

entry |1 pages

Iee wiring regulations

entry |1 pages

Ifc

entry |1 pages

Ifc 84

entry |1 pages

If contract

entry |1 pages

Ikarian Reefer

entry |2 pages

Illegality

entry |1 pages

Impacted as-planned

entry |1 pages

Impartiality

entry |1 pages

Implied contract

entry |1 pages

Implied term

entry |2 pages

Impossibility

entry |1 pages

Impost

entry |1 pages

Incertum

entry |1 pages

Inclement weather

entry |1 pages

Inclusive price principle

entry |1 pages

Inconvenience

entry |1 pages

Incorporation of documents or terms

entry |1 pages

Incoterms

entry |1 pages

Indemnitee

entry |1 pages

Indemnitor

entry |1 pages

Indemnity

entry |2 pages

Indemnity basis

entry |1 pages

Independent contractor

entry |1 pages

Indirect or consequential loss

entry |1 pages

Individual Voluntary Arrangement (Iva)

entry |1 pages

Industry Foundation Classes (Ifc)

entry |1 pages

Ineffectiveness

entry |1 pages

Infill

entry |1 pages

Information exchange

entry |1 pages

Infra

entry |1 pages

Inglenook

entry |1 pages

Initial notice

entry |1 pages

Injection damp course

entry |1 pages

Injunction

entry |1 pages

Inner House

entry |1 pages

Innocent misrepresentation

entry |1 pages

Innominate term

entry |1 pages

In re

entry |1 pages

In-situ concrete

entry |1 pages

Insolvency

entry |1 pages

Inspection

entry |1 pages

Inspection chamber

entry |2 pages

Institution of Chemical Engineers (IchemE)

entry |1 pages

Institution of Civil Engineers (Ice)

entry |1 pages

Institution of Electrical Engineers (Iee)

entry |1 pages

Institution of Engineering and Technology (Iet)

entry |1 pages

Institution of Structural Engineers

entry |1 pages

Instruction

entry |1 pages

Instructions to tenderers

entry |1 pages

Instrument

entry |1 pages

Insurable interest

entry |1 pages

Insurance

entry |1 pages

Integrated Bim (iBIM)

entry |2 pages

Integrated project team (Ipt)

entry |1 pages

Intelligent building, smart building

entry |1 pages

Intention to create legal relations

entry |1 pages

Intention to rebuild

entry |1 pages

Inter alia

entry |1 pages

Intercepting trap, interceptor

entry |1 pages

Interdict

entry |1 pages

Interest

entry |1 pages

Interface documents

entry |1 pages

Interference

entry |1 pages

Interim award

entry |1 pages

Interim certificate

entry |1 pages

Interim payment

entry |1 pages

Interim remedy

entry |1 pages

Interlocutory

entry |1 pages

Intermediate Building Contract (Ic and ICD)

entry |1 pages

Intermediate Form of Contract (Ifc)

entry |1 pages

Intermediate rafter

entry |1 pages

International Chamber of Commerce (Icc)

entry |1 pages

International Federation of Consulting Engineers

entry |1 pages

International Institute for the Unification of Private Law

entry |1 pages

International Organization for Standardization (Iso)

entry |1 pages

International SfB

entry |1 pages

In terrorem

entry |1 pages

Interstitial condensation

entry |1 pages

Intrados

entry |1 pages

Intramural

entry |1 pages

Intumescence

entry |1 pages

Inverted roof

entry |1 pages

Investors Compensation Scheme Ltd v West Bromwich Building Society

entry |1 pages

Invitation to negotiate

entry |1 pages

Invitation to tender

entry |1 pages

Invitation to treat

entry |1 pages

Ipso facto

entry |1 pages

Ipso jure

entry |1 pages

Ipt

entry |1 pages

Iroko

entry |1 pages

Iso

entry |1 pages

Iso 216

entry |1 pages

Iso 9001:2008

entry |1 pages

Iso 14001

entry |1 pages

Isolator

entry |1 pages

Isometric drawing

entry |1 pages

Isotropic

entry |1 pages

Issued for Construction (Ifc)

entry |1 pages

Itb

entry |1 pages

Itn

entry |1 pages

Itt

entry |1 pages

Iva

chapter |6 pages

J

entry |1 pages

J

entry |1 pages

Jackleg cabin

entry |1 pages

Jack rafter

entry |1 pages

Jamb

entry |1 pages

Japanese knotweed

entry |1 pages

Jct

entry |1 pages

Jct form of contract

entry |1 pages

Jct suite of contracts

entry |1 pages

Jct 63

entry |1 pages

Jct 80

entry |1 pages

Jct 98

entry |1 pages

Jct 05

entry |1 pages

Jct 2011

entry |1 pages

Jib

entry |2 pages

John Doyle Construction Ltd v Laing Management

entry |1 pages

Joinder

entry |1 pages

Joiner

entry |1 pages

Joinery

entry |1 pages

Joint Contracts Tribunal (Jct)

entry |1 pages

Joint Fire Code

entry |1 pages

Joint Iiability

entry |1 pages

Joint reinforcement

entry |1 pages

Joint runner

entry |1 pages

Joint and several liability

entry |1 pages

Joint tape

entry |1 pages

Joint tortfeasors

entry |1 pages

Joint venture

entry |1 pages

Joist

entry |1 pages

Joist hanger

entry |1 pages

Joist trimmer

entry |2 pages

Judge

entry |1 pages

Judgment

entry |1 pages

Judgment creditor

entry |1 pages

Judgment debt

entry |1 pages

Judgment debtor

entry |1 pages

Judgment in default

entry |1 pages

Judicial Committee

entry |1 pages

Judicial notice

entry |1 pages

Judicial precedent

entry |1 pages

Judicial review

entry |1 pages

Jump form

entry |1 pages

Jurat

entry |1 pages

Jurisdiction

entry |2 pages

Jurisdictional challenge

entry |1 pages

Jurisdictional error

entry |1 pages

Jv

chapter |2 pages

K

entry |1 pages

Keating on Construction Contracts

entry |1 pages

Key performance indicator

entry |1 pages

Key plan

entry |1 pages

Key plate

entry |1 pages

Keyed joints

entry |1 pages

Keying

entry |1 pages

Keystone

entry |1 pages

Kick plate

entry |1 pages

Kicker

entry |1 pages

Kicker frame

entry |1 pages

Kiln-dried timber

entry |1 pages

Kiss mark

entry |1 pages

Kitemark

entry |1 pages

Knee brace

entry |1 pages

Knee, elbow

entry |1 pages

Knock-on effects

entry |1 pages

Knowledge

entry |1 pages

Kompetenz-kompetenz

entry |1 pages

Kpi

entry |1 pages

Kraft paper

entry |1 pages

K-value

chapter |9 pages

L

entry |1 pages

Labour

entry |1 pages

Labour constant

entry |1 pages

Labour-only subcontractor

entry |1 pages

Laches

entry |1 pages

Lack of cover

entry |1 pages

Lacquer

entry |1 pages

Lads

entry |1 pages

Lady Justice

entry |1 pages

Lagging

entry |1 pages

Laid to fall

entry |1 pages

Laitance

entry |1 pages

Laminate

entry |1 pages

Laminated glass

entry |1 pages

Laminated plasterboard

entry |1 pages

Laminated wood

entry |1 pages

Lands Tribunal

entry |1 pages

Lap joint

entry |1 pages

Lapse of offer

entry |1 pages

Latent damage

entry |1 pages

Latent Damage Act

entry |1 pages

Latent defect

entry |1 pages

Latham Report

entry |1 pages

Law Lord

entry |1 pages

Law Report

entry |1 pages

Laxton's Building Price Book

entry |1 pages

Layout

entry |1 pages

Lcia

entry |1 pages

Lcj

entry |1 pages

Ldedc or LDEDCA

entry |1 pages

Ldf

entry |1 pages

Lead flashing

entry |1 pages

Leaded light

entry |1 pages

Leading question

entry |1 pages

Leads and lags

entry |1 pages

Leaf

entry |1 pages

Lean mix

entry |1 pages

Lean to roof

entry |1 pages

Learning curve

entry |1 pages

Legal set-off

entry |1 pages

Legal time

entry |1 pages

Letter of acceptance

entry |1 pages

Letter of intent

entry |1 pages

Level 2 Bim

entry |1 pages

Level 3 Bim

entry |1 pages

Lex arbitri

entry |1 pages

Lex fori

entry |1 pages

Liability

entry |1 pages

Libid

entry |1 pages

Libor

entry |2 pages

Lien

entry |1 pages

Life cycle

entry |1 pages

Life cycle cost analysis

entry |1 pages

Lift

entry |1 pages

Lifting the corporate veil

entry |1 pages

Light

entry |1 pages

Lightweight aggregate

entry |1 pages

Limitation

entry |1 pages

Limited company

entry |1 pages

Limited liability partnership (Llp)

