ABSTRACT

As the tunnel was to be constructed in the proximity of the airport runway, there was a strict height restriction for the construction activities. Low headroom plant and equipment were chosen to construct the diaphragm walls for the cut and cover tunnel. As the construction of the runway extension coincided with the tunnel construction, the top-down construction method was adopted.