ABSTRACT

In this paper there are summed up the three stages of the RCC Esparragal dam construction: research for RCC mix design by means of laboratory tests, verification of the same one by a full-scale trial construction and, finally, the own construction of the dam, highlighting the aspects that have been considered more novel and interesting.