entry |1 pages

Line of balance

entry |1 pages

Linear thermal bridge

entry |1 pages

Lintel, lintol

entry |1 pages

Liquidated and ascertained damages (Lads)

entry |1 pages

Liquidated damages

entry |1 pages

Liquidated demand

entry |1 pages

Liquidation

entry |1 pages

Liquidator

entry |1 pages

Lis

entry |1 pages

Listed building

entry |1 pages

Lj

entry |1 pages

Ljj

entry |1 pages

Lloyd's Rep

entry |1 pages

Llp

entry |1 pages

Load-bearing wall

entry |1 pages

Load factor

entry |1 pages

Local Democracy, Economic Development and Construction Act 2009 (Ldedc or LDEDCA)

entry |1 pages

Location plan

entry |1 pages

Local Development Framework (Ldf)

entry |1 pages

Lock out

entry |1 pages

Lockshield valve

entry |1 pages

Locus sigilli (Ls)

entry |1 pages

Loi

entry |1 pages

London stock

entry |1 pages

Lonely Bim

entry |1 pages

Lord Chancellor

entry |1 pages

Lord Chief Justice

entry |1 pages

Lord Justice

entry |1 pages

Lord Ordinary

entry |1 pages

Loss and/or expense

entry |1 pages

Loss of productivity

entry |1 pages

Loss of profit

entry |1 pages

Louvers, Louvres

entry |1 pages

Lowest price

entry |1 pages

Luminaire

entry |1 pages

Lump sum contract

chapter |12 pages

M

entry |1 pages

M&E

entry |1 pages

M&O

entry |1 pages

Macob Civil Engineering Ltd v Morrison Construction Ltd

entry |1 pages

Made ground

entry |1 pages

Main contract

entry |1 pages

Main contractor

entry |1 pages

Main Contractor's Discount (Mcd)

entry |1 pages

Main services duct

entry |1 pages

Main stop valve

entry |1 pages

Mains supply

entry |1 pages

Mains voltage

entry |1 pages

Maintenance period

entry |1 pages

Major Project Construction Contract

entry |1 pages

Make-up

entry |1 pages

Mala fides

entry |1 pages

Management contract

entry |1 pages

Management time

entry |1 pages

Mandatory provision

entry |2 pages

Manhole

entry |1 pages

Manifest error

entry |1 pages

Manifestation

entry |1 pages

Manipulative interpretation

entry |1 pages

Mansard roof

entry |1 pages

Mareva injunction

entry |1 pages

Masonry

entry |1 pages

Master

entry |1 pages

Master key

entry |1 pages

Master programme

entry |1 pages

Mastic

entry |1 pages

Material change

entry |1 pages

Material circumstances

entry |1 pages

Materials

entry |1 pages

Materials available

entry |1 pages

Matrix

entry |1 pages

Matrix of fact

entry |1 pages

Mcd

entry |1 pages

Mdb

entry |1 pages

Mdf

entry |1 pages

Mdp

entry |1 pages

Mean radiant temperature (Mrt)

entry |2 pages

Meaning of words

entry |1 pages

Measured mile

entry |1 pages

Measurement

entry |1 pages

Measurement and value contract

entry |1 pages

Meat

entry |1 pages

Mechanical completion

entry |1 pages

Mechanical engineer

entry |1 pages

Mechanical ventilation

entry |1 pages

Mechanics' lien

entry |1 pages

Med-Arb

entry |2 pages

Mediation

entry |1 pages

Mediator

entry |1 pages

Medium-density fibreboard (Mdf)

entry |1 pages

Membrane

entry |1 pages

Memorandum of understanding

entry |1 pages

Memorial

entry |2 pages

Merchantable quality

entry |1 pages

Mep

entry |1 pages

Metal conduit

entry |1 pages

Metal decking

entry |1 pages

Method statement

entry |1 pages

Methods of Assessment and Testing (Moat)

entry |1 pages

Mewp

entry |1 pages

Mewps

entry |1 pages

Mf/1

entry |1 pages

Mf/2

entry |1 pages

Mh

entry |1 pages

MicroStation

entry |1 pages

Midspan

entry |1 pages

Mild steel

entry |1 pages

Milestone

entry |1 pages

Mineral wool

entry |1 pages

Mini-trial

entry |1 pages

Minor Works Building Contract (Mw)

entry |1 pages

Misconduct

entry |2 pages

Misfeasance in public office

entry |1 pages

Misnomer

entry |1 pages

Misrepresentation

entry |1 pages

Misrepresentation Act 1967

entry |2 pages

Mistake

entry |1 pages

Mitigation

entry |1 pages

Mix

entry |1 pages

Mobilisation

entry |1 pages

Mock-up

entry |1 pages

Model

entry |1 pages

Model Law

entry |1 pages

Modular construction

entry |1 pages

Modular control

entry |1 pages

Modular ratio

entry |1 pages

Module

entry |1 pages

Modulus of elasticity

entry |1 pages

Moiety

entry |1 pages

Moisture barrier

entry |1 pages

Moisture content

entry |1 pages

Moisture expansion

entry |1 pages

Moisture meter

entry |1 pages

Moisture movement

entry |1 pages

Moment distribution

entry |1 pages

Month

entry |1 pages

Mortar

entry |1 pages

Mortise and tenon joint

entry |1 pages

Most Economically Advantageous Tender (Meat)

entry |1 pages

Movement joints

entry |1 pages

Mullion

entry |1 pages

Multi-disciplinary practice

entry |2 pages

Murphy v Brentwood

entry |1 pages

Mutatis mutandis

entry |1 pages

Mutual dealings

entry |1 pages

Mutual mistake

entry |1 pages

Mutually explanatory

chapter |8 pages

N

entry |1 pages

Naeci

entry |1 pages

Nail sickness

entry |1 pages

Nailing strip

entry |1 pages

Nailplate

entry |1 pages

Name borrowing

entry |1 pages

Named subcontractor

entry |1 pages

National Agreement for the Engineering Construction Industry (Naeci)

entry |1 pages

National Building Specification (Nbs)

entry |2 pages

National House Building Council (Nhbc)

entry |1 pages

National Joint Consultative Committee for Building (Njcc)

entry |1 pages

National Specialist Contractor's Council (Nscc)

entry |1 pages

Natural ground levels

entry |1 pages

Natural Justice

entry |1 pages

Natural ventilation

entry |1 pages

Nbs

entry |1 pages

Nda

entry |1 pages

Neat cement grout

entry |1 pages

Nec

entry |1 pages

Negative pressure

entry |1 pages

Negative rate

entry |1 pages

Negligence

entry |2 pages

Negligent Misrepresentation

entry |1 pages

Negligent misstatement

entry |1 pages

Negotiated procedure

entry |1 pages

Negotiations

entry |1 pages

Nemo dat quod non habet

entry |1 pages

Nemo debet esse judex in propria sua causa

entry |1 pages

Net contribution

entry |1 pages

Net floor area

entry |2 pages

Net lettable area

entry |1 pages

Network

entry |1 pages

Neutral

entry |1 pages

Neutral event

entry |1 pages

New Engineering Contract (Nec)

