ABSTRACT

With the development of Nansha district and the construction of Nansha Free Trade Zone, the traffic network of Nansha district has undergone great changes. The traffic flow in Nansha District will continue to increase by 2025, and the existing road network is difficult to bear the increasing traffic volume. To improve the carrying capacity of the road network, this prediction analysis is carried out. On the basis of collecting basic traffic data such as land use planning, traffic flow direction and road network structure, and applying OD backtracking technology of TransCAD software to carry out traffic analysis, this paper predicts and analyzes the traffic demand of Nansha District in 2025.