ABSTRACT

Steel structure hoisting construction is a common construction type of substation construction project. Influenced by various factors such as narrow construction site, high altitude operation, high edge operation, and multi-work cross operation, to improve the safety and construction efficiency of steel structure hoisting construction of the substation has become one of the projects facing infrastructure projects of power grid enterprises. Based on the construction scheme and the main procedure, the optimal evaluation method based on fuzzy level analysis is constructed and the effectiveness of the model is verified with typical cases.