entry |1 pages

New York Convention

entry |1 pages

Newton

entry |1 pages

Nhbc

entry |1 pages

Nia

entry |1 pages

Nickel sulphide

entry |1 pages

Njcc

entry |1 pages

No damages for delay clause

entry |1 pages

Node

entry |1 pages

No-fines concrete

entry |1 pages

Nogging or Nog

entry |1 pages

Noise Rating (Nr)

entry |1 pages

Noise reduction coefficient

entry |1 pages

Nominal damages

entry |1 pages

Nominal dimension

entry |1 pages

Nominated subcontractor

entry |1 pages

Nominated supplier

entry |1 pages

Non-combustibility test

entry |1 pages

Non-completion certificate

entry |2 pages

Non-contestable work

entry |1 pages

Non-disclosure

entry |1 pages

Non-disclosure agreement (Nda)

entry |1 pages

Non est factum

entry |1 pages

Non illegitimi carborundum

entry |1 pages

Non-loadbearing wall

entry |1 pages

Non sequitur

entry |1 pages

Non-slip floors

entry |1 pages

Non-trafficable roof

entry |1 pages

Nosing

entry |1 pages

Notice

entry |1 pages

Notice to admit documents

entry |1 pages

Notice to admit facts

entry |1 pages

Notifiable projects

entry |2 pages

Novation

entry |1 pages

Novus actus interveniens

entry |1 pages

Nox

entry |1 pages

Nr

entry |1 pages

Nsc/4

entry |1 pages

Nscc

entry |1 pages

Nuclear Decommissioning Authority (Nda)

entry |1 pages

Nuclear energy

entry |1 pages

Nuclear Industry Association (Nia)

entry |1 pages

Nuclear reactor

entry |1 pages

Nuisance

chapter |7 pages

O

entry |1 pages

Oath

entry |1 pages

Obiter dictum

entry |1 pages

Objective approach

entry |1 pages

Obstruction

entry |1 pages

Occupancy

entry |1 pages

Occupiers' liability

entry |1 pages

Ocr

entry |1 pages

Odn

entry |1 pages

Off site

entry |2 pages

Offer

entry |1 pages

Offer to settle

entry |1 pages

Office cost

entry |1 pages

Official receiver

entry |1 pages

Official referee

entry |1 pages

Official referee's schedule

entry |1 pages

Ohp (OH&P)

entry |1 pages

Ojeu

entry |1 pages

Ojeu Notice

entry |1 pages

O&M

entry |1 pages

Omissions

entry |1 pages

On costs

entry |2 pages

On demand bond

entry |1 pages

One-line programme

entry |1 pages

Onerous property

entry |1 pages

Onus

entry |1 pages

Open book

entry |1 pages

Open-drained joint

entry |1 pages

Open offer

entry |1 pages

Open plan

entry |1 pages

Open procedure

entry |1 pages

Open tendering

entry |2 pages

Opening note and speech

entry |1 pages

Opening up

entry |1 pages

Operation and maintenance manual (O&M)

entry |1 pages

Operational bills

entry |1 pages

Operative

entry |1 pages

Opinion evidence

entry |1 pages

Optical character recognition

entry |1 pages

Optimum moisture content

entry |1 pages

Oral testimony

entry |1 pages

Orange Book Fidic

entry |1 pages

Order

entry |1 pages

Order 14

entry |1 pages

Ordinary meaning

entry |1 pages

Oriented strand board (Osb)

entry |1 pages

O-ring joint

entry |1 pages

Or other approved

entry |1 pages

Orthographic projection

entry |1 pages

Osb

entry |1 pages

Outer House

entry |1 pages

Outer string

entry |1 pages

Out of ground

entry |1 pages

Outline planning permission

entry |1 pages

Outrigger

entry |1 pages

Oven-dried timber

entry |1 pages

Overcladding

entry |1 pages

Overflow

entry |1 pages

Overflow rainwater gutter

entry |1 pages

Overhang

entry |1 pages

Overheads

entry |1 pages

Overheads and profit

entry |1 pages

Overpanel

entry |1 pages

Overriding objective

entry |1 pages

Oversail

entry |1 pages

Oversite concrete

entry |1 pages

Owner

entry |1 pages

Ownership

entry |1 pages

Oxidation

chapter |18 pages

P

entry |1 pages

Pabx

entry |1 pages

Package deal contract

entry |1 pages

Pad, padstone

entry |1 pages

Pagnan v Feed Products

entry |1 pages

Pain/gain share

entry |1 pages

Pali radice

entry |1 pages

Pallet

entry |1 pages

Pap

entry |1 pages

Paralegal

entry |1 pages

Parametric design

entry |1 pages

Parapet

entry |1 pages

Parent Company Guarantee

entry |1 pages

Pareto optimality

entry |1 pages

Pari passu

entry |2 pages

Sir Lindsay Parkinson (Sir Lindsay) & Co Ltd v Commissioners of Works and Public Buildings

entry |1 pages

Parole evidence rule

entry |1 pages

Parquet floor

entry |1 pages

Part 7 claim

entry |1 pages

Part 8 claim

entry |1 pages

Part 20 Claim

entry |1 pages

Part 36 Offer

entry |1 pages

Partial possession

entry |1 pages

Partiality

entry |2 pages

Particle board

entry |1 pages

Particulars of claim

entry |1 pages

Partition

entry |1 pages

Partner

entry |1 pages

Partnering

entry |1 pages

Partnership

entry |1 pages

Party wall

entry |1 pages

Party Wall Act 1996

entry |2 pages

Passing off

entry |1 pages

Passivation

entry |1 pages

Passive fire protection

entry |1 pages

Passive solar heating

entry |1 pages

Passivhaus

entry |1 pages

Patent ambiguity

entry |1 pages

Patent defects

entry |1 pages

Patent glazing

entry |1 pages

Patina

entry |1 pages

Pay direct clause

entry |2 pages

Payless notice

entry |1 pages

Payment into court

entry |1 pages

Payment notice

entry |1 pages

Pay-when-paid clause

entry |1 pages

Pba

entry |1 pages

Pc item or sum

entry |1 pages

Pd

entry |1 pages

Pea gravel

entry |1 pages

Penalty

entry |1 pages

Pencilling

entry |1 pages

Pepper v Hart

entry |1 pages

Peremptory order

entry |2 pages

Perforated brick

entry |1 pages

Performance bond or security

entry |1 pages

Performance specification

entry |1 pages

Performance Specified Work (Psw)

entry |1 pages

Performance test contract

entry |1 pages

Peril

entry |1 pages

Period of final measurement

entry |1 pages

Permanent works

entry |1 pages

Permitted development

entry |1 pages

Perpend

entry |1 pages

Person-in-charge

entry |1 pages

Perspex, Plexiglas

entry |1 pages

Pert

entry |1 pages

Pfi

entry |1 pages

Pfi contract

entry |1 pages

Pfp

entry |1 pages

pH

entry |1 pages

Phenolic foam

entry |1 pages

Piercing the corporate veil

entry |1 pages

Pig

entry |1 pages

Pilaster

entry |1 pages

Pile

entry |1 pages

Pink Book Fidic

entry |1 pages

Pinnel's case

entry |1 pages

Pitch

entry |1 pages

Pitched roof

entry |1 pages

Plain concrete

entry |1 pages

Plaintiff

entry |1 pages

Plan

entry |1 pages

Planning application

entry |1 pages

Planning conditions

entry |2 pages

Planning permission

entry |1 pages

Planning supervisor

entry |1 pages

Plant

entry |1 pages

Plant level

entry |1 pages

Plantroom

entry |1 pages

Plasterboard

entry |1 pages

Plasterwork

entry |1 pages

Plasticiser

entry |1 pages

Plate glass

entry |1 pages

Platform floor

entry |1 pages

Pleading

entry |1 pages

Plenum

entry |1 pages

Plexiglas

entry |1 pages

Plot ratio

entry |1 pages

Plumb

entry |1 pages

Plumb level

entry |1 pages

Plumb line

entry |1 pages

Plunge column

entry |1 pages

Plywood

entry |1 pages

Pointing

entry |1 pages

Point of law

entry |1 pages

Points of claim

entry |1 pages

Points of defence

entry |1 pages

Poisson distribution

entry |1 pages

Polybutylene

entry |1 pages

Polycarbonate sheet (Pc)

