ABSTRACT

Two new adits, which are located between the two existing Northern line platform tunnels at Bank Station, would traditionally be approached and constructed using hand mining techniques. An innovative mechanised sprayed concrete lining (SCL) solution, with a lean support system, has provided greater working space and minimised the amount of hand excavation and manual handling, whilst simultaneously keeping the railway operational and reducing the construction programme duration and associated costs.