ABSTRACT

Aiming at the problem of the poor structural quality of fabricated continuous rigid-frame bridges, a multi-factor monitoring method of fabricated continuous rigid-frame bridge construction based on BIM is proposed. Based on BIM technology, the influencing factors and degree of rigid frame bridge construction quality are analyzed. The construction quality management evaluation algorithm is designed. The real-time monitoring of the construction of the prefabricated continuous rigid frame bridge is realized. Finally, experiments show that the multi-factor monitoring method of fabricated continuous rigid-frame bridge construction based on BIM has high practicability in the process of practical application and fully meets the research requirements.