entry |1 pages

Polyethylene (Pe)

entry |1 pages

Polypropylene (Pp)

entry |1 pages

Polystyrene (Ps)

entry |1 pages

Polytetrafluorethylene (Ptfe)

entry |1 pages

Polyurethane (Pu)

entry |1 pages

Polyvinyl chloride (Pvc)

entry |1 pages

Polyvinyl fluoride (Pvf)

entry |1 pages

Polyvinylidene fluoride (Pvf2)

entry |1 pages

Pomi

entry |1 pages

Ponding

entry |1 pages

Portal frame

entry |2 pages

Porter v Magill

entry |1 pages

Portland cement

entry |1 pages

Portland stone

entry |1 pages

Possession

entry |1 pages

Post and beam construction

entry |1 pages

Postal (or posting) rule

entry |1 pages

Powder coating

entry |1 pages

Power float

entry |1 pages

Ppc2000

entry |1 pages

Ppp

entry |1 pages

Pqq

entry |1 pages

Practical completion

entry |1 pages

Practice Direction

entry |2 pages

Pre-action meeting

entry |1 pages

Pre-action protocol (Pap)

entry |1 pages

Preambles

entry |1 pages

Precedent

entry |1 pages

Prefabricated building

entry |1 pages

Preferential engineering

entry |2 pages

Preliminaries

entry |1 pages

Preliminary issue

entry |1 pages

Pre-patinated

entry |1 pages

Pre-qualification

entry |1 pages

Pre-qualification Questionnaire (Pqq)

entry |1 pages

Prescriptive specification

entry |1 pages

Pressed bricks

entry |1 pages

Pressed metal

entry |1 pages

Pressetext Nachrichtenagentur v Republik Oesterreich (Bund)

entry |1 pages

Prevention principle

entry |1 pages

Prima facie

entry |1 pages

Primavera Project Planner™ (P3)

entry |1 pages

Prime Contracting

entry |1 pages

Prime contractor

entry |2 pages

Prime cost

entry |1 pages

Prime cost contract

entry |1 pages

Prime cost (or Pc) sum

entry |1 pages

Principal

entry |1 pages

Principal contractor

entry |1 pages

Principal rafter

entry |1 pages

Priority of documents

entry |1 pages

Private automatic branch exchange (Pabx)

entry |2 pages

Private Finance Initiative (Pfi)

entry |1 pages

Privilege

entry |1 pages

Privity of contract

entry |1 pages

Privy Council

entry |1 pages

Probationary drawing

entry |1 pages

ProCure 21

entry |1 pages

Procurement

entry |1 pages

Procurement Regulations

entry |1 pages

Productivity

entry |1 pages

Profiled sheeting

entry |1 pages

Profit

entry |1 pages

Programme

entry |1 pages

Program Evaluation and Review Technique

entry |1 pages

Progress payment

entry |1 pages

Project bank account

entry |2 pages

Project manager

entry |1 pages

Project mediation

entry |1 pages

Project partnering

entry |1 pages

Projecting scaffold

entry |1 pages

Prolongation

entry |1 pages

Proof of debt

entry |1 pages

Property damage insurance

entry |1 pages

Proportionality

entry |1 pages

Proscenium arch

entry |1 pages

Prospective delay analysis

entry |1 pages

Protimeter

entry |1 pages

Provisional sum

entry |1 pages

Proximity

entry |1 pages

Psw

entry |1 pages

Ptfe

entry |1 pages

Ptr

entry |2 pages

Public Contracts Regulations 2006, Si 2006/5

entry |1 pages

Public–Private Partnership (Ppp)

entry |1 pages

Public procurement

entry |1 pages

Punch list

entry |1 pages

Pure economic loss

entry |1 pages

Purlin

entry |1 pages

The Purple Guide

entry |1 pages

Purposive construction

entry |1 pages

Pursuer

entry |1 pages

Push plate

entry |1 pages

Putlog scaffold

entry |1 pages

Pvb

entry |1 pages

Pvc

entry |1 pages

Pvcu

entry |1 pages

Pwr

chapter |3 pages

Q

entry |1 pages

Qa

entry |1 pages

Qc

entry |1 pages

Qc clause

entry |1 pages

Qm

entry |1 pages

Qs

entry |1 pages

Quality assurance (Qa)

entry |1 pages

Quality control

entry |1 pages

Quality management (Qm)

entry |1 pages

Quality of materials

entry |1 pages

Quality of workmanship

entry |1 pages

Quantities

entry |1 pages

Quantity Surveyor (Qs)

entry |1 pages

Quantum (of damages)

entry |2 pages

Quantum meruit

entry |1 pages

Quantum valebat

entry |1 pages

Quarry tiles

entry |1 pages

Quarter bend

entry |1 pages

Quarter-sawn timber

entry |1 pages

Quasi-arbitrator

entry |1 pages

Quasi-contract

entry |1 pages

Quatrefoil window

entry |1 pages

Queen Anne Architecture

entry |1 pages

Queen's Counsel (Qc)

entry |1 pages

Quia timet

entry |1 pages

Quicklime Lime

entry |1 pages

Quicquid plantatur solo, solo cedit

entry |1 pages

Quid pro quo

entry |1 pages

Quiet enjoyment

entry |1 pages

Quiet possession

entry |1 pages

Quoin

entry |1 pages

Quoin block

entry |1 pages

Quotation, quote

chapter |22 pages

R

entry |1 pages

Rabbet

entry |1 pages

Radial shrinkage

entry |1 pages

Radial-sett paving

entry |1 pages

Radiant heat(ing)

entry |1 pages

Radiation protection

entry |1 pages

Radioactivity

entry |1 pages

Radon

entry |1 pages

Raft foundation

entry |1 pages

Rafter

entry |1 pages

Rag

entry |1 pages

Rainscreen or rainscreen cladding

entry |1 pages

Rainwater outlet

entry |1 pages

Rainwater pipe

entry |1 pages

Raised floor

entry |1 pages

Raked-out joint

entry |1 pages

Ramsar site

entry |1 pages

Rapid Chemical Test

entry |1 pages

Rapid gravity filter

entry |1 pages

Rates

entry |1 pages

Rateable value

entry |1 pages

Ratification

entry |1 pages

Ratio decidendi

entry |1 pages

Rcd

entry |1 pages

Rdsap

entry |1 pages

Re

entry |1 pages

Ready-mixed concrete

entry |1 pages

Real evidence

entry |1 pages

Real property

entry |1 pages

Reasonable care and skill

entry |2 pages

Reasonable price

entry |1 pages

Reasonable skill and care

entry |1 pages

Reasonable time

entry |1 pages

Reasonableness test

entry |1 pages

Rebar

entry |1 pages

Rebate

entry |1 pages

Rebated joint

entry |1 pages

Rebound hammer test

entry |1 pages

Rebuilding

entry |1 pages

Receipts and expenditure method

entry |1 pages

Receptor

entry |1 pages

Recessed joint

entry |1 pages

Recharge

entry |1 pages

Re-circulated air

entry |1 pages

Recitals

entry |1 pages

Recklessness

entry |1 pages

Reclaiming

entry |1 pages

Reconstituted stone

entry |2 pages

Rectification

entry |1 pages

Rectification period

entry |1 pages

Recurring expenditure

entry |1 pages

Recycled water

entry |1 pages

Recycling

entry |1 pages

Red Book

entry |1 pages

Red Judge

entry |1 pages

Redevelopment

entry |1 pages

Reduced Data Standard Assessment Procedure

entry |1 pages

Reduced groundwater

entry |1 pages

Reduced level

entry |1 pages

Reef

entry |1 pages

Re-examination

entry |1 pages

Reference

entry |1 pages

Reference dose

entry |1 pages

Reference specification

entry |1 pages

Referral

entry |1 pages

Referral notice

entry |1 pages

Referring party

entry |1 pages

Reflectance

entry |1 pages

Reflective glass

entry |1 pages

Reflective insulation

entry |1 pages

Refractories

entry |1 pages

Refrigerant dehumidifier

entry |1 pages

Refuge

entry |1 pages

Refurbishment

entry |1 pages

Regent St disease

entry |1 pages

Regional Planning Body (Rpb)

