ABSTRACT

In this paper, aiming at the difficulty of insufficient power supply capacity and difficult to implement power capacity increase in the comprehensive building of colleges and universities, a comprehensive building in our school is taken as the research object. Based on the idea of mining power supply capacity from itself, the improvement design scheme of distribution system is studied to alleviate electricity tension, reduce building energy consumption and improve the intelligent level of electricity management.