ABSTRACT

In the article, aspects of mining and geomechanical substantiation of the parameters of the system for the development of soluble salt deposits through wells drilled from the surface of the earth are considered. The main criteria for the stability of the chambers of underground dissolution and the sequence of the justification of their parameters are determined. As an example, the results of the mining and geomechanical justification for the development of industrial layers of the rock salt of the Ziminsky deposit are presented.