entry |1 pages

Regional Planning Guidance (Rpg)

entry |1 pages

Regional Strategy (Rs)

entry |1 pages

Regional Spatial Strategy (Rss)

entry |1 pages

Register Plate

entry |1 pages

Registered land

entry |1 pages

Registered office

entry |1 pages

Registers of Scotland

entry |1 pages

Registry of Toxic Effects of Chemical Substances

entry |1 pages

Regolith

entry |2 pages

Regularly and diligently

entry |1 pages

Reinforced concrete

entry |1 pages

Reinforced masonry

entry |1 pages

Reinforcement

entry |1 pages

Reinforcement bar

entry |1 pages

Reinforcement schedule

entry |1 pages

Reinforcement spacer

entry |1 pages

Reinstatement

entry |1 pages

Reinstatement basis

entry |1 pages

Rejoinder

entry |1 pages

Relative humidity

entry |1 pages

Relative readings (R/R)

entry |2 pages

Relevant Events

entry |1 pages

Relevant Matters

entry |1 pages

Relief

entry |1 pages

Remeasurement

entry |1 pages

Remeasurement contract

entry |1 pages

Remedial Treatment Surveys

entry |1 pages

Remedial work

entry |1 pages

Remediation

entry |1 pages

Remedies Directive

entry |2 pages

Remedy

entry |1 pages

Remoteness of damage

entry |1 pages

Render

entry |1 pages

Renomination

entry |1 pages

Renovating plaster

entry |1 pages

Rent

entry |1 pages

Renunciation

entry |1 pages

Repair

entry |1 pages

Reply

entry |1 pages

Repointing

entry |1 pages

Representation

entry |1 pages

Repudiation

entry |1 pages

Request for Further Information

entry |1 pages

Request for Information (Rfi)

entry |1 pages

Rescission

entry |1 pages

Reserved matters

entry |1 pages

Reservoirs

entry |1 pages

Resident engineer (Re)

entry |1 pages

Residential Agency Guidelines (Rga) RICS

entry |1 pages

Residential occupier

entry |1 pages

Residual current device

entry |1 pages

Residual risk

entry |1 pages

Resilient flooring

entry |1 pages

Resin

entry |1 pages

Res inter alios acta non nocet

entry |1 pages

Res ipsa locquitur

entry |2 pages

Res judicata

entry |1 pages

Resistance

entry |1 pages

Resource

entry |1 pages

Resource levelling

entry |1 pages

Resourceful losing party

entry |1 pages

Responding party

entry |1 pages

Response

entry |1 pages

Restitutio in integrum

entry |1 pages

Restitution

entry |1 pages

Restricted procedure

entry |2 pages

Restrictive covenant

entry |1 pages

Retail Prices Index (Rpi)

entry |1 pages

Retainage

entry |1 pages

Retaining wall

entry |1 pages

Retention (monies)

entry |2 pages

Retention of title

entry |1 pages

Retrofit

entry |1 pages

Retrospective delay analysis

entry |1 pages

Return air

entry |1 pages

Return wall

entry |1 pages

Reveal

entry |1 pages

Reverberation time

entry |1 pages

Reverse premium

entry |1 pages

Reversible repair or improvement

entry |1 pages

Reversion

entry |1 pages

Revetment

entry |2 pages

Revision

entry |1 pages

Revocation of offer

entry |1 pages

Rfi

entry |1 pages

Rh

entry |1 pages

Rias

entry |1 pages

Rib and block suspended floor

entry |1 pages

Riba

entry |1 pages

Riba Code of Professional Conduct

entry |1 pages

Riba contract

entry |1 pages

Riba Outline Plan of Work

entry |1 pages

Riba Plan of work 2013

entry |1 pages

Riba Work Stages

entry |1 pages

Rics

entry |1 pages

Rics Code of Measuring Practice

entry |1 pages

Ridge

entry |1 pages

Ridge board

entry |1 pages

Ridge course

entry |1 pages

Ridge tile

entry |1 pages

Right in gross

entry |1 pages

Right to light

entry |1 pages

Right of support

entry |1 pages

Right of way

entry |1 pages

Rights of audience

entry |1 pages

Ring beam

entry |1 pages

Ring main

entry |1 pages

Riot

entry |1 pages

Riparian

entry |1 pages

Rise

entry |1 pages

Rise and fall clause

entry |1 pages

Rise over run

entry |1 pages

Riser

entry |1 pages

Rising damp

entry |1 pages

Risk allocation

entry |1 pages

Risk allowance

entry |1 pages

Risk assessment

entry |1 pages

Risk register

entry |1 pages

Risk value

entry |1 pages

Rock

entry |1 pages

Rock berm

entry |1 pages

Rodding

entry |1 pages

Rodding eye

entry |1 pages

Rolled steel joist (Rsj)

entry |1 pages

Roller shutter, roller door

entry |1 pages

Romalpa clause

entry |1 pages

Ronseal

entry |1 pages

Roof decking

entry |1 pages

Roof truss

entry |1 pages

Roofing felt

entry |1 pages

Room data sheets

entry |1 pages

Rot clause

entry |1 pages

Rough cutting

entry |1 pages

Rough opening

entry |1 pages

Routledge v Grant

entry |1 pages

Rowlock course

entry |1 pages

Royal assent

entry |1 pages

Royal Incorporation of Architects in Scotland (Rias)

entry |1 pages

Royal Institute of British Architects (Riba)

entry |2 pages

Royal Institution of Chartered Surveyors

entry |1 pages

Rpb

entry |1 pages

Rpg

entry |1 pages

Rpi

entry |1 pages

R/r

entry |1 pages

Rsj

entry |1 pages

Rs

entry |1 pages

Rss

entry |1 pages

Rtecs

entry |1 pages

Rule of law

entry |1 pages

Rules of construction

entry |1 pages

Rules of the Supreme Court (Rsc)

entry |1 pages

Running bond

entry |1 pages

Rustication

entry |1 pages

R-value

entry |1 pages

Rwp

entry |2 pages

Rylands v Fletcher liability

chapter |34 pages

S

entry |1 pages

Sacrificial coating

entry |1 pages

Sacrificial panel

entry |1 pages

Saddle scaffold

entry |1 pages

Saddle trusses

entry |1 pages

Saddle-jib crane

entry |1 pages

Safe working load (Swl)

entry |1 pages

Sale of goods

entry |1 pages

Same arbitrator provision

entry |1 pages

Sample panel

entry |1 pages

Sanctity of contract

entry |1 pages

Sand bedding

entry |1 pages

Sanderson order

entry |1 pages

Sandwich construction

entry |1 pages

Sap rating

entry |1 pages

Sarking felt

entry |1 pages

Sash Window

entry |1 pages

Satisfaction

entry |1 pages

Satisfactory quality

entry |1 pages

Save harmless

entry |1 pages

Saving the document

entry |1 pages

Sawn damp course

entry |1 pages

Sbc

entry |1 pages

Sbem

entry |1 pages

Sc

entry |1 pages

Scabbling

entry |1 pages

Scada

entry |1 pages

Scaffold coupler

entry |2 pages

Scaffold, scaffolding

entry |1 pages

Scafftag

entry |1 pages

Scale

entry |1 pages

Scale fees

entry |1 pages

Scaled dimension

entry |1 pages

Schedule

entry |1 pages

Schedule 2 quotation

entry |1 pages

Schedule of defects

entry |1 pages

Schedule of rates (Sor)

entry |1 pages

Scheduled monuments

entry |2 pages

Scheme for Construction Contracts (the Scheme)

