ABSTRACT

ABSTRACT: Risk management in tunnelling is a continuous process from the alignment selection to the completion of the project. The usual steps of risk management, such as risk identification, avoidance or reduction during design development, risk sharing with the contractor, and controlling the remaining risk during construction equally apply to the tunnelling situation. Some basic elements of the risk management methodology and case histories are given.