ABSTRACT

This paper presents an outline of the cross-connections at the Botlek Railway tunnel. The applied design and workmethod for the execution of the cross-connections proved to be both safe and effective. The project was completed successfully and has contributed very useful information about soil freezing and self compacting concrete in The Netherlands.