entry |1 pages

Scheme of arrangement

entry |1 pages

Schmidt hammer test

entry |1 pages

Scientific and technical terms

entry |1 pages

Scissors lift

entry |1 pages

Scl

entry |1 pages

Scl Delay Protocol

entry |1 pages

Scope of works

entry |1 pages

Scott Schedule

entry |1 pages

Scott v Avery Clause

entry |1 pages

Screed

entry |1 pages

Scrim

entry |1 pages

S-curve

entry |1 pages

Seal

entry |1 pages

Sealed offer

entry |1 pages

Search order

entry |1 pages

Seasoning

entry |1 pages

Seat of the arbitration

entry |1 pages

Second fix or fixing

entry |1 pages

Secondary fixing

entry |1 pages

Secondary glazing

entry |1 pages

Secret fixings

entry |1 pages

Secret nailing

entry |1 pages

Section

entry |1 pages

Section 106 Agreement

entry |1 pages

Section 4 summons

entry |1 pages

Sectional completion

entry |1 pages

Security

entry |1 pages

Security for Costs

entry |2 pages

Security of payment

entry |1 pages

Seizure clause

entry |1 pages

Selected subcontractor

entry |1 pages

Selective tendering

entry |1 pages

Self-climbing tower crane

entry |1 pages

Self-curing

entry |1 pages

Self-levelling screed

entry |1 pages

Semble

entry |1 pages

Separable portion

entry |1 pages

Separating floor

entry |1 pages

Sequence of trades

entry |1 pages

Seriatim

entry |2 pages

Serious irregularity

entry |1 pages

Service

entry |1 pages

Service lift

entry |1 pages

Services

entry |1 pages

Services engineer

entry |1 pages

Set aside

entry |1 pages

Set off

entry |1 pages

Setting aside

entry |2 pages

Setting out

entry |1 pages

Settlement

entry |1 pages

Settlement Agreement

entry |1 pages

Shared proceeds provision

entry |1 pages

Shear

entry |1 pages

Shear force

entry |1 pages

Shear plate

entry |1 pages

Shear strain

entry |1 pages

Shear strength

entry |1 pages

Shear stress

entry |1 pages

Shear test

entry |1 pages

Shear wall

entry |1 pages

Sheathing felt

entry |1 pages

Sheet glass

entry |1 pages

Sheet metal

entry |1 pages

Sheet pile

entry |1 pages

Shell & core

entry |1 pages

Shiplap boards

entry |1 pages

Shock absorber clause

entry |1 pages

Shoe

entry |1 pages

Shop drawing

entry |1 pages

Shopping list principle

entry |1 pages

Shoring

entry |1 pages

Shower tray

entry |1 pages

Shutter, shuttering

entry |1 pages

Si

entry |1 pages

Sic

entry |1 pages

Sick building

entry |2 pages

Signature

entry |1 pages

Silver Book Fidic

entry |1 pages

Simon Carves Ltd v Ensus Uk Ltd

entry |1 pages

Simple contract

entry |1 pages

Simpliciter

entry |1 pages

Sine die

entry |1 pages

Sine qua non

entry |1 pages

Single arbitrator provision

entry |1 pages

Single joint expert

entry |1 pages

Single-line diagram

entry |1 pages

Single-ply roof

entry |1 pages

Single-stage selective tendering

entry |1 pages

Sips

entry |1 pages

Site accommodation

entry |1 pages

Site agent

entry |1 pages

Site boundary

entry |1 pages

Site clearance

entry |1 pages

Site clerk

entry |1 pages

Site diary

entry |1 pages

Site engineer

entry |1 pages

Site examination

entry |1 pages

Site instructions

entry |1 pages

Site investigations

entry |1 pages

Site manager

entry |1 pages

Site overheads

entry |1 pages

Site plan

entry |1 pages

Skeleton argument

entry |1 pages

Skill and care

entry |1 pages

Skim coat

entry |1 pages

Skirt

entry |2 pages

Skirting

entry |1 pages

Slab

entry |1 pages

Slack

entry |1 pages

Slag

entry |1 pages

Sleeper

entry |1 pages

Sleeper wall

entry |1 pages

Slip form

entry |1 pages

Slip joint

entry |1 pages

Slip rule

entry |1 pages

Slump test

entry |1 pages

Small and medium sized enterprise (Sme)

entry |1 pages

Small claims track

entry |1 pages

Small works agreement

entry |1 pages

Smith v South Wales Switchgear

entry |1 pages

Smm, SMM7

entry |1 pages

Snagging

entry |1 pages

Snagging list

entry |1 pages

Soffit

entry |1 pages

Soft landscaping

entry |1 pages

Softwood

entry |1 pages

Soil pipe

entry |1 pages

Soil stack

entry |1 pages

Soil vent

entry |1 pages

Solar-control glazing

entry |1 pages

Soldier course

entry |1 pages

Sole plate

entry |1 pages

Sole risk clause

entry |1 pages

Solid masonry unit

entry |1 pages

Sound insulation

entry |1 pages

Spacer

entry |1 pages

Spalling

entry |1 pages

Spandrel panel

entry |1 pages

Sparks or sparky

entry |1 pages

Spars

entry |1 pages

Spearin doctrine

entry |1 pages

Special

entry |1 pages

Special case

entry |1 pages

Special condition(s)

entry |1 pages

Special damages

entry |1 pages

Special Purpose Vehicle (Spv)

entry |1 pages

Specialist contractor

entry |1 pages

Specialty

entry |1 pages

Specific disclosure

entry |1 pages

Specific performance

entry |1 pages

Specification

entry |1 pages

Specified peril

entry |1 pages

Split brick

entry |1 pages

Split-face block

entry |1 pages

Spon's Price Books

entry |1 pages

Springer

entry |1 pages

Spv

entry |1 pages

Ssl

entry |1 pages

Sssi

entry |2 pages

Stability

entry |1 pages

Stack bonding

entry |1 pages

Stack effect

entry |1 pages

Stack pipe

entry |1 pages

Stack vent

entry |1 pages

Staffordshire blue brick/engineering brick

entry |1 pages

Stage payment

entry |1 pages

Stainless steel

entry |1 pages

Stakeholder

entry |1 pages

Stall riser

entry |1 pages

Stallboard

entry |1 pages

Stanchion

entry |1 pages

Standard basis

entry |1 pages

Standard Building Contract (Sbc)

entry |1 pages

Standard Commercial Property Conditions of Sale (2nd edn)

entry |1 pages

Standard form

entry |1 pages

Standard method claim

entry |1 pages

Standard method of measurement (Smm, SMM7)

entry |1 pages

Standard of care

entry |1 pages

Standard of proof

entry |1 pages

Standard special

entry |1 pages

Standby letter of credit

entry |1 pages

Standing offer

entry |1 pages

Standing seam

entry |1 pages

Standpipe

entry |1 pages

Standstill agreement

entry |1 pages

Standstill period

entry |1 pages

Star rate

entry |1 pages

Stare decisis

entry |1 pages

Start-to-finish relationship

entry |1 pages

Start-to-start relationship

entry |1 pages

Starter bar

entry |1 pages

State of the art

entry |1 pages

Statement of affairs

entry |1 pages

Statement of case

entry |1 pages

Statement of claim

entry |1 pages

Status quo

entry |1 pages

Statute

entry |1 pages

Statute barred

entry |2 pages

Statute of Frauds 1677

entry |1 pages

Statutory demand

entry |1 pages

Statutory duty

entry |1 pages

Statutory instruments

entry |1 pages

Statutory scheme

entry |1 pages

Statutory undertaker

entry |2 pages

Stay of execution

entry |1 pages

Stay of proceedings

entry |1 pages

Steel

entry |1 pages

Steel-fibre-reinforced concrete

entry |1 pages

Steel sections

entry |1 pages

Step-in rights

entry |1 pages

Stepped footing

entry |1 pages

Stick system

entry |1 pages

Sto render

entry |1 pages

Stock brick

entry |1 pages

Stockpile

entry |1 pages

Stop bead

entry |1 pages

Stop notice

entry |1 pages

Stopcock

entry |1 pages

Strain

entry |1 pages

S-trap

entry |1 pages

Stress

entry |1 pages

Stretcher course or bond

entry |1 pages

Strict construction

entry |1 pages

Strict liability

entry |1 pages

Strike

entry |1 pages

Striking

entry |1 pages

Striking off

entry |1 pages

Striking out

entry |1 pages

Striking time

entry |1 pages

String

entry |1 pages

String, stringer course

entry |1 pages

Strip footing

entry |1 pages

Stripping out

entry |1 pages

Strongboy

entry |1 pages

Structural concrete

entry |1 pages

Structural drawings

entry |1 pages

Structural engineer

entry |1 pages

Structural glazing

entry |1 pages

Structural polychromic

entry |1 pages

Structural slab level (Ssl)

