ABSTRACT

Hai Phong seaport (HPP) is the 2nd largest in Vietnam and the largest in the North. This port system is under planning to handle ships up to 50,000 (full load) and 132,000 DWT (under load). There are 3 main terminal zones: Cam river terminals, Dinh Vu terminals, Lach Huyen terminals. They have built since 1874, 1964, 1994, 2007, 2010, 2012 and 2018 on soft soil. There is an increase in cargo throughput, quantity, type and size of the sea fleet thought Hai Phong fairways. This has profoundly affected the ports’ infrastructure and equipment. HPP have relatively sufficient characteristics of evaluation and maintenance in Vietnam. The paper presents these studies and show some suitable solutions to improve life service and capacity of HPP.