ABSTRACT

ABSTRACT: The crucial challenge in MBT (Mixed Building Technology) are the connection elements between the different construction systems. A typical example of an MBT realisation is the ski jump tower in Innsbruck where a steel cage of hollow section trusses is cantilevering up to 12,5m from the central concrete tower in a height of about 35m above ground. The transfer of the localised truss forces into the concrete box section was solved by special prestressed docking devices.