entry |1 pages

Structural steelwork

entry |1 pages

Structure

entry |1 pages

Strut

entry |1 pages

Stud

entry |1 pages

Stud partition

entry |1 pages

Sub-base

entry |1 pages

Subbie

entry |2 pages

Subcontract

entry |1 pages

Subcontractor

entry |1 pages

Sub-floor

entry |1 pages

Sub-frame

entry |1 pages

Sub-grade

entry |1 pages

Subjective intentions

entry |1 pages

Subject to contract

entry |1 pages

Sub judice

entry |1 pages

Sublet

entry |1 pages

Sub-level

entry |1 pages

Sub-network

entry |1 pages

Subpoena

entry |1 pages

Subrogation

entry |1 pages

Subsidence

entry |1 pages

Subsidised housing scheme works contracts

entry |1 pages

Substantial completion

entry |1 pages

Substantial performance

entry |1 pages

Substantial remedy

entry |1 pages

Substation

entry |2 pages

Substituted contractor

entry |1 pages

Substructure

entry |1 pages

Suds

entry |1 pages

Sui generis

entry |1 pages

Suitability

entry |1 pages

Sulphate attack

entry |1 pages

Summary assessment

entry |1 pages

Summary judgment

entry |2 pages

Summons

entry |1 pages

Sunday and night working

entry |1 pages

Sun pipe/sun tube

entry |1 pages

Sunset date

entry |1 pages

Superplasticiser

entry |1 pages

Superstructure

entry |1 pages

Supervising officer

entry |1 pages

Supervision

entry |1 pages

Supervisor

entry |1 pages

Supplier

entry |1 pages

Supply and fix

entry |1 pages

Supply chain

entry |2 pages

Supply of documents

entry |1 pages

Supply of Goods & Services Act 1982

entry |1 pages

Supply only

entry |1 pages

Supra

entry |1 pages

Supreme Court

entry |1 pages

Surety

entry |1 pages

Surface coefficient

entry |1 pages

Surface retarder

entry |1 pages

Surface water attenuation

entry |1 pages

Surveyor

entry |1 pages

Suspended ceiling

entry |1 pages

Suspended floor

entry |1 pages

Suspension

entry |1 pages

Suspension bridge

entry |1 pages

Sustainability

entry |1 pages

Sustainable development

entry |1 pages

Sutcliff v Thackrah

entry |1 pages

Swan neck

entry |1 pages

Sweating

entry |1 pages

Swift

entry |1 pages

Switchroom

entry |1 pages

Swl

entry |1 pages

10% Syndrome

chapter |17 pages

T

entry |1 pages

T&Cs

entry |1 pages

Take-off or Taking off

entry |1 pages

Take or pay agreement

entry |1 pages

Take over or Taking over

entry |1 pages

Taking Over Certificate (Toc)

entry |1 pages

Tanking

entry |1 pages

Tap-off unit

entry |1 pages

Target contract

entry |1 pages

Target cost contract

entry |1 pages

Target price contract

entry |1 pages

Taxation

entry |1 pages

Tbm

entry |1 pages

Tecbar

entry |1 pages

TeCsa

entry |1 pages

Tcc

entry |1 pages

Tcc Guide

entry |1 pages

Technical query (Tq)

entry |1 pages

Technical terms

entry |1 pages

Technology and Construction Bar Association (Tecbar)

entry |1 pages

Technology and Construction Court (Tcc)

entry |1 pages

Technology and Construction Solicitors' Association (TeCsa)

entry |2 pages

Tell-tale

entry |2 pages

Tempered glass

entry |1 pages

Temporary benchmark (Tbm)

entry |1 pages

Temporary disconformity

entry |1 pages

Temporary works

entry |1 pages

Tender

entry |1 pages

Tender deposit

entry |2 pages

Tendering

entry |1 pages

Tenon

entry |1 pages

Tensile

entry |1 pages

Tension

entry |1 pages

Term contract

entry |1 pages

Terminal float

entry |1 pages

Termination

entry |1 pages

Terms of art

entry |1 pages

Terms of reference

entry |1 pages

Terrazzo

entry |2 pages

Terrorism

entry |1 pages

Terrorism cover

entry |1 pages

Tessellated pavement

entry |1 pages

Test piles

entry |1 pages

Test pit

entry |1 pages

Testimony

entry |1 pages

Test of reasonableness

entry |1 pages

Thaumasite

entry |1 pages

Theft

entry |2 pages

Thermal break

entry |1 pages

Thermal bridge

entry |1 pages

Thermal resistance

entry |1 pages

Thermal stress breakage

entry |1 pages

Thermal transmittance

entry |1 pages

Thermoset

entry |1 pages

Third fixing

entry |1 pages

Third party

entry |1 pages

Third party debt orders

entry |1 pages

Third party proceedings

entry |1 pages

Third surveyor

entry |1 pages

Thixotropic

entry |2 pages

Three Rivers District Council v Bank of England

entry |1 pages

Three rules of mitigation

entry |1 pages

Threshold

entry |1 pages

Threshold jurisdictional error

entry |1 pages

Tie beam

entry |1 pages

Tier-1 supplier

entry |1 pages

Tilos

entry |1 pages

Tilt-and-turn window

entry |1 pages

Timber

entry |1 pages

Timber Research and Development Association (Trada)

entry |2 pages

Time-at-large

entry |1 pages

Time bar

entry |1 pages

Time immemorial

entry |1 pages

Time of the essence

entry |2 pages

Time-impact analysis

entry |1 pages

Times Law Reports

entry |1 pages

Time-related costs

entry |1 pages

Time value of money

entry |1 pages

Title

entry |1 pages

Title block

entry |1 pages

Tlc

entry |1 pages

Tlr

entry |1 pages

Toc

entry |1 pages

Tolent clause

entry |1 pages

Tolerance

entry |1 pages

Tolling agreement

entry |1 pages

Tomlin order

entry |1 pages

Tongue and groove joint

entry |1 pages

Tooling

entry |1 pages

Toothing out

entry |1 pages

Top chord

entry |1 pages

Top-down construction

entry |1 pages

Top-hung window

entry |1 pages

Topping-out

entry |1 pages

Torpedo

entry |1 pages

Tort

entry |1 pages

Tortfeasor

entry |1 pages

Total float

entry |1 pages

Total loss claim

entry |1 pages

Total rise

entry |1 pages

Toughened glass

entry |1 pages

Tower crane

entry |1 pages

Tower scaffold

entry |1 pages

Town planning

entry |1 pages

Tpo

entry |1 pages

Tq

entry |1 pages

Trabeation

entry |1 pages

Trace heating

entry |1 pages

Tracery

entry |2 pages

Track allocation

entry |1 pages

Trada

entry |1 pages

Trade contractor

entry |1 pages

Trade usage

entry |1 pages

Traditional contract

entry |1 pages

Traditional procurement route

entry |1 pages

Trafficable roof

entry |1 pages

Transcript

entry |2 pages

Transfer of proceedings

entry |1 pages

Transmission

entry |1 pages

Transom

entry |1 pages

Transparency

entry |1 pages

Transparency International

entry |1 pages

Trap

entry |1 pages

Tread

entry |1 pages

Tree preservation order (Tpo)

entry |1 pages

Tree Preservation Orders: A guide to the Law and Good Practice (2000) with amendments (2009)

entry |1 pages

Trench-fill foundation

entry |2 pages

Trespass

entry |1 pages

Trial pit

entry |1 pages

Triaxial compression test

entry |1 pages

Tribology

entry |1 pages

Trimmer beam

entry |1 pages

Trunking

entry |1 pages

Truss

entry |1 pages

Trussed rafter

entry |1 pages

Trust

entry |1 pages

Trv

entry |1 pages

Tubular scaffolding

entry |1 pages

Tunnel boring machine

entry |1 pages

Turriff Construction Ltd v Regalia Knitting Mills Ltd

entry |1 pages

Turnkey contract

entry |1 pages

Turnover discount

entry |1 pages

Tuck pointing

entry |2 pages

Two-stage selective tendering

entry |1 pages

Typical detail

entry |1 pages

Typical floor

entry |1 pages

Tyrolean finish or render

chapter |5 pages

U

entry |1 pages

Uberrima fides

entry |1 pages

Ultra

entry |1 pages

Ultra vires

entry |1 pages

Ultraviolet radiation

entry |1 pages

Umbrella deed

entry |1 pages

Umpire

entry |1 pages

Unbonded screed

entry |1 pages

Uncertainty

entry |1 pages

Uncitral

entry |1 pages

Unconditional bond

entry |1 pages

Unconscionable bargain

entry |1 pages

Undercertification

entry |1 pages

Undercroft

entry |1 pages

Underfloor space

entry |1 pages

Underground services

entry |1 pages

Underlay

entry |1 pages

Underpinning

entry |1 pages

Undertaking

entry |1 pages

Undisclosed principal

entry |1 pages

Undue influence

entry |1 pages

Uneconomic working

entry |1 pages

Unenforceable contract

entry |1 pages

Unfair Contract Terms Act 1977

entry |1 pages

Unfixed materials

entry |1 pages

Unforeseen ground conditions

entry |1 pages

Ungley order

entry |1 pages

Unidroit

entry |1 pages

Uniformity

entry |1 pages

Unilateral contract

entry |1 pages

Unincorporated association

entry |1 pages

Uniplex (Uk) Ltd v NHS Business Services Authority

entry |1 pages

Unit price, unit rate

entry |1 pages

Universal beam (Ub) section

entry |1 pages

Universal column (Uc) section

entry |1 pages

Unjust enrichment

entry |1 pages

Unless order

entry |1 pages

Unliquidated damages

entry |1 pages

Unplasticised polyvinyl chloride (uPvc)

entry |1 pages

Unreasonably

entry |1 pages

Untrimmed floor

entry |1 pages

Uplift

entry |1 pages

Uplighter

entry |1 pages

Upon notice

entry |1 pages

Upside-down roof

entry |1 pages

Upstand

entry |1 pages

Upstand beam

entry |1 pages

uPvc

entry |1 pages

Usage

entry |1 pages

Utilities Contracts Regulations

entry |1 pages

U-value

chapter |4 pages

V

entry |1 pages

Vacate (a date)

entry |1 pages

Valley

entry |1 pages

Valuation

entry |1 pages

Value Added Tax (Vat)

entry |1 pages

Value engineering (Ve)

entry |1 pages

Vane testing

entry |1 pages

Vapour barrier

entry |1 pages

Vapour control layer

entry |1 pages

Variable air volume systems (Vav)

entry |1 pages

Variant bid

entry |1 pages

Variation

entry |1 pages

Variation in cost clause

entry |1 pages

Variation of price clause

entry |1 pages

Variation order

entry |1 pages

Vat

entry |1 pages

Vav

entry |1 pages

Ve

entry |1 pages

Veneer

entry |1 pages

Veneered wall

entry |1 pages

Ventilating brick

entry |1 pages

Ventilation

entry |1 pages

Ventilation pipe, vent pipe

entry |1 pages

Venting

entry |1 pages

Verba chartarum fortius accipiuntur contra proferentem

entry |1 pages

Verbatim

entry |1 pages

Verdigris

entry |1 pages

Verge

entry |1 pages

Vermiculite

entry |1 pages

Vesting

entry |1 pages

Vesting clause

entry |1 pages

Vertical production method

entry |1 pages

Vexatiously

entry |1 pages

Vicarious liability

entry |1 pages

Videlicet

entry |1 pages

View

entry |1 pages

Vis major

entry |1 pages

Vitiate

entry |1 pages

Viz

entry |1 pages

Void

entry |1 pages

Voidable

entry |1 pages

Volenti non fit injuria

entry |1 pages

Volume control damper

entry |1 pages

Voluntary arrangement

entry |1 pages

Volute

entry |1 pages

Vomitory/vomitorium

entry |1 pages

Voussoir

chapter |7 pages

W

entry |1 pages

Wainscot

entry |1 pages

Waist

entry |1 pages

Waiver

entry |1 pages

Wall anchor

entry |1 pages

Wall plate

entry |1 pages

Wall string

entry |1 pages

Wall tie

entry |1 pages

Wallboard

entry |2 pages

War

entry |1 pages

Warm roof

entry |1 pages

Warning

entry |1 pages

Warranty

entry |1 pages

Wasted cost order

entry |1 pages

Wasted expenditure

entry |1 pages

Water bar

entry |2 pages

Water content

entry |1 pages

Waterproofing

entry |1 pages

Wbp (Weather and Boil Proof) timber

entry |1 pages

Weather

entry |1 pages

Weatherstripping or Weather-stripping

entry |1 pages

Wednesbury grounds

entry |1 pages

Weekly Law Reports (Wlr)

entry |1 pages

Weephole

entry |1 pages

Wet rot

entry |1 pages

Wet trades

entry |1 pages

Whereas clause

entry |1 pages

White Book

entry |1 pages

Whrb

entry |1 pages

Whole life costs

entry |1 pages

Wickham test

entry |1 pages

Wild cat arbitration

entry |1 pages

Wilful misconduct

entry |1 pages

Williams v Fitzmaurice

entry |1 pages

Wind load

entry |1 pages

Winding up

entry |1 pages

Window board

entry |1 pages

Windows analysis

entry |1 pages

Winter working

entry |1 pages

Win-win situation

entry |1 pages

Wingman

entry |1 pages

Wireframe

entry |1 pages

Wire gauge

entry |1 pages

Wire-cut bricks

entry |1 pages

Wired glass

entry |1 pages

With costs

entry |1 pages

Withholding notice

entry |1 pages

Without prejudice

entry |1 pages

Without prejudice save as to costs

entry |1 pages

Witness

entry |1 pages

Witness conferencing

entry |1 pages

Witness purdah

entry |1 pages

Witness statement

entry |1 pages

Witness summary

entry |1 pages

Witness summons

entry |1 pages

Witney Town Council v Beam Construction (Cheltenham) Ltd

entry |1 pages

Wlr

entry |1 pages

Woolf Report

entry |1 pages

Work person

entry |1 pages

Workability

entry |1 pages

Working drawings

entry |1 pages

Workmanship

entry |1 pages

Works

entry |1 pages

Works contractor

entry |1 pages

Works information

entry |1 pages

Writ

entry |1 pages

Writ of execution

entry |1 pages

Writing

entry |1 pages

Written clauses

entry |1 pages

Written submissions

chapter |1 pages

X

entry |1 pages

Xeriscapeâ

entry |1 pages

Xestobium rufovillosum

entry |1 pages

Xps Extruded Polystyrene

entry |1 pages

Xylonite

entry |1 pages

Xylotechnigraphy

chapter |1 pages

Y

entry |1 pages

Y-value

entry |1 pages

Yard

entry |1 pages

Y2k

entry |1 pages

Ycms Ltd v Grabiner

entry |1 pages

Year

entry |1 pages

Yellow Book

entry |1 pages

Yett

entry |1 pages

Young's modulus

entry |1 pages

Youngman's board

entry |1 pages

Yuanda (Uk) Co Ltd v WW Gear Construction Ltd

entry |1 pages

Yurt

chapter |1 pages

Z

entry |1 pages

Z-bar

entry |1 pages

Z clause

entry |1 pages

Zealous witness

entry |1 pages

Zero-sum game

entry |1 pages

Z-form

entry |1 pages

Zinc roofing

entry |1 pages

Zipper clause

entry |1 pages

Zone of influence

entry |1 pages

Zoning

entry |1 pages

Z-purlin

entry |1 pages

Z-section